Vantage: San Antonio TX11

Latest Podcast 14720 Omicron Dr
Operational
Fully operational facility
Operated by:

Vantage: San Antonio TX11

Short Code: TX11
Year Built: 2026
Floors: 2

Sites on this Campus:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

TX11 is the first data center on Vantage Data Centers' TX1 campus at 14720 Omicron Drive in San Antonio, Texas. The site sits on land Vantage bought from the University of Texas System Board of Regents in July 2023.

  • The two-story building spans 242,667 sq ft (22,545 sqm). The construction filing estimated the cost at close to $96 million.
  • Construction began in December 2023.

Map and Nearby Locations

14720 Omicron Dr
Vantage Data Centers Sites
Nearby Facilities

Vantage: San Antonio TX11 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage: San Antonio TX11

Distance Site About
0.08 miles Vantage: TX12
Vantage Data Centers is developing the TX12 facility, a two-story, 432,800 sq ft (40,208 sqm) data center in San Antonio, Texas. The $276.8 million project is scheduled for completion in August 2027.
0.12 miles CyrusOne: SAT7
This facility is a part of CyrusOne's San Antonio 5 Campus.
0.14 miles CyrusOne: SAT6
This facility is a part of CyrusOne's San Antonio 5 Campus.
0.18 miles CyrusOne: SAT8
CyrusOne operates its fifth data center campus in San Antonio, a facility comprising two buildings with a total of 276,000 square feet of space.
0.20 miles CyrusOne: SAT5
This campus is designed for 3 buildings, each of them being two stories.
0.25 miles CyrusOne: SAT9
This facility is a part of CyrusOne's SAT8 Campus in San Antonio.
0.30 miles CloudHQ: SAT5
This facility is a part of CloudHQ's planned San Antonio campus.
0.39 miles CloudHQ: SAT4
This facility is a part of CloudHQ's planned San Antonio campus.
0.47 miles CloudHQ: SAT3
This facility is a part of CloudHQ's planned San Antonio campus.
0.52 miles QTS San Antonio III
The 48-acre plot known as the "Omicron Subdivision" was subdivided into 3 plots and will be QTS's future expansion in San Antonio.
0.52 miles Core TowerInterested in this information?Contact us
0.55 miles CloudHQ: SAT2
This facility is a part of CloudHQ's planned San Antonio campus.
0.64 miles CloudHQ: SAT1
CloudHQ acquired more than 120 acres of land in June 2023 and plans to build a five-building campus.
0.84 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.85 miles Campus UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.86 miles CyrusOne: SAT11
In September 2023, Cyrusone acquired more than 25 acres nearby at 15355 Lambda Drive to construct two data centers, designated SAT10 and SAT11.
0.87 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.92 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.94 miles Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.95 miles CyrusOne: SAT10
In September 2023, Cyrusone acquired more than 25 acres nearby at 15355 Lambda Drive to construct two data centers, designated SAT10 and SAT11.
1.01 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.06 miles North PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.25 miles MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.86 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.04 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.07 miles Stream: SATB1
In June 2024, Stream Data Centers announced its groundbreaking of a new 135-acre hyperscale campus in San Antonio, Texas.
5.11 miles Stream: SATB2
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
5.17 miles Stream: SATB3
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
5.18 miles Stream: SATB5
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
5.18 miles Stream: SATB4
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
5.32 miles Global RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.34 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.53 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.77 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.60 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.62 miles Cloud TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.92 miles Vantage: TX22
Data center operator Vantage is developing a two-story, 214,525 square-foot (19,930 sqm) facility known as TX22.
7.00 miles CyrusOne: San Antonio SAT1
CyrusOne launched its first data center in San Antonio in 2012.
7.05 miles Vantage: San Antonio TX21
TX21 is the first data center on Vantage Data Centers' TX2 campus at 5207 Rogers Road in San Antonio, Texas.
7.14 miles West ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.26 miles ThreeInterested in this information?Contact us
7.33 miles Campus AlphaInterested in this information?Contact us
7.64 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.71 miles Valero Wiserman
7.94 miles CyrusOne: SAT2
Located near CyrusOne’s first San Antonio facility, the new site will have up to 196,000 colocation square feet (CSF) and 20,000 sq. ft. of superior Class A office space that can be used by customers.
7.95 miles CyrusOne: SAT3
8.05 miles Stream: San Antonio SATA1
8.09 miles CyrusOne: SAT4
8.51 miles QTS: San Antonio 2 Campus
QTS' San Antonio campus, located at 8535 Potranco Road, sits approximately eight miles east of the new plot.
9.37 miles Station PlusInterested in this information?Contact us
9.43 miles TowerInterested in this information?Contact us
9.84 miles Tract: Medina 1
Medina 1 is the first planned building at Tract's Medina Technology Park in Medina County, Texas.
9.94 miles Tract: Medina Expansion
9.98 miles Prime CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.00 miles Prime HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.26 miles CyrusOne: Castroville SAT14B
SAT14B is the second planned building on CyrusOne's Castroville SAT14 campus, north of US Highway 90 about 4 miles west of Castroville, Texas.
10.54 miles CyrusOne: Castroville SAT14A
SAT14A is the first building on CyrusOne's Castroville SAT14 campus, a single-story data center north of US Highway 90 about 4 miles west of Castroville, Texas.
13.54 miles Rowan: Cinco, TX
U.S. data center company Rowan Digital Infrastructure has started construction on its Cinco data center campus, a hyperscale project located near San Antonio, Texas.
14.32 miles University of Texas: Health Science Center
The UT Health San Antonio data center is a prefabricated modular solution.
15.20 miles Bexar Datacenter: San Antonio SAT1
Bexar Datacenter opened its San Antonio facility in 2005, providing both data center and office space at a single location.
16.40 miles Black Mountain: San Antonio, TX
Black Mountain Power, a subsidiary of the energy-focused Black Mountain family of companies, is transforming 432 acres in San Antonio into a massive "hyperscale-ready" data center campus.
17.08 miles Lumen San Antonio 2
17.91 miles Tract: Applewhite Tech Park
Tract is planning to build the Applewhite Technology Park on 339 acres of industrial land on the south side of San Antonio, near Toyota and Texas A&M San Antonio.
17.93 miles Cipher: San Antonio, Texas
Cipher Digital has secured an option on Apollo, a 288-acre development site located within 25 miles of San Antonio, Texas.
17.93 miles H5: San Antonio 2
H5 Data Centers is expanding its Texas footprint after executing a Letter of Intent (LOI) to acquire a new suburban San Antonio site.
18.22 miles H5 San Antonio - 100 Taylor
100 Taylor Street is San Antonio's Carrier Hotel.
19.44 miles Lumen San Antonio 3

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

0
Facilities
0
Markets

News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Vantage Data Centers Raises $2B For North American Development Portfolio
Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three devel...

Vantage Data Centers Raises $2B For North American Development Portfolio

September 15, 2026 Vantage Data Centers

Vantage Data Centers has secured $2 billion in financing to support early-stage development across its North American portfolio. The five-year revolving credit facility initially covers three development assets, with more eligible to be added. Vantage said the funding will accelerate project...

Read more
Read We Energies Begins Three Renewable Projects to Help Power Vantage Data Center
Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus i...

We Energies Begins Three Renewable Projects to Help Power Vantage Data Center

August 08, 2026 Vantage Data Centers

Wisconsin utility We Energies has begun construction on three renewable energy and battery storage projects, with about half of their combined capacity earmarked for a major AI data center campus in Port Washington. The projects include a 150MW solar farm with 50MWh of battery storage, a 110MW...

Read more
Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?