Malaysia Data Center Market

Login to Add Favorite Login to

The Malaysia Data Center Map Has 25 Sites

Search Malaysia's Data Centers


Malaysia Data Center List

AIMS Cyberjaya CJ1
Jalan Cyber Point 4
Cyber 8, 63000 Cyberjaya, Selangor, Malaysia
Located in Kuala Lumpur
  • 68,000 Gross SqFt
AIMS Kuala Lumpur Menara
Changkat Raja Chulan
Bukit Ceylon, 50200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
Located in Kuala Lumpur
  • 8.0 Megawatts
AIMS Suntech @ Penang Cybercity
1-18-8
Suntech @ Penang Cybercity, Lintang Mayang Pasir 3, Bayan Baru, 11950 Bayan Lepas, Pulau Pinang, Malaysia
  • 10,764 Gross SqFt

The office building (which contains the data centre) is centrally located at the heart of the Penang Cybercity business district, Bayan Baru.

Bridge Data Centres Cyberjaya MY01
MY01
7118, Jalan Impact, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia
Located in Kuala Lumpur
  • 157,500 Gross SqFt
  • 25.6 Megawatts
Bridge Data Centres Cyberjaya MY02
MY02
Jalan Cyber Point 2, Cyber 12, 63000 Cyberjaya, Selangor, Malaysia
Located in Kuala Lumpur
  • 200,000 Gross SqFt
  • 550,000 Building SqFt

Malaysia is a data center market on the upswing. It provides an alternative to Singapore as it is geographically adjacent to the leading APAC market.

Malaysia also offers some of the most inexpensive electrical utility pricing in the ASEAN region.





Top Data Center Providers in Malaysia

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Bridge Data Centres 2 357,500 25.60
VADS Berhad 3 202,176 26.40
AIMS Data Centre Sdn Bhd 3 78,764 8.00
NTT MSC Sdn. Bhd 5 75,500 0.00
TelcoHubExchange 1 0 0.00
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Data Centers in Malaysia

Gross SqFt Gross SqFt Power (MW) Power (MW)
Bridge Data Centres Cyberjaya MY02 200,000
Bridge Data Centres Cyberjaya MY01 157,500 25.60
VADS Iskandar Puteri Core Data Centre (IPDC) 112,176 6.40
VADS Cyberjaya Klang Valley (KVDC) 90,000 20.00
AIMS Cyberjaya CJ1 68,000
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top Malaysia Datacenter Markets by # of Sites

Loading...

Top Malaysia Datacenter Markets by Power Capacity (MW)

Loading...
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Designated staging area is available for customer use.
Meeting room is available next to the staging area.
NTT CBJ 3 Data Center
Posted in NTT Cyberjaya 3
NTT CBJ3 Technology Center
Posted in NTT Cyberjaya 3 Source: Nakano Construction
NTT MSC TECHNOLOGY CENTER (CBJ3)
Posted in NTT Cyberjaya 3 Source: Green Building Index
Exterior View at Night
Posted in Bridge Data Centres Cyberjaya MY01 Source: Bridge Data Centres
Exterior
Posted in Bridge Data Centres Cyberjaya MY01 Source: Bridge Data Centres
Suntech Sign In Front of Building
Posted in AIMS Suntech @ Penang Cybercity
NTT's Sora Data Centre
Posted in NTT Cyberjaya 4 Source: Shaw Architect
Ground Floor Plan for CBJ3 and CBJ4
Posted in NTT Cyberjaya 4
CB5 and CB6 Expansion Plans
Posted in NTT Cyberjaya 4
Sectional Perspective
Posted in NTT Cyberjaya 4 Source: Shaw Architect
Cyberjaya 4 Lounge Area
Posted in NTT Cyberjaya 4
Seamless Cloud for the World
Posted in NTT Cyberjaya 4
CBJ4 Office Area
Posted in NTT Cyberjaya 4
Reception Counter
Posted in NTT Cyberjaya 4 Source: H Lin Ho
Drop Off Area
Posted in NTT Cyberjaya 4 Source: H Lin Ho
NOC Room
Posted in NTT Cyberjaya 4 Source: H Lin Ho
Lobby Area
Posted in NTT Cyberjaya 4 Source: H Lin Ho
Large Bonsai Tree
Posted in NTT Cyberjaya 4 Source: H Lin Ho
Contained Colocation Room
Posted in NTT Cyberjaya 4
Nexcenter Hallway at CBJ4
Posted in NTT Cyberjaya 4
NTT's MSC Global Solution Center (Office)
Posted in NTT Cyberjaya 4
View of CBJ3 and CBJ4
Posted in NTT Cyberjaya 4 Source: Leang Wai Loon
2017 Cyberjaya4 Expansion
Posted in NTT Cyberjaya 4
MSC Global Solution Office
Posted in NTT Cyberjaya 4
NTT Malaysia Cyberjaya 4 Data Center
Posted in NTT Cyberjaya 4 Source: NTT
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Loading Bay
Posted in NTT Cyberjaya 4

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.

Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Posted in NTT Cyberjaya 4

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.

Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Posted in NTT Cyberjaya 4

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.

NTT provides power capacity and associate cooling of at least 3kVA per rack.

Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Posted in NTT Cyberjaya 4

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Source: NTT

Designated staging area is available for customer use.
Staging Area
Posted in NTT Cyberjaya 4

Designated staging area is available for customer use.

Source: NTT
Meeting room is available next to the staging area.
Customer Meeting Room
Posted in NTT Cyberjaya 4

Meeting room is available next to the staging area.

Source: NTT
Grand opening of the KVDC in 2019
Posted in VADS Cyberjaya Klang Valley (KVDC)