Vantage: Douglasville 3

Latest Podcast Riverside Parkway
Prospective Expansion
Prospective future expansion capacity
Operated by:

Vantage: Douglasville 3

Short Code: Building 3

Vantage Data Centers is building a 1.7 million sq ft data center complex in suburban Atlanta. The development would spread across 90 acres on Riverside Parkway in Douglasville. The campus would include three separate data center buildings ranging in size from 402K SF to 660K SF — a total footprint of 1.66 million square feet.

Map and Nearby Locations

Riverside Parkway ( Douglasville )
Vantage Data Centers Sites
Nearby Facilities

Sites within 15 miles of Vantage: Douglasville 3

Distance Site About
0.19 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
0.39 miles Vantage: Douglasville 1
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
1.20 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
1.44 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.50 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.59 miles Flexential: Douglasville 1
Douglasville 1 is the first building on Flexential's Atlanta-Douglasville campus at 1700 N. River Road, Douglasville, Georgia. The 204,514 sq ft building opened in 2023.
1.59 miles Central ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.60 miles CoreWeave: Douglasville, GA
CoreWeave, a GPU cloud provider, leases data center capacity inside Flexential's Douglasville facility on North River Road, west of Atlanta. Flexential owns and operates the building.
1.66 miles Center PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.68 miles Flexential: Douglasville 2
Douglasville 2 is the second building on Flexential's Atlanta-Douglasville campus at 1750 N. River Road, Douglasville, Georgia. The 310,000 sq ft building opened in 2024.
1.80 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
1.86 miles DC BLOX: ATL1-A
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
1.97 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
2.38 miles Vantage: GA22
This facility is part of Vantage's Project Westlake outside Atlanta, Georgia.
2.38 miles Vantage: GA21
Vantage Data Centers is building a data center campus outside Atlanta, Georgia. The project, known as Westlake, will comprise 754,220 square feet (70,070 sq m) on undeveloped land west of Plummer Road.
2.62 miles Hub OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.81 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
2.82 miles DataCanopy: Lithia Springs (Atlanta)
2.90 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
3.50 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
3.51 miles Mapletree: 375 Riverside Parkway
375 Riverside Parkway is a single-story data center building of about 250,000 sq ft in Lithia Springs, west of Atlanta. Digital Realty sold it to a Mapletree joint venture in January 2020, and Csquare operates two colocation suites inside.
3.59 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
3.60 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.64 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.68 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
3.69 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
3.70 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.71 miles Ridge ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.72 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
3.72 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
3.73 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.84 miles Switch: Atlanta 1
First building at Switch's The Keep campus, on its own parcel at 1 Switch Way in Lithia Springs. A global logistics company signed as the campus anchor tenant in 2020.
3.92 miles T5@Atlanta III Bldg 1
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
3.92 miles Switch: Atlanta 2
Second building at Switch's The Keep campus, on its own parcel at 2 Switch Way in Lithia Springs. Under construction since 2024.
3.94 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.96 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.96 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.97 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
3.97 miles STACK: ATL02A
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
4.04 miles Switch: Atlanta 3
4.05 miles STACK: ATL02D
4.10 miles Switch: Atlanta 4
Fourth building at Switch's The Keep campus, on its own parcel at 4 Switch Way in Lithia Springs. Under construction since 2024.
4.11 miles STACK: ATL02C
5.28 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
5.43 miles DataBank: Lithia Springs ATL6
ATL6 is the second and larger of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 460,000 square feet and 240,000 square feet of raised floor. Construction began in 2025.
5.51 miles DataBank: Lithia Springs ATL5
ATL5 is the first of two three-story data centers on DataBank's Lithia Springs Campus in South Fulton, with about 415,000 square feet and 160,200 square feet of raised floor. Construction began in 2024.
6.71 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
6.91 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.92 miles EdgeConneX ATL13
6.93 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.94 miles EdgeConneX ATL11
7.01 miles Prime CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.02 miles EdgeConneX ATL12
7.37 miles Metro CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.54 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.68 miles RSC: Stonewall Tell Data Center
RSC Investment Management plans a 1.9 million square foot, three-building data center campus on Stonewall Tell Road in the City of South Fulton, southwest of Atlanta.
7.89 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.81 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.00 miles Vantage: GA12
This facility is part of Vantage's Stacks Rd Campus in Georgia.
9.06 miles Vantage: GA11
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
10.68 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.68 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.72 miles WestInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.81 miles Lumen College Park 1
10.86 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
10.87 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.87 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
10.90 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.90 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.00 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.20 miles Campus TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.36 miles Douglas Waldrop Bldg-1
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
11.42 miles Douglas Waldrop Bldg-2
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
11.57 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
11.61 miles DataBank Atlanta ATL2
