Power Cost: 4.9 cents per kWh

The Switch Tahoe Reno site is also known as the Citadel Campus. The facility is located in the same industrial park as Tesla Motors' Gigafactory

Power

4.9¢ per kWh, 100% green power
100% power uptime guarantee
Up to 55kW per cabinet

Taxes

2% sales and use tax in Nevada
75% reduction in personal property tax in Nevada
No personal state income tax in Nevada
U.S. approved ‘Qualified Opportunity Zone’

Solar Power

Switch Station 1 and Switch Station 2 power plants commissioned in December 2017 at the Apex Industrial Park are designed to generate 179 megawatts, enough electricity to meet the needs of 46,000 homes. The solar plants serve Switch facilities in Reno and Las Vegas.

Tahoe Reno 1

Tahoe Reno 1, the first building on the campus, is 1.3 million square feet and can support up to 130 MW of power. Switch’s design for the 2,000 acre campus calls for up to 7.2 million square feet and 650 MW of power total