Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.
Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.
58 Facilities Owned
22 Markets Served
Covering a total floor space of more than 42,000 square feet spread over 4 floors, the PCCW data center was opened in 2013.
Vantage Data Centers, a provider of hyperscale data center campuses, has started of construction on a second data center on its Frankfurt II (FRA22) campus in Frankfurt, Germany.
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
The site use to be called 4degrees Montréal before being acquired by Vantage in December 2019. The Montréal centre is now connected to the Québec City centre via Videotron’s fibre optic network.
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
The facility was acquired from Etix Everywhere in 2020. Vantage announced that it had acquired full ownership of the first data center, buying out its joint venture partners Energieversorgung Offenbach (EVO) and DataCenter-Group (DCG).
Vantage has completed the first data center on its Frankfurt II campus in 2022. The four-story facility offers 350,000 sq ft (33,000 sqm) of space.
Vantage's second building FRA12 is located at its Offenbach data center campus in Frankfurt, Germany.
Located in Sagamihara, the Tokyo campus will be comprised of 300,000 square feet (28,000 square meters) and will feature three multi-story, earthquake resistant facilities.
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
The site was previously known as 4degrees Quebec.
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a 160MW mega-scale data center campus. Construction began in early 2019, with the first 32MW phase coming online in 2022.
Vantage data center plans to build the Fourth facility within its Berlin 1 campus.
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
Vantage has opened a second data center on its 25-acre Berlin I campus. The two-story facility spans across 130,000 sq ft (12,000 sqm) of space.
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
Vantage Data Centers is constructing the third facility within its Berlin 1 campus.
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
Berlin I data center campus, located in Brandenburg Park, sits on 25 acres (10 hectares) off Bundesstrasse 101.
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
Vantage started to build a new data center at 14720 Omicron Drive, San Antonio, TX. The data center, which will span 242,667 sq ft (22,545 sqm) of floorspace, will be a two-story building with a total capacity of 32MW.
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.
Vantage acquired the land in August 2023 and has not yet announced construction
Vantage operates a 68-acre campus with three large data centers.