11.71 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
11.72 miles Lambda: Atlanta (EdgeConneX ATL02)
11.89 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
11.95 miles Lumen Atlanta 5
11.98 miles Edged Energy: ATL01-03
Edged is developing the ATL01-3 data center at 1740 Thomas Street NW in Atlanta, Georgia, as part of its larger Atlanta campus on the former Tilford Yard site.
11.98 miles Edged Energy: ATL01-02
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
12.00 miles Edged Energy: ATL01-01
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
12.00 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
12.01 miles Verizon: Atlanta (999 Lee St SW)
12.27 miles Saragon: Atlanta (1190 Allene)
Saragon's Atlanta data center at 1190 Allene Avenue SW offers about 36,000 sq ft of colocation space, with cabinets and private cages. Cogent Communications sold the building to Saragon, an I Squared Capital platform, in 2026.
12.37 miles Digital Realty: West End (713 RDA Blvd)
Digital Realty proposes a two-story, 282,000 sq ft data exchange with ground-floor retail on a vacant former printing plant in Atlanta's West End. The project needs a city zoning exemption.
12.37 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
12.59 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
12.60 miles T5: ATL IV
US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia.
12.62 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
12.65 miles QTS: Atlanta-1 DC1
A massive 970,000 sqft data center is one of the largest in the world.
12.74 miles QTS: Atlanta-1 DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
12.74 miles xAI: Atlanta (QTS Atlanta-1)
12.74 miles QTS: Atlanta-1 DC2
12.82 miles QTS: Atlanta-1 DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
12.83 miles Tower OneInterested in this information?Contact us
12.91 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.97 miles Youngwoo: 1611 Ellsworth
Youngwoo & Associates plans a mixed-use project at 1611 Ellsworth Industrial Boulevard in Atlanta's Blandtown area, pairing a data center of about 400,000 to 500,000 sq ft with a hotel and apartments.
13.22 miles Station BetaInterested in this information?Contact us
13.59 miles North StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.67 miles EdgeConneX: Hickman Property DC
The Hickman Property Data Center was a proposed mega-campus in unincorporated Douglas County, Georgia, near Villa Rica, developed by EdgeConneX through applicant entity East Village Dothan LLC.
13.79 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
13.81 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 were located in the 56 Marietta carrier hotel. Equinix closed both on July 31, 2024.
13.82 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
13.82 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
13.82 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
13.84 miles RadiusDC: 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
13.84 miles Coloblox: 55 Marietta
13.85 miles ATLDC 55 Marietta
13.85 miles CoreSite: AT1 Atlanta (55 Marietta)
CoreSite operates its AT1 colocation facility on four floors of the 55 Marietta Street carrier hotel in downtown Atlanta. American Tower bought the Colo Atl business in 2019 and moved the facility to CoreSite after acquiring CoreSite in 2021.
13.85 miles QuadraNet Atlanta
In 2015, QuadraNet opened its fourth North American data center located in Atlanta, Georgia.
13.85 miles Cogent: Atlanta
Cogent's Atlanta data center offers 7,826 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
13.86 miles CloudFirst: Colo@55 (55 Marietta)
13.92 miles CloudFirst: Atlanta (34 Peachtree)
13.93 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
13.93 miles Digital Realty: ATL14
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
13.94 miles Hivelocity: ATL2 (250 Williams)
14.05 miles Lumen Atlanta 2
14.06 miles 180 Peachtree
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
14.07 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
14.12 miles Southern Telecom Atlanta
14.15 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
14.41 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
14.41 miles Aptum Atlanta
The site was originally a Peer 1 site before the Cogeco acquisition. Cogeco Peer 1 changed name to Aptum Technologies in 2019.
14.42 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
14.42 miles Lumen Atlanta 1
14.49 miles Strategic Real: Palmetto 1
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
14.52 miles Strategic Real: Palmetto Expansion
15.11 miles T5: Project Pegasus (Coweta)
15.28 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
15.49 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
15.65 miles Lumen Atlanta 6
16.22 miles Carrier-Neutral Data CenterInterested in this information?Contact us
16.24 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
16.99 miles Prime Group: Edge GA10, Marietta
The Edge GA10 is a proposed data center in Marietta, Georgia, developed through the adaptive reuse of an existing self-storage facility outside Atlanta. Most of the site would continue operating as self-storage alongside the converted digital infrastructure space.
17.07 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
17.40 miles Shadowbox Studios: International Park (DeKalb)
Shadowbox Studios proposes a five-building data center campus on surplus industrial land beside its film studios in south DeKalb County. A county moratorium has stalled the plan.
17.42 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
17.84 miles QTS: Fayetteville DC2
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
17.86 miles Digital Realty: ATL16 (Fort Gillem)
18.24 miles Project Avemore
Atlas Development will construct a new data center on 428 acres near Atlanta, Georgia, in Villa Rica’s Carroll County along Hwy 61.
18.69 miles QTS: Fayetteville East Expansion
Fayetteville East Expansion (ATL2 East) is QTS's planned 313-acre, 2-million-sq-ft expansion of its Fayetteville campus west of Veterans Parkway in Fayetteville, Georgia.
18.80 miles Point GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.90 miles Crow Holdings: Fayetteville, GA
Crow Holdings Development has officially withdrawn its application to construct a single, two-story data center and dedicated substation on a 37.4-acre parcel of land in Fayetteville, Georgia.
18.98 miles QTS: Fayetteville DC1
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
18.98 miles Hyperscale Data CenterInterested in this information?Contact us
19.13 miles TA Realty: Ellenwood, ATL
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
19.47 miles PCC-DeKalb: Ellenwood, GA
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.

Vantage: Douglasville 3 Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.