Dusseldorf / Düsseldorf Data Center Market

Latest Podcast
Düsseldorf is North Rhine-Westphalia's main colocation market, built around the Connecta park in Hassels where the DE-CIX and ECIX exchanges meet. Carriers and corporate headquarters anchor demand, and Microsoft has a conditional land deal in Grevenbroich. Small plots, grid upgrades and Frankfurt's pull limit growth. Read More

Market Facts

Dusseldorf / Düsseldorf Data Center Map

Dusseldorf / Düsseldorf Power Growth Over Time

+29% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Dusseldorf / Düsseldorf

Name Company Size Status Type
Digital Realty: DUS1 Digital Realty Trust Extra Small Operational Carrier-Neutral
Digital Realty: DUS2 Digital Realty Trust Extra Small Operational Carrier-Neutral
Digital Realty: DUS3 Digital Realty Trust Small Construction, Operational Carrier-Neutral
Equinix Düsseldorf DU1 Equinix Small Operational Carrier-Neutral
Equinix: Düsseldorf DU2 Equinix Decommissioned Carrier-Neutral
NorthC: Düsseldorf NorthC Datacenters Small Construction, Operational Carrier-Neutral
euNetworks Düsseldorf euNetworks Decommissioned Carrier
ITENOS Düsseldorf ITENOS Extra Small Operational Carrier-Neutral
Zaunkönigweg 8, Düsseldorf Unknown Company Land Bank Real Estate
PrimeInterested in this information?Contact us Microsoft Azure Land Bank Hyperscale
Vodafone: Ratingen Vodafone Small Operational Carrier
Penta Infra Dusseldorf Penta Infra Small Operational, Planned Carrier-Neutral
AtlasEdge: Düsseldorf AtlasEdge Small Operational, Planned Carrier-Neutral
nLighten Düsseldorf DUS1 nLighten Small Operational, Planned Carrier-Neutral
Systemec: DC Nettetal Systemec B.V. Extra Small Operational MSP
Connecta Park Complex Principal Asset Management Small Operational Private Equity
Yexio: Heiligenhaus Yorizon Cloud Extra Small Operational, Prospective Expansion Carrier-Neutral
TAL.DE: Wuppertal RZ1 TAL.DE GmbH Extra Small Operational MSP
Arelion: Düsseldorf DDF/B Arelion Extra Small Operational Carrier
Sievers: Dusseldorf Sievers Group Extra Small Operational MSP
plusserver: Düsseldorf DUS6 plusserver Extra Small Operational MSP
WIIT: Düsseldorf DUS1 WIIT Small Operational MSP
rgi: Remscheid rgi Extra Small Operational MSP
CSL: Düsseldorf CSL Computer Service Langenbach Extra Small Operational MSP

Largest Providers in Dusseldorf / Düsseldorf

Vodafone
Site
Power
Operational
1
12.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Principal Asset Management
Site
Power
Operational
1
10.7
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Digital Realty Trust
Site
Power
Operational
3
1.46
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider
NorthC Datacenters
Site
Power
Operational
1
1.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Dusseldorf / Düsseldorf

Location About Total SqFt Power (MW)
Vodafone: Ratingen
Vodafone's data center campus in the Lintorf district of Ratingen, north of Düsseldorf.
NN Request Dataset
Connecta Park Complex
Connecta Park is a multi-tenant business park in Düsseldorf-Hassels whose buildings house colocat...
NN Request Dataset NN Request Dataset
Digital Realty: DUS3 NN Request Dataset NN Request Dataset
AtlasEdge: Düsseldorf NN Request Dataset
WIIT: Düsseldorf DUS1 NN Request Dataset

About Dusseldorf / Düsseldorf

Overview

Düsseldorf is the capital of North Rhine-Westphalia and the state's main colocation market. Most of its capacity sits in one business park in Hassels, in the south of the city. Smaller sites sit downtown, in the northern districts and in suburbs such as Hilden, Meerbusch and Ratingen. Telecom carriers and corporate headquarters built the market. Since 2025, investors and specialist operators have bought its legacy buildings, and Microsoft has turned to farmland in the Rhein-Kreis Neuss for a hyperscale campus.

History

The market began in the telecom boom. Level 3 opened a data center in the Connecta business park in November 2000, and Interxion built its Düsseldorf campus in the same park. Equinix's DU1 on Albertstraße began as an IXEurope site, and Equinix ran a second site, DU2, from 2010 to 2016. In 2011 Interxion and DE-CIX launched DE-CIX Düsseldorf on the campus. Datacenter One opened a data center in Hilden in 2020, and Penta Infra bought a former Citibank data center in Meerbusch the same year. Ownership then turned over. Digital Realty took over Interxion in 2020, AtlasEdge bought Datacenter One in 2022, and nLighten took over EXA's Hilden edge site in 2023. In 2025 Principal Asset Management bought the Connecta park, and NorthC bought the former Level 3 building from Colt.

The Market Today

The Connecta park on In der Steele is the market's interconnection hub. Digital Realty runs three data centers there, and NorthC, plusserver and several carriers run sites in the neighbouring buildings. DE-CIX and ECIX both connect networks on the campus.

