0.14 miles
|
FastServ Ashburn
|
|
|
0.16 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
|
0.17 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
0.18 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
0.25 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
0.26 miles
|
Sabey: Intergate.Ashburn (Building B)
|
|
|
0.32 miles
|
North TowerInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
0.37 miles
|
NTT: VA8
|
|
|
0.37 miles
|
Sabey Intergate.Ashburn (Building A)
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
0.37 miles
|
NTT: VA9
|
|
|
0.45 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
0.46 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
0.46 miles
|
NTT VA5
|
|
|
0.51 miles
|
Equinix DC13
|
|
|
0.52 miles
|
NTT VA4
|
|
|
0.56 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
0.59 miles
|
NTT Ashburn Campus
|
|
|
0.62 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
0.63 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
0.63 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
0.64 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
0.73 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
0.77 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
0.81 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
0.87 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
0.87 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
0.87 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
0.89 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
0.89 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
0.92 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
0.95 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
0.96 miles
|
Deft: DRT-IAD1
|
|
|
0.96 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
0.98 miles
|
44372 Round Table: Digital Realty
|
|
|
1.00 miles
|
Rackspace Ashburn IAD3
|
|
|
1.00 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
1.01 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
1.02 miles
|
44274 Round Table (Bldg L)
|
|
|
1.03 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
1.05 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
1.05 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
1.06 miles
|
Point BetaInterested in this information?Contact us
|
|
|
1.07 miles
|
Equinix Ashburn DC4
|
|
|
1.08 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
1.10 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
1.10 miles
|
CloudHQ Ashburn Campus
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
1.11 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
1.11 miles
|
Equinix Ashburn DC5
|
|
|
1.11 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
|
1.12 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
1.14 miles
|
44470 Chillum - Digital Realty
|
|
|
1.15 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
1.15 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
1.18 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
1.18 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
1.19 miles
|
Equinix Ashburn DC1
|
|
|
1.19 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
1.19 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
1.19 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
1.20 miles
|
Metro CenterInterested in this information?Contact us
|
|
|
1.20 miles
|
CloudHQ: LC1B
|
|
|
1.21 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
1.21 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
1.21 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
1.21 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
1.23 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
|
1.23 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
1.26 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
1.26 miles
|
Equinix Ashburn DC6
|
|
|
1.26 miles
|
Equinix Ashburn DC11
|
|
|
1.28 miles
|
Cologix: ASH1-N
|
This facility is part of Cologix ASH1 campus in Ashburn.
|
|
1.33 miles
|
Lumen Ashburn
|
|
|
1.35 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
1.38 miles
|
44751 Round Table (Bldg P)
|
|
|
1.38 miles
|
NTT VA2
|
|
|
1.39 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
1.39 miles
|
Cologix: Ashburn ASH2
|
Cologix has acquired 38 acres in Ashburn’s "Data Center Alley" for a new AI-ready interconnection hub.
|
|
1.40 miles
|
QTS Ashburn-Shellhorn DC2
|
|
|
1.43 miles
|
QTS Ashburn-Shellhorn
|
|
|
1.45 miles
|
Central CenterInterested in this information?Contact us
|
|
|
1.47 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
1.48 miles
|
StationInterested in this information?Contact us
|
|
|
1.48 miles
|
Tower TwoInterested in this information?Contact us
|
|
|
1.48 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
1.53 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
1.54 miles
|
Core HubInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
1.54 miles
|
Equinix DC21
|
|
|
1.54 miles
|
MaxInterested in this information?Contact us
|
|
|
1.55 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
1.56 miles
|
Import Plz, Ashburn
|
|
|
1.58 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
1.60 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
1.60 miles
|
West CenterInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
1.61 miles
|
Stack: NVA04C
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
1.62 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
1.63 miles
|
Station UltraInterested in this information?Contact us
|
|
|
1.64 miles
|
MaxInterested in this information?Contact us
|
|
|
1.64 miles
|
Equinix DC16
|
|
|
1.64 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
1.65 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
1.67 miles
|
Stack: NVA04B
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
1.67 miles
|
PowerHouse ABX1
|
|
|
1.69 miles
|
Center UltraInterested in this information?Contact us
|
|
|
1.69 miles
|
44351 Import Plz
|
|
|
1.69 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
1.72 miles
|
Equinix DC15
|
|
|
1.72 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
|
1.75 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
1.76 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
1.82 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
|
1.84 miles
|
West HubInterested in this information?Contact us
|
|
|
1.92 miles
|
Digital Realty: Broderick Drive
|
|
|
1.92 miles
|
Digital Realty: IAD43
|
|
|
2.05 miles
|
PowerHouse: Pacific Bldg C
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
2.06 miles
|
North RidgeInterested in this information?Contact us
|
|
|
2.07 miles
|
PowerHouse: Pacific Bldg B
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
2.07 miles
|
QTS: ASH2 DC2
|
DC2 is the second building of Ashburn's Lockridge ASH2 Campus.
