Located only 20 kilometers from our BER1 campus and 10 kilometers from the Brandenburg International Airport, the campus will be situated on 12 acres (five hectares) and will feature two data centers. Each two-story facility will offer 16MW of critical IT load with 300W/SF (3.2kW/M²) average density and 130,000 square feet (12,000 square meters) of space.
Vantage’s BER2 campus will provide N+1 redundancy across all systems. An on-campus substation and state-of-the-art electrical equipment are the foundation of maximum efficiency and reliability, ensuring customer uptime and reliability thanks to the support from our world-class in-house operations team.
- N+1 substation at 45MW on campus
- Power provided by the E.DIS, the region’s leading energy provider
- Multiple, diverse power feeds supporting the campus
- 400V electrical configuration
- All systems 100% concurrently maintainable