Cawley Partners Acquires 5,200 Acres outside Dallas for Data Center Park
June 18, 2025
Dallas
DataBank's 400 South Akard is a 7 story building built in 1921 for the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
| Distance | Site | About |
|---|---|---|
| 0.00 miles | Sprocket DAL2 | |
| 0.00 miles | Cogent: 400 S Akard | |
| 0.00 miles | Lumen Dallas 4 | |
| 0.01 miles | Opus Interactive Dallas |
In 2014, Opus Interactive expanded its data center footprint in Dallas, Texas, with additional colocation and cloud hosting infrastructure.
|
| 0.01 miles | 400 S Akard - Digital Realty |
The building is a eight story (7 stories with a basement) multi-tenant data center.
|
| 0.23 miles | Carrier-Neutral Data Center Request Dataset | |
| 0.23 miles | Aphorio Carter: Dallas |
The Dallas Data Center is a premier colocation facility located on a 7.61-acre campus in Dallas, Texas. Spanning 125,538 rentable square feet, the property is fully leased to a prominent, NYSE-listed global consumer internet company.
|
| 0.26 miles | Lumen Dallas 3 | |
| 0.44 miles | Provision Data Services |
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
|
| 0.44 miles | Sprocket DAL1 | |
| 0.57 miles | DataCanopy Dallas |
|
| 0.67 miles | Digital Realty: DFW10 |
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space.
Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
|
| 0.67 miles | Equinix Dallas DA4 |
|
| 0.67 miles | LOGIX Dallas (2323 Bryan) |
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
| 0.67 miles | Earthlink Dallas |
|
| 1.95 miles | Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy |
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
|
| 1.95 miles | Lumen Dallas 2 | |
| 1.97 miles | Flexential Dallas Infomart I-V |
|
| 1.97 miles | Cologix: Dallas DAL1 |
Cologix DAL1 & DAL2 and DAL 3 are located in the carrier dense Infomart.
|
| 1.98 miles | DataBank DFW5 |
|
| 2.00 miles | Verizon Dallas (Infomart) |
Verizon established a new Point of Presence (PoP) in the Infomart Dallas carrier-neutral Building Meet-Me Room (BMMR) in August 2017.
|
| 2.00 miles | Cologix: DAL2 |
DAL2 is a 12,000-square-foot facility located in the Infomart building at 1950 North Stemmons Freeway. Cologix opened its second site at the Dallas Infomart in 2013.
|
| 2.01 miles | Cologix: DAL3 |
DAL3 is a 13.2K SQFT facility located in the renowned Infomart building at 1950 North Stemmons Freeway.
|
| 2.08 miles | Equinix Dallas DA11 |
DA11 is Equinix's expansion next to the Infomart.
|
| 2.88 miles | CleanArc: Dallas Campus |
CleanArc Data Centers and Crow Holdings are partnering to develop a turnkey data center campus in central Dallas, Texas.
|
| 3.98 miles | Contegix Dallas | |
| 3.98 miles | QuadraNet Dallas | |
| 3.98 miles | HostPapa DFW1 |
|
| 4.00 miles | TierPoint Dallas (Colo4) |
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
| 4.52 miles | Lumen Dallas 1 | |
| 4.58 miles | Equinix: Dallas DA12 |
Equinix is expanding its Texas footprint with the development of DA12, a massive $836 million data center campus located at the former Taylor Publishing site in West Dallas.
|
| 4.88 miles | Verizon: 1300 W Mockingbird |
Former XO facility
|
| 5.11 miles | CoreSpace Dallas |
|
| 5.32 miles | DataBank DFW4 Empire Central |
The site was acquired by Zayo in January 2016 from Stream Datacenters.
|
| 5.54 miles | 8435 Stemmons - Digital Realty |
|
| 5.68 miles | DataBank DFW6 Love Field |
|
| 6.05 miles | Lumen Dallas 6 |
|
| 6.21 miles | Prime: Dallas DFW01 |
In April 2023, Prime Data Centers discreetly added Dallas to its list of data center locations. The company now has a presence at 1515 Round Table Drive in Dallas, offering 6MW of capacity across a 106,865 square foot (9,930 square meter) facility.
|
| 6.21 miles | Fiberhub DFW1 |
|
| 6.23 miles | Evocative DA4 |
This site (DA4) was sold to Evocative in 2022 by Carrier-1.
|
| 6.26 miles | Prime: DFW01-02 |
Prime Data Centers is planning to develop a three-story, 96,800 sq ft (8,995 sqm) data center at 1455 Round Table Drive in Dallas County.
|
| 7.42 miles | Edged Energy: Dallas, Tx |
In January 2025, Edged Energy launched its data center in Irving, Texas..
|
| 7.55 miles | Equinix Dallas DA9 |
Equinix acquired DA9 in Irving as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DFW1.
