Aptum Miami

Latest Podcast
2300 NW 89th Place
Operational
Fully operational facility
Operated by:

Aptum Miami

Year Built: 2002
This site is leased from Unknown Company in the 2300 NW 89th PI building
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

The site was originally a Peer 1 site before the Cogeco acquisition.

Map and Nearby Locations:

2300 NW 89th Place
Aptum Technologies Sites
Nearby Facilities

Sites within 15 miles of Aptum Miami

Distance Site About
0.02 miles 2300 NW 89th PI
In August 2025, Digital Realty sold its Miami data center for $8 million.
0.60 miles CoreSite MI2
0.95 miles Equinix Miami MI6
1.85 miles AT&T MIA1
The AT&T Miami data center is located in Fontainebleau and next to the Mall to the Americas
2.29 miles QTS Miami
The QTS Miami data center rated to survive a category 5 hurricane, is above the 500-year flood level, and also has 3,000 sq. ft. of office space
2.30 miles RadiusDC: Miami I
The site was formerly managed by Telefonica until Nabiax acquired it in 2020. On 13 June 2023, Nabiax sold its American-based data centers to the investment fund Actis.
2.38 miles EdgeConneX MIA01
Customer work spaces are available Raised Floor: 30" EdgeConnex has rights to adjacent space to accommodate expansion.
4.97 miles Metrobloks: Miami MIA-A1
The 112,900 SF facility offers customizable rack densities from 5kW to 150+kW, hybrid cooling options (air, liquid, or mixed), and modular scalability from 3MW to 12MW per hall.
7.02 miles CoreSite Miami MI1
CoreSite’s MI1 data center in Miami provides connectivity from the U.S. to South America, as well as existing and scalable connectivity to NAP of the Americas. Built to withstand a Category 5 hurricane.
7.97 miles ifx Miami
8.57 miles Iron Mountain: Miami MIA1
Located in Miami's District 12 on a 3.4-acre site, the 150,000 sq ft (13,935 sqm) facility is slated to operate on 100 percent carbon-free energy upon its 2026 launch.
9.27 miles Lumen: Miami 1 (49 Northwest 5th)
9.36 miles Lumen: Miami 2
9.37 miles NAP of the Americas - Equinix Miami MI1
Equinix has 4 data centers in the Miami area, but the MI1 site is their flagship. Not only is it the biggest Equinix facility in Flordia, but it is the best connected. Equinix acquired NOTA as well as 28 other data centers from Verizon in 2017.
9.42 miles Fiberhub MIA1
9.43 miles QuadraNet Miami
9.43 miles Equinix Miami MI2
9.43 miles ColoHouse Miami
9.43 miles 36 NE 2nd - Digital Realty
The building is one of Miami's top interconnection points the building is home to the former Telx bMMR, Equinix MI2 which is a former Switch and Data site, and ColoHouse.
9.43 miles DataBank MIA1
Customers can utilize Zayos fiber and lit services to reach the Nap of the Americas
9.64 miles Cogent: 200 SE 1st
9.69 miles Real Estate Data Center Request Dataset
9.72 miles Volico MIA1
9.91 miles iM Critical Miami
11.58 miles Verizon: 16583 NW 15th
14.01 miles Edgeconnex Miami MIA02

Aptum Miami Data Center Photos (See all)

Cogeco Peer 1 rebranded to Aptum Technologies in August 2019
RIP: The Cogeco Peer 1 Logo
Source: Baxtel

Cogeco Peer 1 rebranded to Aptum Technologies in August 2019

Operating Company

Operated by:

Cogeco Peer 1 has changed its name to Aptum Technologies. The move follows the April 2019, acquisition of Cogeco Peer 1 by Digital Colony, a global investment firm dedicated to strategic opportunities in digital infrastructure.

6
Facilities
5
Markets
15MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?