Vantage Montreal III (QC6)

Latest Podcast 21525 Clark Graham Ave
Operational
Fully operational facility
Operated by:

Vantage Montreal III (QC6)

Short Code: QC6
Year Built: 2025
Lot Size: 8 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Vantage’s Montreal III (QC6) campus is located close to Dorval’s Montréal-Trudeau International Airport. Montreal III is situated on an 8-acre site, which totals one data center with 140k sqft of space.

Map and Nearby Locations

21525 Clark Graham Ave
Vantage Data Centers Sites
Nearby Facilities

Vantage Montreal III (QC6) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage Montreal III (QC6)

Distance Site About
0.77 miles Compass Montreal II
Compass's Montreal II currently supports 30MW of power, but when fully built, the site will host 50MW of total capacity and will be one of Canada’s largest wholesale data centers.
3.42 miles eStruxture MTL-4 Kirkland
The site, formerly known as Cogeco Peer 1 Kirkland, was built to Tier 3 standards, the 100,000 square foot, secure facility is designed to Uptime Institute Standards and equipped with primary and secondary power redundancy.
5.97 miles Equinix: MT2
6.00 miles Ericsson Vaudreuil
The 215,000 square foot data center was completed in December 2016. The facility has been built with N+1 redundancy across critical systems.
6.36 miles Hypertec YUL02
7.30 miles Vantage Montreal II
Montreal II is situated on a 10-acre site which totals three facilities over 320k gross square feet of space.
7.31 miles Hive DC: Montreal 1
MTL-1 features a dedicated 120kV power feed and over 7 layers of security ensuring maximum reliability and security.
7.32 miles Hypertec YUL01B
7.32 miles Vantage: QC4C
QC4C data center building is the third facility of Vantage's Montreal II campus. The building spans 94,000 gross square feet of space and came online in 2022.
7.33 miles Vantage: QC4B
QC4B data center building is a part of Vantage's Montreal II Campus. This facility was formerly known as Hypertec Saint-Laurent YUL01B before Vantage acquired Hypertec's data centers in November 2020.
7.64 miles OVH Beauharnois Quebec BHS
OVH data center was created on the former Rio Tinto Alcan aluminum plant that is adjacent to Hydro-Quebec's Beauharnois Power Plant.
8.94 miles Cologix MTL8-S (Technoparc)
9.00 miles TNW Montréal
9.30 miles Cologix MTL5
9.33 miles Cologix MTL6
9.35 miles Hyperscale Data Center Request Dataset
9.56 miles Hive DC: Montreal 2
MTL-2 is a Tier III, ISO 27001, PCI DSS, SOC 2 Type 2 and Canada Control Goods Program (CGP) certified data center.
9.58 miles Vantage Montreal
The site used to be called 4degrees Montréal before being acquired by Vantage in December 2019.
10.09 miles Equinix Montreal MT1
13.84 miles Compass Montreal I
14.35 miles Cronomagic
14.59 miles eStruxture Montréal MTL2
The facility includes more than 150,000 square feet of colocation space and is served by multiple power substations operated by Hydro Quebec, with a total planned capacity of 30MW.
15.48 miles Enovum(WhiteFiber): MTL1
In 2021, Enovum Data Centers launched the first phase of its Montreal data center in Canada.
18.13 miles Cologix MTL3
The site was previously owned by Canix
18.33 miles Beanfield Montreal (Openface)
With proximity to ample hydroelectricity, the site has 750kW of reliable power onsite, redundant N+1 power availability 208VAC or 120VAC in 15A, 20A, 30A & 60A multiples in both single or 3-phase configurations. The site was previously known at Openface Montreal before being acquired by Beanfield in February 2020.
18.39 miles Enovum(WhiteFiber): MTL2
Bit Digital, a US data center developer and cryptocurrency firm, has expanded its footprint in Montreal, Canada, with the CA$33.5 million (US$23.3m) acquisition of the MTL2 site on December 27, 2024.
18.39 miles Crypto Mining Data Center Request Dataset
Hive offers its own GPU cloud service, Buzz, which provides access to Nvidia's powerful H100s, A6000s, A5000s, A40s, and H200s.
18.39 miles Cologix MTL7
The Cologix's seventh site in the city was previously owned by Canix
18.41 miles Cologix MTL1
The site was previously owned by Canix
18.46 miles Cologix MTL11
The site was previously a "Metro Optic" site. Metro Optic acquired the I.C.E Montreal facility, but subsequently sold it to Cologix.
18.49 miles eStruxture MTL-5
18.50 miles Urbacon Montreal - 544 Inspecteur
Located in downtown Montreal only 800 metres from the city’s financial core, this 266,671 SF facility is the city's only true wholesale, purpose-built data center.
18.64 miles eStruxture Montreal MTL1
Netelligent Hosting Services originally built the site in 2013 with an initial 12,000 sqft. In 2015 the site expanded by an additional 10,000 sqft for a total of 22,000sqft. eStruxture acquired Netelligent in 2017.
19.03 miles Cologix MTL2
Located on Nun’s Island (Île des Sœurs) in Montréal, Québec, the purpose-built MTL2 colocation facility is one of seven Cologix data centres throughout Montréal, spanning approximately 100,000 SQF and including Montréal’s only carrier hotel.
19.12 miles Cologix MTL12
19.19 miles Internap Montreal

Vantage Montreal III (QC6) Data Center Photos See all

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

176
Facilities
36
Markets

News See all

Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read Vantage Refused Approval For Data Center Project Outside Frankfurt.
Vantage Refused Approval For Data Center Project Outside Frankfurt.

Vantage Refused Approval For Data Center Project Outside Frankfurt.

February 08, 2026 Vantage Data Centers

US data center firm Vantage has been denied the chance to develop a new campus outside Frankfurt, Germany. The Groß-Gerau city council this month voted against entering into contract negotiations with the company Vantage Data Centers regarding the establishment of a data center.SPD parliamentary...

Read more
Read Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power
Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

January 05, 2026 Vantage Data Centers

US data center developer Vantage Data Centers has signed a strategic partnership with US natural gas and oil services company Liberty Energy to deliver utility-scale power solutions for its North American data center portfolio. Under the terms of the agreement, Liberty Power Innovations (LPI), a...

Read more
Read Vantage Launches Final Building at Cyberjaya Data Center Campus
Vantage Launches Final Building at Cyberjaya Data Center Campus

Vantage Launches Final Building at Cyberjaya Data Center Campus

December 01, 2025 Vantage Data Centers

Vantage Data Centers this week announced that its fourth facility (KUL14) on the company’s first Cyberjaya campus in Malaysia is now operational. The 16MW data center is fully leased to a single unnamed customer.“We are thrilled to welcome our customer to KUL14 and support their expanding...

Read more
Read Vantage Finalizes $1.6bn Investment into APAC Platform
Vantage Finalizes $1.6bn Investment into APAC Platform

Vantage Finalizes $1.6bn Investment into APAC Platform

November 22, 2025 Vantage Data Centers

Vantage Data Centers has finalized a $1.6bn investment into its APAC platform using to acquire Yondr’s JHB1 campus in the southern peninsular Malaysian state of Johor. The facility sits on a 73-acre land parcel, and Vantage intends to expand the data center to deliver more than 300MW of capacity...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?