|
|
2.10 miles
|
QTS Ashburn Lockridge
|
QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
|
|
2.11 miles
|
PowerHouse Pacific
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
2.12 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
2.12 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
2.14 miles
|
West CenterInterested in this information?Contact us
|
|
|
2.15 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
2.15 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
2.26 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
2.26 miles
|
21710 Charles View
|
|
|
2.28 miles
|
21641 Charles View
|
|
|
2.30 miles
|
South ValleyInterested in this information?Contact us
|
|
|
2.33 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
2.35 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
2.37 miles
|
CoreInterested in this information?Contact us
|
|
|
2.43 miles
|
CyrusOne: Broadlands Boulevard
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
2.45 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
2.46 miles
|
Vantage VA13
|
|
|
2.48 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
2.49 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
2.50 miles
|
Vantage VA15
|
In July 2025, Vantage completed the topping out of the fifth building at its data center campus in Ashburn, Loudoun County, Virginia.
|
|
2.51 miles
|
Vantage VA14
|
|
|
2.52 miles
|
CyrusOne: Broadlands Expansion
|
|
|
2.53 miles
|
Ridge GammaInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
2.53 miles
|
CampusInterested in this information?Contact us
|
|
|
2.54 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
2.55 miles
|
ParkInterested in this information?Contact us
|
|
|
2.55 miles
|
Vantage VA16
|
|
|
2.55 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
2.58 miles
|
CenterInterested in this information?Contact us
|
|
|
2.58 miles
|
Vantage VA12
|
|
|
2.60 miles
|
CyrusOne Northern Virginia Sterling V
|
|
|
2.60 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019.
|
|
2.60 miles
|
Center GammaInterested in this information?Contact us
|
|
|
2.62 miles
|
CampusInterested in this information?Contact us
|
|
|
2.63 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
2.64 miles
|
ProInterested in this information?Contact us
|
|
|
2.64 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.65 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
2.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.72 miles
|
Campus ProInterested in this information?Contact us
|
|
|
2.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.79 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
2.83 miles
|
Ridge AlphaInterested in this information?Contact us
|
|
|
2.83 miles
|
Plaza TwoInterested in this information?Contact us
|
|
|
2.85 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
2.87 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
2.88 miles
|
Park TwoInterested in this information?Contact us
|
|
|
2.93 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
2.96 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
2.96 miles
|
Center PlusInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
2.96 miles
|
Central PointInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
2.97 miles
|
PrimeInterested in this information?Contact us
|
|
|
2.99 miles
|
Metro ParkInterested in this information?Contact us
|
|
|
3.00 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
3.01 miles
|
Valley BetaInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
3.04 miles
|
UltraInterested in this information?Contact us
|
|
|
3.05 miles
|
Tower PlusInterested in this information?Contact us
|
|
|
3.06 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
3.07 miles
|
Vantage: VA22
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
3.10 miles
|
Vantage VA2 Campus
|
On 18.6 acres east of Route 28 in Sterling, Virginia, Vantage Data Centers is developing its VA2 campus.
|
|
3.11 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
3.15 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
3.16 miles
|
Vantage: VA23
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
3.20 miles
|
TowerInterested in this information?Contact us
|
|
|
3.22 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
3.25 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
3.31 miles
|
Ridge MaxInterested in this information?Contact us
|
|
|
3.32 miles
|
Point ProInterested in this information?Contact us
|
|
|
3.32 miles
|
COPT: 45771 Maries Rd
|
|
|
3.36 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
3.39 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
3.39 miles
|
COPT: 45761 Maries Rd
|
|
|
3.48 miles
|
Compass Loudoun County
|
|
|
3.51 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.59 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
3.64 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
3.64 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
3.67 miles
|
Ridge GammaInterested in this information?Contact us
|
|
|
3.68 miles
|
CyrusOne Sterling VIII
|
|
|
3.70 miles
|
Centersquare: Sterling DC2
|
|
|
3.73 miles
|
Luck Stone: Ashburn Expansion
|
|
|
3.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
The premium infill site, positioned adjacent to One Loudoun, is slated for redevelopment into a high-density, AI-ready data center campus.