|
| 7.58 miles | Edged Energy: DFW01-2 |
This facility will be a part of Edged Energy's Dallas Campus in Texas.
|
| 9.08 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.
|
| 9.97 miles | H5 Colo |
|
| 10.01 miles | DataBank DFW7 LBJ |
|
| 10.14 miles | Centersquare: Dallas DFW3 |
The Centersquare Dallas portfolio consists of three data centers located in Fort Worth, Allen and Dallas providing close proximity to business hubs in downtown Dallas, Plano and Fort Worth.
|
| 10.89 miles | Digital Realty: DFW14 | |
| 11.05 miles | PowerHouse: Irving DC3 |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 11.14 miles | PowerHouse: Irving DC2 |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 11.20 miles | Hyperscale Data Center Request Dataset |
Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.
|
| 11.24 miles | PowerHouse: Irving, TX |
PowerHouse has unveiled plans to construct a data center campus in Irving, Texas. The ambitious project includes three powered shell data centers totaling over 946,000 square feet of space.
|
| 12.05 miles | Mobius: Farmers Branch |
|
| 12.72 miles | Crypto Mining Data Center Request Dataset |
In northern Texas, Project Fei is a data center project co-located with a 240 MW utility-scale solar farm.
|
| 12.83 miles | Project Labrador |
WHL Dallas 45 LLC has filed development plans for Project Labrador, a massive data center campus planned for a 419-acre site in the Lancaster area of Dallas.
|
| 13.10 miles | Yondr: Lancaster, TX |
Yondr Group is expanding its U.S. presence with a new data center campus in Lancaster, Texas.
|
| 13.10 miles | Yondr: Lancaster Expansion | |
| 13.25 miles | 900 N Dorothy |
|
| 13.26 miles | QTS: Irving DC4 |
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
|
| 13.26 miles | Verizon Dallas (Richardson) |
|
| 13.30 miles | Project Labrador Expansion | |
| 13.33 miles | QTS: Irving DC5 |
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
|
| 13.34 miles | QTS Irving DC3 |
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
|
| 13.38 miles | QTS: Irving DC6 |
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
|
| 13.50 miles | QTS Irving |
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
|
| 13.76 miles | Digital Realty: DFW25 |
Located in the epicenter of North Dallas' high-technology corridor on the 69-acre Digital Dallas campus, this facility offers over 100,000 square feet of space and connectivity to more than 60 network service providers.
|
| 13.76 miles | Rackspace Richardson DFW3 |
In 2012, US hosting company Rackspace signed a long-term lease for more than 58,000 sq ft of raised floor space at Digital Realty Trust's data center campus in Richardson, Texas (Dallas metro).
|
| 13.84 miles | Digital Realty: DFW16 |
This facility is a part of Digital Dallas Campus in Richardson.
|
| 13.85 miles | Digital Realty: DFW18 |
This facility is a part of Digital Dallas Campus in Richardson
|
| 13.85 miles | Equinix Dallas DA10 |
The site was previously was a Terremark NAP of Dallas
|
| 13.88 miles | Digital Realty: DFW35 |
This facility is a part of Digital Dallas Campus in Richardson.
|
| 13.90 miles | Digital Realty: DFW17 |
This facility is a part of Digital Dallas Campus in Richardson
|
| 13.92 miles | DataBank North Dallas DFW2 |
The facility is located in Northern Dallas in the Technology Business Corridor
|
| 13.97 miles | Digital Realty: DFW28 |
This facility is a part of Digital Dallas Campus in Richardson
|
| 13.98 miles | Digital Dallas Campus in Richardson - Digital Realty |
|
| 14.02 miles | Digital Realty: DFW29 |
This facility is a part of Digital Dallas Campus in Richardson.
|
| 14.03 miles | 365 Richardson, TX |
|
| 14.06 miles | Project Orange |
WHL Dallas 45 LLC has filed development plans for Project Orange, a massive data center campus planned in the Lancaster area of Dallas.
|
| 14.07 miles | Project Orange Expansion | |
| 14.07 miles | Stack: DFW02D |
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
| 14.07 miles | Stack: DFW02 Campus |
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
| 14.12 miles | Stream: Dallas DFWC1 |
Stream Data Centers is currently developing its second hyperscale campus in Wilmer, Texas, situated in South Dallas County.
|
| 14.14 miles | AT&T Switching Station (Richardson) |
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
|
| 14.17 miles | Stack: DFW02E |
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
| 14.19 miles | Stream: DFWC Expansion | |
| 14.20 miles | Stack: DFW02B |
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
| 14.26 miles | Stack: DFW02F |
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
| 14.30 miles | Digital Realty: DFW12 |
The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
|
| 14.31 miles | VAZATA Horizon Dallas (DAL II) |
VAZATA’s Dallas Data Center DAB (Dal II) Features 12,500 of move-in-ready Tier III (with Tier IV attributes) data center space.
