Overview
Düsseldorf is the capital of North Rhine-Westphalia and the state's main colocation market. Most of its capacity sits in one business park in Hassels, in the south of the city. Smaller sites sit downtown, in the northern districts and in suburbs such as Hilden, Meerbusch and Ratingen. Telecom carriers and corporate headquarters built the market. Since 2025, investors and specialist operators have bought its legacy buildings, and Microsoft has turned to farmland in the Rhein-Kreis Neuss for a hyperscale campus.
History
The market began in the telecom boom. Level 3 opened a data center in the Connecta business park in November 2000, and Interxion built its Düsseldorf campus in the same park. Equinix's DU1 on Albertstraße began as an IXEurope site, and Equinix ran a second site, DU2, from 2010 to 2016. In 2011 Interxion and DE-CIX launched DE-CIX Düsseldorf on the campus. Datacenter One opened a data center in Hilden in 2020, and Penta Infra bought a former Citibank data center in Meerbusch the same year. Ownership then turned over. Digital Realty took over Interxion in 2020, AtlasEdge bought Datacenter One in 2022, and nLighten took over EXA's Hilden edge site in 2023. In 2025 Principal Asset Management bought the Connecta park, and NorthC bought the former Level 3 building from Colt.
The Market Today
The Connecta park on In der Steele is the market's interconnection hub. Digital Realty runs three data centers there, and NorthC, plusserver and several carriers run sites in the neighbouring buildings. DE-CIX and ECIX both connect networks on the campus.
Equinix runs DU1 on Albertstraße. WIIT, renamed from myLoc in 2024, runs several colocation rooms in the north of the city, and ITENOS, Deutsche Telekom's data center company, runs another site in the north. In the suburbs, AtlasEdge and nLighten run data centers in Hilden, Penta Infra runs one in Meerbusch and Vodafone runs a large data center in Ratingen. Yexio opened a timber-built modular data center in Heiligenhaus in 2025, and tal.de and rgi serve Wuppertal and Remscheid.
Advantages
-
Interconnection. DE-CIX and ECIX both run exchanges in Düsseldorf. Carriers including Colt, Telia, Vodafone and Zayo have points of presence in the Hassels park.
-
Demand base. Vodafone Germany, Henkel, Metro and Rheinmetall have their headquarters in Düsseldorf. The Rhine-Ruhr around it is Germany's most populous metropolitan region.
-
Location. The city sits less than an hour from the Dutch border, between Amsterdam and Frankfurt, with an international airport.
-
Land to the west. The Rhenish lignite district in the Rhein-Kreis Neuss offers large plots near power infrastructure as coal plants close.
Challenges
-
Small plots. Inner-city plots are small. A 2026 planning inquiry for a data center on Zaunkönigweg places its own substation on the plot.
-
Power prices. German business electricity prices rank among the highest in the European Union.
-
Frankfurt's pull. Frankfurt is Germany's main colocation and interconnection hub, and Düsseldorf's sites are small next to its campuses.
-
Efficiency rules. New data centers opened from July 2026 must reach a power usage effectiveness (PUE) of 1.2 or better and reuse part of their waste heat.
Trends
-
Operators grow in place. Interxion leased more space at Hassels in 2021 on a 20-year term, and Penta Infra plans to grow its Meerbusch site into a campus.
-
Hyperscale reaches the Rhein-Kreis Neuss. Microsoft signed a conditional purchase for farmland in Grevenbroich in July 2026, its fourth site in the Rhenish district. The city must rezone the land first. In the same town, the city, the district and the state are seeking an investor for a hyperscale data center at the closed Frimmersdorf lignite plant.
Power and Policy
Amprion runs the transmission grid, and the Federal Network Agency (Bundesnetzagentur) regulates it. Netzgesellschaft Düsseldorf, a Stadtwerke Düsseldorf subsidiary, distributes power in the city, and Westnetz serves much of the surrounding Rhineland, including Grevenbroich. Since April 2026 transmission operators allocate large connections by project maturity. The federal Energy Efficiency Act (EnEfG) sets efficiency, waste-heat and renewable-power rules, and requires data centers of 300 kW or more to report to a federal register.