|
|
3.75 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
3.75 miles
|
Luck Stone: Ashburn
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
3.78 miles
|
Centersquare: Sterling DC4
|
|
|
3.79 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
3.85 miles
|
Global CenterInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
3.86 miles
|
Campus AlphaInterested in this information?Contact us
|
|
|
3.86 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
3.87 miles
|
Centersquare: IAD2-B
|
|
|
3.89 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
3.90 miles
|
Connect Data Centers: Sterling, VA
|
|
|
3.92 miles
|
Global PointInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
3.93 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
3.93 miles
|
South StationInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
3.97 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
3.97 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
3.98 miles
|
PrimeInterested in this information?Contact us
|
|
|
4.00 miles
|
Park AlphaInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
4.01 miles
|
UltraInterested in this information?Contact us
|
|
|
4.11 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
4.13 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
4.16 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
4.18 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.19 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
4.24 miles
|
CyrusOne: NVA9 Bldg 2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
4.24 miles
|
Valley TwoInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
4.25 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.25 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.26 miles
|
Point UltraInterested in this information?Contact us
|
|
|
4.27 miles
|
CloudInterested in this information?Contact us
|
|
|
4.28 miles
|
GammaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
4.28 miles
|
CentralInterested in this information?Contact us
|
|
|
4.29 miles
|
CyrusOne: NVA9 Bldg 1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
4.30 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.32 miles
|
Tower BetaInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
4.33 miles
|
Point AlphaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
4.34 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
4.36 miles
|
Global CenterInterested in this information?Contact us
|
|
|
4.37 miles
|
Tower OneInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
4.37 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
4.39 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.39 miles
|
Ridge PrimeInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
4.39 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
4.40 miles
|
Kyndryl: Sterling
|
|
|
4.41 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.42 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.44 miles
|
North RidgeInterested in this information?Contact us
|
The campus consists of five buildings, with a total of 1.9 million-square-feet.
|
|
4.45 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.47 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
4.58 miles
|
JK Land: Greenlin Park
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
4.58 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.63 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
4.65 miles
|
Stack: Loudoun 2
|
This facility is part of Stack's Loudoun County Campus is Virginia.
|
|
4.73 miles
|
JK Land: Greenlin Expansion
|
|
|
4.78 miles
|
Stack: Loudoun County Campus
|
Stack Infrastructure is further expanding in Virginia with a new 122-acre campus in Loudoun County, near Dulles Airport.
|
|
4.89 miles
|
JK Land: Cross Mill Center
|
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
|
4.97 miles
|
Campus ProInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
4.97 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
5.07 miles
|
Active Infra: Spring Valley Tech Park
|
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
|
|
5.07 miles
|
Active Infra: Spring Valley Expansion
|
|
|
5.13 miles
|
PointInterested in this information?Contact us
|
|
|
5.16 miles
|
RidgeInterested in this information?Contact us
|
|
|
5.18 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
5.22 miles
|
PrimeInterested in this information?Contact us
|
|
|
5.25 miles
|
BetaInterested in this information?Contact us
|
|
|
5.30 miles
|
Core PointInterested in this information?Contact us
|
|
|
5.33 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
5.49 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
5.49 miles
|
Global CenterInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
5.55 miles
|
WestInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
5.58 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
5.66 miles
|
GammaInterested in this information?Contact us
|
|
|
5.79 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
5.82 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
5.83 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
5.86 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
5.87 miles
|
PowerHouse: Arcola Bldg B
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
5.89 miles
|
RidgeInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
5.91 miles
|
SouthInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
5.93 miles
|
PowerHouse Arcola
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
5.96 miles
|
Yondr Arcola, VA
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
5.97 miles
|
East ValleyInterested in this information?Contact us
|
|
|
6.04 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
6.04 miles
|
Yondr Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
6.07 miles
|
South CampusInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
6.11 miles
|
Tower UltraInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
6.17 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
6.24 miles
|
Cloud ValleyInterested in this information?Contact us
|
|
|
6.25 miles
|
RidgeInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
6.27 miles
|
Edge ParkInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
6.28 miles
|
Global StationInterested in this information?Contact us
|
|
|
6.30 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
6.31 miles
|
Metro CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
6.32 miles
|
Park PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
6.32 miles
|
Prime TowerInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
6.38 miles
|
ParkInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
6.43 miles
|
Prime ValleyInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
6.43 miles
|
West PointInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
6.43 miles
|
ParkInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
6.45 miles
|
Valley ProInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
6.47 miles
|
Lumen Herndon 1
|
|
|
6.48 miles
|
Lumen Herndon 3
|
|
|
6.49 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
6.49 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
6.52 miles
|
Prime TowerInterested in this information?Contact us
|
|
|
6.56 miles
|
Station OneInterested in this information?Contact us
|
|
|
6.57 miles
|
Campus TwoInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
6.64 miles
|
OneInterested in this information?Contact us
|
|
|
6.66 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
6.69 miles
|
Center ThreeInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
6.69 miles
|
Peterson: Leesburg Gateway Campus
|
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
|
|
6.70 miles
|
North ParkInterested in this information?Contact us
|
|
|
6.73 miles
|
Prime PointInterested in this information?Contact us
|
|
|
6.77 miles
|
CentralInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
6.81 miles
|
H5: Herndon
|
|
|
6.84 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
6.95 miles
|
Tower ThreeInterested in this information?Contact us
|
|
|
6.98 miles
|
Valley PrimeInterested in this information?Contact us
|
|
|
6.98 miles
|
Edge ParkInterested in this information?Contact us
|
|
|
7.01 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
7.02 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
7.06 miles
|
ValleyInterested in this information?Contact us
|
|
|
7.07 miles
|
Point TwoInterested in this information?Contact us
|
|
|
7.11 miles
|
GammaInterested in this information?Contact us
|
|
|
7.13 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
7.14 miles
|
Plaza TwoInterested in this information?Contact us
|
|
|
7.17 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
7.22 miles
|
SouthInterested in this information?Contact us
|
|
|
7.23 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
7.32 miles
|
Central StationInterested in this information?Contact us
|
|
|
7.48 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
7.61 miles
|
CoreSite Reston VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
7.80 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.81 miles
|
CoreSite VA2
|
|
|
7.83 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
7.83 miles
|
CoreSite Reston Campus VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
7.87 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
7.89 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
7.96 miles
|
Core PlazaInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
8.01 miles
|
PointInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
8.32 miles
|
ValleyInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
8.42 miles
|
ProInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
8.44 miles
|
AlphaInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
9.31 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
9.48 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
9.59 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
10.02 miles
|
Parkstone Tech Park
|
|
|
12.62 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
14.02 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
14.34 miles
|
Equinix Vienna DC8
|
|
|
14.82 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
14.92 miles
|
Equinix Manassas DC14
|
|
|
15.35 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
15.38 miles
|
UltraInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
15.42 miles
|
Station PrimeInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
15.47 miles
|
Cogent Vienna
|
|
|
15.52 miles
|
8100 Boone - Digital Realty
|
|
|
15.58 miles
|
GammaInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
15.70 miles
|
West PlazaInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
15.76 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
15.84 miles
|
Corscale: Gainesville Crossing
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
15.85 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
15.89 miles
|
CenterInterested in this information?Contact us
|
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
|
15.94 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
15.94 miles
|
Equinix Vienna DC7
|
|
|
15.96 miles
|
BetaInterested in this information?Contact us
|
|
|
15.99 miles
|
Element Critical VA1
|
|
|
15.99 miles
|
Lumen McLean 1
|
|
|
16.01 miles
|
Central StationInterested in this information?Contact us
|
|
|
16.02 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
16.03 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
16.04 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
16.04 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
16.08 miles
|
Hub PlusInterested in this information?Contact us
|
|
|
16.16 miles
|
Core PointInterested in this information?Contact us
|
|
|
16.38 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
16.42 miles
|
North ParkInterested in this information?Contact us
|
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
|
16.44 miles
|
Ridge OneInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
16.44 miles
|
Plaza ProInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
16.45 miles
|
Edge RidgeInterested in this information?Contact us
|
|
|
16.46 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
16.47 miles
|
Core CenterInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
16.47 miles
|
Cloud StationInterested in this information?Contact us
|
|
|
16.53 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.55 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.56 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.58 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
16.59 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
16.63 miles
|
Station PrimeInterested in this information?Contact us
|
|
|
16.64 miles
|
GammaInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
16.64 miles
|
PrimeInterested in this information?Contact us
|
|
|
16.66 miles
|
Metro PointInterested in this information?Contact us
|
|
|
16.66 miles
|
Hub MaxInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.70 miles
|
Valley ThreeInterested in this information?Contact us
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
|
16.70 miles
|
Hub UltraInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.70 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.72 miles