|
| 14.32 miles | Stack: DFW02C |
This Facility will be part of Stack's DFW02 Campus in Lancaster, Texas.
|
| 14.47 miles | QTS: DFW2-DC1 |
QTS is building a new data center campus outside Dallas, Texas. The company aims to develop a two-story, 413,725 sq ft (38,436 sqm) building in the Lancaster area of Dallas County.
|
| 14.51 miles | QTS: DFW2-DC2 |
The Texas Department of Licensing and Regulation (TDLR) received two applications from QTS for data center developments in Wilmer, Dallas County.
|
| 14.58 miles | Centersquare: Fort Worth DFW1 |
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
|
| 14.58 miles | Skybox: PowerCampus Dallas |
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
|
| 14.62 miles | QTS: DFW2-DC3 |
QTS is expanding its DFW2 data center campus through the construction of two additional buildings in Wilmer, Dallas County.
|
| 14.75 miles | Stream: Dallas DFWB |
Stream Data Centers is building a 690,000 sq. ft. hyperscale campus on 77 acres in Wilmer. The first 135,000 square-foot (12,540 sq. m.) phase of the project is located near I-45 and East Belt Line Road in Wilmer.
|
| 14.94 miles | Prime: Garland, TX |
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
| 14.96 miles | Prime: DFW02-02 |
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
| 15.05 miles | Prime: DFW02-03 |
Prime Data Centers is building more than $1.3 billion campus in Garland. The project includes three, two-story structures being built along Arapaho Road between Garland Avenue and Holford Road.
|
| 15.18 miles | Flexential Dallas (Synergy Park) |
|
| 15.37 miles | DigiCo: Dallas DAL1 |
In January 2025, the newly established DigiCo Infrastructure REIT acquired State Farm’s Richardson data center from JDM III AZ LLC. The 129,170 sq ft facility, which was originally built by the insurance provider in 2015.
|
| 15.44 miles | CyrusOne: Dallas DFW6 |
CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.
|
| 15.99 miles | Digital Realty: DFW37 |
Digital Realty has filed to expand its planned data center campus in the Garland area of Dallas, Texas. The company is planning to construct a 410,000 sq ft (38090 sqm) data center building comprised of a tenant office and six data halls.
|
| 16.01 miles | Digital Realty: 1505 Ferris |
DRT's 181,200 square foot (16,800 sqm) core & shell data center is located on Ferris Road in Garland, TX.
|
| 16.08 miles | Compass: Red Oak V |
Compass Roadrunner Bldg 5 is located at its Red Oak campus. Building 5 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
| 16.09 miles | NTT: TX4 |
NTT is expanding in Garland, adding another building to its existing campus. The project will consist of a new 235,910 sq ft (21,915 sqm) data center.
|
| 16.10 miles | Compass: Red Oak VIII | |
| 16.11 miles | Compass: Red Oak IX | |
| 16.17 miles | NTT: TX3 |
NTT TX3 is the third building of NTT's Garland campus. The datacenter building is approximately 229,500 square feet in size consisting of additional office space and adding equipment to data vaults.
|
| 16.18 miles | Compass: Red Oak IV |
Compass Roadrunner Bldg 4 is located at its Red Oak campus. Building 4 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
| 16.19 miles | Compass: Red Oak VII | |
| 16.20 miles | Compass: Red Oak X | |
| 16.20 miles | NTT TX2 |
NTT TX2 is the second building of NTT's Garland campus. The datacenter building is 229,500 square feet in size with two-story office and loading dock located on the ground floor.
|
| 16.21 miles | Digital Garland |
|
| 16.21 miles | NTT 2300 W Plano |
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
|
| 16.26 miles | Compass: Red Oak III |
Compass Roadrunner Bldg 3 is located at its Red Oak campus. Building 3 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
| 16.27 miles | NTT Dallas TX1 |
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
|
| 16.29 miles | Compass: Red Oak VI |
This Facility is part of Compass' Red Oak data center campus in Texas.
|
| 16.35 miles | Compass: Red Oak II |
Compass Roadrunner Bldg 2 is located at its Red Oak campus. Building 2 at 481 Austin Boulevard spans a 251,815 sq ft (23,395 sqm) data center space.
|
| 16.44 miles | Compass: Red Oak I |
Compass Roadrunner Building 1, also known as DFW III-II Building 1, is located at its Red Oak campus. The facility at 300 Houston School Road spans a 251,815 sq ft (23,395 sqm) data center space.
|
| 16.45 miles | Stream: DFWA-1 |
In January 2020, Stream commissioned phase I of a greenfield hyperscale data center development on a 23-acre site in Garland, next to northeast Dallas, Texas.