Equinix runs DU1 on Albertstraße. WIIT, renamed from myLoc in 2024, runs several colocation rooms in the north of the city, and ITENOS, Deutsche Telekom's data center company, runs another site in the north. In the suburbs, AtlasEdge and nLighten run data centers in Hilden, Penta Infra runs one in Meerbusch and Vodafone runs a large data center in Ratingen. Yexio opened a timber-built modular data center in Heiligenhaus in 2025, and tal.de and rgi serve Wuppertal and Remscheid.

Advantages

  • Interconnection. DE-CIX and ECIX both run exchanges in Düsseldorf. Carriers including Colt, Telia, Vodafone and Zayo have points of presence in the Hassels park.
  • Demand base. Vodafone Germany, Henkel, Metro and Rheinmetall have their headquarters in Düsseldorf. The Rhine-Ruhr around it is Germany's most populous metropolitan region.
  • Location. The city sits less than an hour from the Dutch border, between Amsterdam and Frankfurt, with an international airport.
  • Land to the west. The Rhenish lignite district in the Rhein-Kreis Neuss offers large plots near power infrastructure as coal plants close.

Challenges

  • Small plots. Inner-city plots are small. A 2026 planning inquiry for a data center on Zaunkönigweg places its own substation on the plot.
  • Power prices. German business electricity prices rank among the highest in the European Union.
  • Frankfurt's pull. Frankfurt is Germany's main colocation and interconnection hub, and Düsseldorf's sites are small next to its campuses.
  • Efficiency rules. New data centers opened from July 2026 must reach a power usage effectiveness (PUE) of 1.2 or better and reuse part of their waste heat.

Trends

  • Operators grow in place. Interxion leased more space at Hassels in 2021 on a 20-year term, and Penta Infra plans to grow its Meerbusch site into a campus.
  • Hyperscale reaches the Rhein-Kreis Neuss. Microsoft signed a conditional purchase for farmland in Grevenbroich in July 2026, its fourth site in the Rhenish district. The city must rezone the land first. In the same town, the city, the district and the state are seeking an investor for a hyperscale data center at the closed Frimmersdorf lignite plant.

Power and Policy

Amprion runs the transmission grid, and the Federal Network Agency (Bundesnetzagentur) regulates it. Netzgesellschaft Düsseldorf, a Stadtwerke Düsseldorf subsidiary, distributes power in the city, and Westnetz serves much of the surrounding Rhineland, including Grevenbroich. Since April 2026 transmission operators allocate large connections by project maturity. The federal Energy Efficiency Act (EnEfG) sets efficiency, waste-heat and renewable-power rules, and requires data centers of 300 kW or more to report to a federal register.

Get Quotes

Related News See all

Read Vodafone Plans to Grow Safaricom Data Center Capacity to 35MW
[Vodafone](https://baxtel.com/data-centers/vodafone) plans to grow [Safaricom](https://baxtel.com/data-centers/safaricom-plc)'s data center capacity from 9.1MW to 35MW, the group said in its [H1 FY...

Vodafone Plans to Grow Safaricom Data Center Capacity to 35MW

November 28, 2026 Safaricom PLC

Vodafone plans to grow Safaricom's data center capacity from 9.1MW to 35MW, the group said in its H1 FY27 results presentation. The presentation, published on 10 November, sets a target of two central data centers across Kenya and Ethiopia. Safaricom's 9.1MW today is spread across six...

Read more
Read Rolling Meadows Approves Digital Realty's 156MW Data Center Campus
Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook Coun...

Rolling Meadows Approves Digital Realty's 156MW Data Center Campus

November 25, 2026 Digital Realty Trust

Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook County Class 6b tax break for the project at 3800 Golf Road, CBS Chicago reported. The council also...

Read more
Read Microsoft Files for 316.7-Acre LVL-16 Data Center Campus in Mecklenburg County
Microsoft has applied to the [US Army Corps of Engineers](https://www.nao.usace.army.mil/Media/Public-Notices/Article/4652463/nao-2024-02558-vrmc-26-1656-lvl16-visor-king-data-center-mecklenburg-va...

Microsoft Files for 316.7-Acre LVL-16 Data Center Campus in Mecklenburg County

November 20, 2026 Microsoft Azure

Microsoft has applied to the US Army Corps of Engineers for a five-building data center campus on 316.7 acres in Mecklenburg County, Virginia. Microsoft filed the application, labeled LVL-16, with the corps' Norfolk District under Section 404 of the Clean Water Act. The Norfolk District is...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

November 18, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois
The City of Rockford named [Microsoft](https://baxtel.com/data-centers/microsoft-azure) on Nov. 13 as the company evaluating a Monarch Energy-controlled pro![msblogs.thesourcemediaassets.com](/rail...

Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois

November 16, 2026 Microsoft Azure

The City of Rockford named Microsoft on Nov. 13 as the company evaluating a Monarch Energy-controlled property in south Rockford for a data center campus. Microsoft is conducting due diligence on the land and has not submitted a proposal, the city said in its announcement. The land sits along...

Read more
Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.