|
Ridge ThreeInterested in this information?Contact us
|
|
|
16.72 miles
|
PrimeInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
|
16.77 miles
|
Tower AlphaInterested in this information?Contact us
|
|
|
16.77 miles
|
NorthInterested in this information?Contact us
|
|
|
16.78 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
16.79 miles
|
Cloud HubInterested in this information?Contact us
|
|
|
16.80 miles
|
Edge HubInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
16.80 miles
|
CenterInterested in this information?Contact us
|
|
|
16.82 miles
|
WestInterested in this information?Contact us
|
|
|
16.85 miles
|
Park ProInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
|
16.88 miles
|
NorthInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
16.95 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
16.96 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
17.01 miles
|
Iron Mountain VA-2
|
|
|
17.01 miles
|
Valley ThreeInterested in this information?Contact us
|
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
|
|
17.06 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
17.09 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
17.09 miles
|
Station GammaInterested in this information?Contact us
|
|
|
17.10 miles
|
North ParkInterested in this information?Contact us
|
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
|
17.12 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
17.13 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
17.15 miles
|
Tower MaxInterested in this information?Contact us
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
|
17.20 miles
|
TowerInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
|
17.20 miles
|
Opus Interactive Manassas
|
|
|
17.23 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
17.38 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
17.56 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
17.57 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
17.59 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
17.68 miles
|
TPC: Manassas, VA
|
|
|
17.73 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
17.80 miles
|
Ridge UltraInterested in this information?Contact us
|
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
|
17.81 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
17.82 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
17.84 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
17.84 miles
|
WestInterested in this information?Contact us
|
|
|
17.92 miles
|
Campus OneInterested in this information?Contact us
|
|
|
17.99 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
18.05 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
18.12 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
18.17 miles
|
Station MaxInterested in this information?Contact us
|
|
|
18.27 miles
|
ThreeInterested in this information?Contact us
|
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
|
|
18.29 miles
|
QTS Manassas DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
18.36 miles
|
QTS: Manassas DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
18.40 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
18.41 miles
|
QTS Manassas DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
18.41 miles
|
QTS: Manassas DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
18.53 miles
|
QTS: Manassas DC4
|
|
|
18.54 miles
|
ProInterested in this information?Contact us
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
|
18.58 miles
|
QTS Manassas DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
18.70 miles
|
Tower OneInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
18.72 miles
|
EastInterested in this information?Contact us
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
|
18.76 miles
|
Tower MaxInterested in this information?Contact us
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
|
18.78 miles
|
East ValleyInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
18.83 miles
|
Tower OneInterested in this information?Contact us
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
|
18.83 miles
|
ParkInterested in this information?Contact us
|
Amazon is building another data center in it's Innovation Drive campus.
|
|
18.88 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
18.88 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
18.88 miles
|
NorthInterested in this information?Contact us
|
|
|
18.88 miles
|
Evoswitch USA WDC 1
|
|
|
18.89 miles
|
Stack: NVA02G
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
18.97 miles
|
Stack: NVA02D
|
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
|
|
19.05 miles
|
Stack: NVA02C
|
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
|
|
19.06 miles
|
Stack: NVA02E
|
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
|
|
19.10 miles
|
Hub AlphaInterested in this information?Contact us
|
|
|
19.11 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
|
19.12 miles
|
Station MaxInterested in this information?Contact us
|
|
|
19.19 miles
|
Stack: NVA02F
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
19.20 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
|
19.21 miles
|
Digital Realty: 9905 Godwin
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
19.25 miles
|
Stack: NVA02I
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
19.31 miles
|
Stack: NVA02H
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
19.40 miles
|
Digital Realty: IAD50
|
|
|
19.40 miles
|
Stack: NVA02J
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
19.44 miles
|
GlobalInterested in this information?Contact us
|
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
|
|
19.47 miles
|
Digital Realty: IAD51
|
|
|
19.54 miles
|
CloudInterested in this information?Contact us
|
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
|
|
19.56 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
19.57 miles
|
East PointInterested in this information?Contact us
|
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
|
|
19.66 miles
|
Edge TowerInterested in this information?Contact us
|
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
|
|
19.68 miles
|
Point GammaInterested in this information?Contact us
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
|
19.68 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
19.73 miles
|
Stack: Bristow Campus (NVA02K)
|
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
|
|
19.78 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
19.88 miles
|
CloudHQ: Manassas MDC Campus
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|