|
0.80 miles
|
Netrality: Kansas City 7801 Nieman
|
|
|
3.12 miles
|
Consolidated Lenexa
|
Consolidated (CCI) data center located in the Southwest Kansas City metro.
|
|
3.46 miles
|
TierPoint Kansas City-Lenexa
|
Power Density: upto 20kW per cabinet
2 Utility transformers protected inside mechanical area/yard
Dedicated utility transformer for each UPS
|
|
4.61 miles
|
DataBank South Lake KC1
|
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
|
|
4.63 miles
|
Lightedge: Lenexa (Cavern)
|
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
|
|
4.78 miles
|
DataBank Kansas City MCI3
|
The expansion of the MCI3 data center in Lenexa, Kansas is now complete and offers an additional 17,000 square feet of raised flooring.
|
|
5.78 miles
|
QTS Overland Park
|
The building also serves as QTS Headquarters
|
|
8.52 miles
|
Connect Data Centers: Olathe, KS
|
US investment firm Oppidan's Olathe data center spans 89,842 sq ft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
8.87 miles
|
DigiCo: Kansas City KCM1
|
In January 2025, DigiCo Infrastructure REIT completed the acquisition of a mission-critical enterprise data center in Olathe, Kansas, as part of a larger portfolio deal with JDM III AZ LLC.
|
|
10.60 miles
|
Contegix Mainmark
|
The site was acquired in late 2016 when Contegix acquired Admo.
|
|
10.78 miles
|
Patmos: Kansas City
|
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
|
|
10.80 miles
|
Nebius: Kansas City
|
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
|
|
10.97 miles
|
Lumen Kansas City 3
|
|
|
11.01 miles
|
Lumen Kansas City 1
|
|
|
11.05 miles
|
Contegix 1102 Grand
|
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
|
|
11.06 miles
|
Lumen Kansas City 4
|
|
|
11.06 miles
|
1102 Grand St (Netrality) Kansas City Carrier Hotel
|
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
|
|
11.16 miles
|
IP Pathways: Kansas City
|
The facility was acquired from Netsolus in 2023.
|
|
11.26 miles
|
Iron Mountain Kansas Underground
|
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
|
|
11.35 miles
|
Joe's Datacenter Kansas City
|
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
|
|
13.08 miles
|
QTS: New Century Commerce Center
|
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
|
|
13.21 miles
|
NOCIX
|
|
|
13.21 miles
|
Nocix 2 (1530 Swift)
|
|
|
14.03 miles
|
Colossus: Spring Hill, Kansas
|
In a sudden reversal, data center consultancy firm Colossus Data Center Advisors has abruptly withdrawn its proposal to build a massive 316-acre data center campus in Spring Hill, Kansas.
|
|
14.23 miles
|
Red Wolf DCD: Kansas City, KS
|
Red Wolf DCD Properties LLC intends to construct a substantial 400-acre data center campus featuring six buildings totaling 1.8 million square feet and two on-site substations.
|
|
14.24 miles
|
Red Wolf DCD: Kansas Expansion
|
|
|
14.93 miles
|
Digital Realty: Astra North C
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.00 miles
|
Digital Realty: Astra North D
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.03 miles
|
Digital Realty: Astra North E
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.04 miles
|
Digital Realty: Astra North F
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.06 miles
|
Digital Realty: Astra North G
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.07 miles
|
Digital Realty: Astra North H
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.08 miles
|
Digital Realty: Astra North I
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.11 miles
|
Beale: Gardner Campus
|
Proposed by Blue Owl-backed Beale Infrastructure, Project Brewer was a massive hyperscale data center campus slated for an approximately 300-acre site in Gardner, Kansas.
|
|
15.26 miles
|
Digital Realty: Astra North B
|
This facility is part of Digital Realty's Astra North campus in De Soto, Kansas.
|
|
15.33 miles
|
Digital Realty: Astra South Campus
|
Serving as the De Soto campus's future expansion area, Astra South offers additional land and buildable square footage to accommodate long-term hyperscale growth.
|
|
15.34 miles
|
Digital Realty: Astra North Campus
|
Digital Realty (DRT) has acquired approximately 1,440 acres of powered land at the Astra Enterprise Park in De Soto, Kansas from Sunflower Redevelopment Group for $475 million.
|
|
16.87 miles
|
Beale: De Soto 4
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
17.09 miles
|
Beale: De Soto 3
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
17.16 miles
|
Beale: De Soto 2
|
This facility is part of Beale Infrastructure's ‘Project Pilot’ in De Soto, Kansas.
|
|
17.40 miles
|
Beale: De Soto, KS
|
Dubbed ‘Project Pilot’, the data center will be built in four phases on a 290-acre site.
|
|
18.16 miles
|
Edged Energy: Kansas City, MO
|
The facility known as Edged Kansas City is located in Kansas City, Missouri.
|
|
19.06 miles
|
LightEdge Kansas City
|
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
|
|
19.14 miles
|
Point TwoInterested in this information?Contact us
|
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
|
|
19.33 miles
|
OneInterested in this information?Contact us
|
This data center is a part of Google's Kansas City Campus in Missouri.
|
|
19.41 miles
|
StationInterested in this information?Contact us
|
This data center is a part of Google's Kansas City Campus in Missouri.
|
|
19.44 miles
|
CloudInterested in this information?Contact us
|
This data center is a part of Google's Kansas City Campus in Missouri.
|
|
19.91 miles
|
Diode Ventures: Peculiar, MO
|
The proposed Harper Road Technology Park by Diode Ventures, a $1.5 billion data center project planned for 508 acres in Peculiar, Missouri, was ultimately blocked by local authorities in October 2024.
|