|
0.05 miles
|
DataCanopy: Houston, TX
|
|
|
0.22 miles
|
DataBank Westway Park II
|
|
|
0.32 miles
|
DataBank Westway Park I
|
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
|
2.27 miles
|
Lumen: Houston 5
|
|
|
9.05 miles
|
Prescott Realty Group-5959 Corporate
|
|
|
10.14 miles
|
ViVaVerse: Viva Center
|
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
|
10.20 miles
|
LOGIX 4635 Southwest Fwy
|
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
|
10.45 miles
|
Serverfarm: CTX1 Building 2
|
CTX1 Building 2 is a 263,811 sq ft data center at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, built for HP and refit for a tenant in 2025.
|
|
10.58 miles
|
DataBank Houston Galleria
|
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|
|
10.59 miles
|
Serverfarm: CTX1 Building 1
|
Serverfarm's original CTX1 Building 1, a 214,446 sq ft data center at 15555 Cutten Road built for HP. Serverfarm demolished it in 2025 and is building CTX2 on its footprint.
|
|
10.59 miles
|
Serverfarm: CTX2
|
CTX2 is a data center under construction at 15555 Cutten Road on Serverfarm's Cypress Creek CTX campus in northwest Houston, on the footprint of the original CTX1 Building 1.
|
|
10.66 miles
|
Switch: Houston 3
|
Houston 3 is Switch's planned second data center on the vacant west 10 acres of its Greenspoint campus in North Houston. Switch announced it with the 2021 Data Foundry purchase; no building permit has been filed.
|
|
10.67 miles
|
Windstream Houston
|
Previously a PAETEC data center
|
|
10.74 miles
|
Switch: Houston 2
|
Houston 2 is a 125,000 sq ft purpose-built data center with a two-story office wing on Switch's Greenspoint campus in North Houston. Data Foundry opened it in 2015 and added a second data hall in 2020; Switch bought it in 2021 and added a UPS and generator wing on the south side.
|
|
10.94 miles
|
12001-12235 North Freeway - Digital Realty
|
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
|
|
10.99 miles
|
Lumen Houston 1
|
|
|
11.01 miles
|
Fibertown Houston
|
Fibertown operates a data center in Houston built around 2011.
|
|
11.01 miles
|
11:11 Systems: Houston
|
|
|
11.05 miles
|
Cogent: 12061 N Freeway
|
Cogent's 27,000 sqft data center in Houston offers retail colocation
|
|
11.52 miles
|
Verizon: 2401 Portsmouth
|
Former XO Communications site
|
|
11.59 miles
|
EdgeConneX Houston
|
Customer work spaces are available
Raised Floor: 30"
EdgeConnex has rights to adjacent space to accommodate expansion.
|
|
11.59 miles
|
ScaleMatrix Houston
|
The Scalematrix site can expand by an additional 15,000 Square Feet
|
|
11.60 miles
|
LOGIX Primewest Pkw
|
The site was operated by Alpheus before Logix acquired it in January 2018.
|
|
12.02 miles
|
Element Critical: Houston One DC2
|
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
|
|
12.07 miles
|
Element Critical: Houston One DC1
|
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
|
|
13.02 miles
|
LOGIX Houston (777 Walker)
|
The 777 Walker data center is only one city block from the Alpheus fiber network hub at 1010 Travis, and is interconnected with it on a high capacity DWDM system.
|
|
13.02 miles
|
Two Shell Plaza (777 Walker)
|
|
|
13.14 miles
|
Dataprana: Houston 1
|
Dataprana has secured a greenfield site in the Houston metropolitan area for a prefabricated AI and high-performance computing development. The parcel is positioned near existing electrical infrastructure and is being prepared for phased energization.
|
|
13.23 miles
|
Quasar Data Center Houston
|
|
|
13.24 miles
|
Verizon: 1301 Fannin
|
|
|
13.24 miles
|
1301 Fannin - Netrality Houston
|
1301 Fannin Street is a 25 story 1.1 million square building which was acquired in 2015 by Netrality. 1301 Fannin is the primary telecom hotel and interconnection point in Houston. Netrality operates as a carrier-neutral facility manages the Meet Me Room
|
|
13.34 miles
|
Equinix Houston HO1
|
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
|
|
13.46 miles
|
Iozera: Houston, TX
|
Iozera has acquired an operational enterprise data center in Houston, Texas, with plans to transform it into a cutting-edge, AI-ready multi-tenant hub capable of hosting Nvidia Blackwell GPUs.
|
|
13.53 miles
|
Lumen Houston 4
|
|
|
13.80 miles
|
Lumen Houston 3
|
|
|
13.92 miles
|
Dataprana: Houston 2
|
Dataprana has secured a second greenfield parcel in the Houston metropolitan area for an AI and high-performance computing development. The project is planned around nearby power infrastructure and an accelerated, phased delivery strategy.
|
|
16.04 miles
|
Windstream: Sugar Land, TX
|
A switch and data center facility that serves as an interconnected transmission site for routing telecommunication traffic across the network.
|
|
16.49 miles
|
TRG Datacenters: Houston HOU1
|
|
|
16.57 miles
|
TRG Datacenters: HOU2
|
This facility is part of TRG Datacenters' Houston campus in Houston.
|