Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

  • Operating 58 data centers in 23 markets.
  • Their largest faciilty is Vantage Phoenix.
  • The company hierarchy includes 3 subsidiaries.
  • The company has 20 sites under construction.

58 Facilities Owned

22 Markets Served

Vantage Data Centers Data Center Map

Vantage Data Centers Locations

Vantage On Lok (HKG1)

Covering a total floor space of more than 42,000 square feet spread over 4 floors, the PCCW data center was opened in 2013.

VANTAGE: FRA II Bldg 2

Vantage Data Centers, a provider of hyperscale data center campuses, has started of construction on a second data center on its Frankfurt II (FRA22) campus in Frankfurt, Germany.

Vantage Warsaw WAW1

Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.

Vantage  Montréal

The site use to be called 4degrees Montréal before being acquired by Vantage in December 2019. The Montréal centre is now connected to the Québec City centre via Videotron’s fibre optic network.

Vantage FRA1

Vantage FRA1

Located in Frankfurt

The facility was acquired from Etix Everywhere in 2020. Vantage announced that it had acquired full ownership of the first data center, buying out its joint venture partners Energieversorgung Offenbach (EVO) and DataCenter-Group (DCG).

Vantage FRA II

Vantage has completed the first data center on its Frankfurt II campus in 2022. The four-story facility offers 350,000 sq ft (33,000 sqm) of space.

Vantage: FRA1 Bldg 2

Vantage's second building FRA12 is located at its Offenbach data center campus in Frankfurt, Germany.

Vantage Tokyo (HND1)

Located in Sagamihara, the Tokyo campus will be comprised of 300,000 square feet (28,000 square meters) and will feature three multi-story, earthquake resistant facilities.

Vantage: WAW1 DC2

Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.

Vantage Phoenix

In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a 160MW mega-scale data center campus. Construction began in early 2019, with the first 32MW phase coming online in 2022.

Vantage: DUB 13

Vantage: DUB 13

Located in Dublin

Vantage is constructing a campus with three data centers outside Dublin, Ireland.

Vantage: BER1 Bldg 2

Vantage has opened a second data center on its 25-acre Berlin I campus. The two-story facility spans across 130,000 sq ft (12,000 sqm) of space.

Vantage Berlin II

Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.

Vantage: DUB 12

Vantage: DUB 12

Located in Dublin

Vantage is constructing a campus with three data centers outside Dublin, Ireland.

Vantage Berlin BER1

Berlin I data center campus, located in Brandenburg Park, sits on 25 acres (10 hectares) off Bundesstrasse 101.

Vantage: San Antonio TX11

Vantage started to build a new data center at 14720 Omicron Drive, San Antonio, TX. The data center, which will span 242,667 sq ft (22,545 sqm) of floorspace, will be a two-story building with a total capacity of 32MW.

Vantage: Berlin II Bldg 2

Located only 20 kilometers from BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus is situated on 12 acres (five hectares) and features two data centers.

Vantage Data Centers Data Center Photos


1st Building on the Campus
Posted in Vantage Quincy Campus
Source: Vantage

Rendering of Campus When Fully Built Out
Posted in Vantage Quincy Campus

The V2 facility on the SC1 Campus
Posted in Vantage Santa Clara SC1
Source: Vantage
Cooling infrastructure on the roof of the Vantage Data Centers V2 facility in Santa Clara
Cooling Infrastructure on the Roof of the V2 facility
Posted in Vantage Santa Clara SC1

Cooling infrastructure on the roof of the Vantage Data Centers V2 facility in Santa Clara

Source: Vantage Data Centers

Customer Colocation Area
Posted in Vantage Santa Clara SC1
Source: Vantage

Vantage V5 Data Center
Posted in Vantage Santa Clara SC1
The data center is expected to be completed in Spring of 2019.
Rendering of Vantage's New Campus in Santa Clara
Posted in Vantage Santa Clara SC2

The data center is expected to be completed in Spring of 2019.


Empty Lot in a Satellite Picture Taken Before Start of Construction
Posted in Vantage Santa Clara SC2
Source: Google Maps

Rendering of V6
Posted in Vantage Santa Clara SC1
Source: Vantage

Aerial View of Vantage's First Campus in Santa Clara
Posted in Vantage Santa Clara SC1

Rendering of the Planned Vantage Campus in Goodyear, AZ
Posted in Vantage Phoenix
Source: Vantage Data Centers
Photo taken in September 2018
First Ashburn Facility Under Construction
Posted in Vantage Ashburn Campus

Photo taken in September 2018

Source: Vantage Data Centers
Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus
Playing Shuffleboard in the Data Center
Posted in Vantage Santa Clara SC1

Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus

Source: Vantage

Rendering of Vantage's Berlin campus due to be complete in 2021
Posted in Vantage Berlin BER1

Rendering of the first building on the Zurich campus in Winterthur
Posted in Vantage Zurich ZRH1

Rendering of the new Vantage facility in Warsaw scheduled to be completed in 2021
Posted in Vantage Warsaw WAW1

Rendering of Vantage's first building on the Milan campus which will be delivered in 2021
Posted in Vantage Milan

Outside of Vantage's VA12 Facility
Posted in Vantage VA12

Planned 5 Building Campus
Posted in Vantage Ashburn Campus
Source: Vantage

Vantage's VA11
Posted in Vantage VA11

VA11 under construction (2019)
Posted in Vantage VA11

Vantage's 1st building in Johannesburg under construction in 2021
Posted in Vantage Johannesburg

Vantage's 1st Frankfurt facility is next to Maincubes
Posted in Vantage FRA1

Front of Cardiff facility
Posted in Vantage Cardiff CWL1

Rendering on Vantage's expansion in Cardiff
Posted in Vantage CWL13
AZ11 is the first 16-megawatt phase of a 64-MW building scheduled to open next year, with AZ12 and AZ13 being constructed to the north and west
AZ11, a two-story 144,046-sf data center with four data modules
Posted in Vantage Phoenix

AZ11 is the first 16-megawatt phase of a 64-MW building scheduled to open next year, with AZ12 and AZ13 being constructed to the north and west


Vantage Berlin 1 Campus
Posted in Vantage Berlin BER1

Rendering of Vantage Data Centers DUB1 Campus
Posted in Vantage: Dublin DUB1
Source: Vantage Data Centers

Vantage WAW11 Data Center in Warsaw
Posted in Vantage Warsaw WAW1
Source: Vantage Data Centers

Rendering of Vantage's Warsaw Data Center Campus at full buildout
Posted in Vantage: WAW1 DC2
Source: Vantage Data Centers

Company Hierarchy

Vantage Data Centers Subsidiaries (3)

Files

Name Date Added Description
0312_r5_vantage_corp_brochure_kd September 2015

Vantage Corporate Overview