|
| 16.47 miles | Hyperscale Data Center Request Dataset |
The Red Oak data center is located on 166 acres in the northwest quadrant of Farm-to-Market 664 and State Highway 342, which is across Ovilla Road (FM 664) from Triumph Aerospace Structures.
|
| 16.48 miles | Hyperscale Data Center Request Dataset |
CoreWeave launched a new $1.6 billion data center in Plano, Texas, which became operational at the end of 2023.
|
| 16.49 miles | Stream: DFW V |
In 2015, Texas-based Stream Data Centers sold a 73,320 sqft data center to a local financial services company and was then immediately hired to run it.
|
| 16.50 miles | Lincoln Rackhouse: 1000 Coit |
|
| 16.50 miles | Mapletree: 1221 Coit |
|
| 16.50 miles | Evocative: Dallas DAL6 |
Evocative acquired the DAL6 data center in Dallas, Texas in 2022. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 16.56 miles | EdgeCore Dallas | |
| 16.56 miles | Compass Red Oak Campus |
Located in south of the Metro, Compass’ second metro campus can expand to more than 155 acres and 262 MW of power.
|
| 16.63 miles | CyrusOne Carrollton |
60,000 SqFt of Office Space
Power Density: 150–200+ watts/SqFt
|
| 16.71 miles | DataCanopy: Carrollton, TX |
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
|
| 16.76 miles | DataBank: DFW16 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 16.81 miles | Cisco Richardson TXDC1 |
|
| 16.86 miles | DataBank: DFW15 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 16.90 miles | DataBank: DFW12 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 16.93 miles | DataBank: DFW14 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 16.94 miles | Ascent Dallas DAL1 |
|
| 17.00 miles | DataBank: DFW13 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 17.02 miles | DataBank: DFW11 |
This facility will be a part of DataBank's upcoming Red Oak campus in Dallas, Texas.
|
| 17.03 miles | VAZATA Dallas (DAL I & III) |
The VAZATA site was previously known as: Horizon Dallas (DAL I)
|
| 17.03 miles | Digital Realty: DFW11 |
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
|
| 17.08 miles | DataBank: DFW10 |
DataBank is building a second data center at its upcoming Red Oak campus in Dallas, Texas.
|
| 17.19 miles | Databank: Red Oak DFW9 |
DataBank is planning a $256 million data center project in Red Oak, Ellis County, Texas. The facility, named DFW9, will be located on Stainback Road and cover over 425,000 sq ft (40,000 sqm).
|
| 17.27 miles | Stream DFW IV |
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
| 17.27 miles | Mapletree: 3300 Essex |
In 2010, Stream Data Centers purchased a 20,000 SF warehouse in Richardson and began development of a 10,000 SF data hall.
|
| 17.47 miles | Aligned Plano |
Aligned's DFW-01 data center is located on a 19-acre campus at 2800 Summit Avenue in Plano. The facility offers 375000 gross square feet of space and 60 megawatts of power.
|
| 17.47 miles | Evocative: DAL1 |
|
| 17.50 miles | Aligned: DFW-02 |
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
|
| 17.51 miles | Global IP Networks - Plano |
|
| 17.70 miles | Flexential Dallas (Plano) |
Flexential's Plano site in Dallas is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
| 18.01 miles | Cawley Partners: South Creek Ranch |
The initial plans for this expansive property designate 2,000 acres in the northern section specifically for digital commerce parks, which will include data centers.
|
| 19.18 miles | CyrusOne: Lewisville DFW2 |
Two independent power grids
Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
|
| 19.22 miles | Digital Realty: DFW26 |
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
|
| 19.46 miles | Lightedge: Dallas (Lewisville) |
LightEdge leases space from CyrusOne Lewisville DFW2.
|
| 19.57 miles | Digital Realty: Project Gold Lewisville |
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
|
| 19.80 miles | STACK Dallas-Fort Worth DFW01 |
There are three data centers on the campus:
#1 is a 317,800 sqft data center with 21 MW of critical power
#2 up to 11 MW
#3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.
|
| 19.82 miles | Equinix Dallas DA7 |
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
|
| 19.93 miles | STACK DFW01B |
STACK’s DFW01B data center boasts a substantial footprint of 156000 square feet area. This facility offers up to 11MW of critical capacity, with 2.2MW immediately available.
|
| 19.97 miles | Stack: DFW01 Future Expansion |
STACK Infrastructure's DFW01 Future Expansion offers a build-to-suit expansion opportunity with 50MW of accessible power, adjacent to DFW01A and DFW01B data centers.
|
DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.
Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.
June 18, 2025
Dallas
November 29, 2023
DataBank
November 16, 2023
DataBank
November 01, 2023
DataBank
September 22, 2023
DataBank
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas