0.07 miles
|
Lumen McLean 1
|
|
|
0.79 miles
|
8100 Boone - Digital Realty
|
|
|
0.85 miles
|
Element Critical VA1
|
|
|
0.86 miles
|
Equinix Vienna DC7
|
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
|
|
0.89 miles
|
Cogent Vienna
|
|
|
1.61 miles
|
Equinix Vienna DC8
|
|
|
6.44 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
6.55 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
6.73 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
8.24 miles
|
Verizon: 4301 Connecticut
|
|
|
8.40 miles
|
CoreSite: VA2
|
|
|
8.41 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
8.41 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
8.74 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
8.88 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
|
9.23 miles
|
Lumen DC4
|
|
|
9.28 miles
|
H5: Herndon
|
|
|
9.29 miles
|
Equinix Herndon DC97
|
|
|
9.34 miles
|
Cogent: 1050 Connecticut
|
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
|
|
9.41 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
9.45 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
9.58 miles
|
Lumen Herndon 3
|
|
|
9.59 miles
|
Lumen Herndon 1
|
|
|
9.75 miles
|
Verizon: 1120 Vermont
|
Former XO Communications site
|
|
9.76 miles
|
Lumen DC 1
|
|
|
9.76 miles
|
Cogent: 1120 Vermont
|
|
|
9.82 miles
|
CoreSite DC2
|
|
|
9.97 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
|
9.97 miles
|
Verizon: 1220 L
|
|
|
9.97 miles
|
Lumen DC2
|
|
|
10.14 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
11.35 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
11.37 miles
|
Cloud TowerInterested in this information?Contact us
|
|
|
11.38 miles
|
Plaza AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.41 miles
|
Park BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.46 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
11.47 miles
|
East PointInterested in this information?Contact us
|
|
|
11.47 miles
|
BetaInterested in this information?Contact us
|
|
|
11.48 miles
|
ThreeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.52 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
11.52 miles
|
Hub MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.53 miles
|
OneInterested in this information?Contact us
|
|
|
11.56 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.63 miles
|
Valley PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.67 miles
|
Edge TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
11.72 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
11.76 miles
|
TowerInterested in this information?Contact us
|
|
|
11.77 miles
|
Hub UltraInterested in this information?Contact us
|
|
|
11.80 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
11.84 miles
|
Park OneInterested in this information?Contact us
|
|
|
11.95 miles
|
TAC: Northern Virginia
|
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
|
|
12.04 miles
|
Connect Data Centers: Sterling, VA
|
|
|
12.12 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
12.14 miles
|
Global TowerInterested in this information?Contact us
|
|
|
12.16 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
12.16 miles
|
West HubInterested in this information?Contact us
|
|
|
12.19 miles
|
Centersquare: IAD2-B
|
|
|
12.26 miles
|
Edge PointInterested in this information?Contact us
|
|
|
12.26 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
12.27 miles
|
Kyndryl: Sterling
|
|
|
12.34 miles
|
Cloud ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.66 miles
|
Cloud PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.68 miles
|
Hub AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.78 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
12.79 miles
|
North TowerInterested in this information?Contact us
|
|
|
12.81 miles
|
Core PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.83 miles
|
Station UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.83 miles
|
CyrusOne Sterling VIII
|
|
|
12.84 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
12.84 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
12.87 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
12.88 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
12.88 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
12.89 miles
|
Centersquare: Sterling DC4
|
|
|
12.90 miles
|
Centersquare: Sterling DC2
|
|
|
12.91 miles
|
NorthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.93 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
12.94 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
12.97 miles
|
MetroInterested in this information?Contact us
|
|
|
12.98 miles
|
Park AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.00 miles
|
GlobalInterested in this information?Contact us
|
|
|
13.00 miles
|
Plaza TwoInterested in this information?Contact us
|
|
|
13.01 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
13.02 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
13.02 miles
|
CoreInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.03 miles
|
AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.05 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.06 miles
|
Prime TowerInterested in this information?Contact us
|
|
|
13.06 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
13.07 miles
|
North TowerInterested in this information?Contact us
|
|
|
13.08 miles
|
Park TwoInterested in this information?Contact us
|
|
|
13.09 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.12 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
13.12 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
13.12 miles
|
Campus ProInterested in this information?Contact us
|
|
|
13.16 miles
|
TowerInterested in this information?Contact us
|
|
|
13.18 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
13.18 miles
|
COPT: 45761 Maries Rd
|
|
|
13.22 miles
|
West ParkInterested in this information?Contact us
|
|
|
13.24 miles
|
TowerInterested in this information?Contact us
|
|
|
13.26 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
13.26 miles
|
Station ProInterested in this information?Contact us
|
|
|
13.27 miles
|
COPT: 45771 Maries Rd
|
|
|
13.34 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
13.36 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
13.39 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
13.40 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
13.43 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
13.45 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
13.47 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
13.47 miles
|
Center TwoInterested in this information?Contact us
|
|
|
13.48 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
13.48 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
13.50 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
13.52 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.52 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
13.54 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
13.55 miles
|
CenterInterested in this information?Contact us
|
|
|
13.55 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
13.58 miles
|
North CampusInterested in this information?Contact us
|
|
|
13.58 miles
|
Cloud CampusInterested in this information?Contact us
|
|
|
13.61 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
13.61 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
13.62 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
13.63 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
13.69 miles
|
North CenterInterested in this information?Contact us
|
|
|
13.73 miles
|
Cloud ValleyInterested in this information?Contact us
|
|
|
13.75 miles
|
Center BetaInterested in this information?Contact us
|
|
|
13.76 miles
|
UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.77 miles
|
Edge HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.81 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
13.82 miles
|
PowerHouse: Pacific Bldg B
|
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
13.82 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
13.82 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
13.83 miles
|
PowerHouse: Pacific Bldg A
|
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
|
|
13.85 miles
|
Parkstone Tech Park
|
|
|
13.86 miles
|
21710 Charles View
|
|
|
13.86 miles
|
CampusInterested in this information?Contact us
|
|
|
13.88 miles
|
Prime ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
13.89 miles
|
CyrusOne: NVA5
|
|
|
13.90 miles
|
PowerHouse: Pacific Bldg C
|
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
|
|
13.91 miles
|
Global PlazaInterested in this information?Contact us
|
|
|
13.93 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
13.93 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
13.94 miles
|
21641 Charles View
|
|
|
13.96 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
13.98 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
13.98 miles
|
GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.02 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
14.02 miles
|
Digital Realty: Broderick Drive
|
|
|
14.04 miles
|
GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.05 miles
|
Digital Realty: IAD43
|
|
|
14.08 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
14.21 miles
|
SDC: Low Latency Lane Expansion
|
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
|
|
14.24 miles
|
GammaInterested in this information?Contact us
|
|
|
14.25 miles
|
SDC: Low Latency Lane 1
|
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
14.25 miles
|
CoreInterested in this information?Contact us
|
|
|
14.34 miles
|
SDC: Low Latency Lane 2
|
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
|
|
14.36 miles
|
Point BetaInterested in this information?Contact us
|
|
|
14.36 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
14.38 miles
|
Stack: NVA04A
|
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
|
|
14.38 miles
|
South ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.39 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
14.41 miles
|
Stack: NVA04B
|
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
|
|
14.41 miles
|
OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.42 miles
|
Equinix DC21
|
|
|
14.43 miles
|
Hub TwoInterested in this information?Contact us
|
|
|
14.45 miles
|
Ridge ProInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.45 miles
|
Stack: NVA04C
|
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
|
|
14.47 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
14.47 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
14.47 miles
|
South PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.49 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
14.49 miles
|
PowerHouse ABX1
|
|
|
14.50 miles
|
North RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.53 miles
|
South CampusInterested in this information?Contact us
|
|
|
14.53 miles
|
Park AlphaInterested in this information?Contact us
|
|
|
14.54 miles
|
Park GammaInterested in this information?Contact us
|
|
|
14.56 miles
|
44751 Round Table (Bldg P)
|
|
|
14.57 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
14.57 miles
|
Equinix DC15
|
|
|
14.58 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
14.60 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
14.62 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
14.65 miles
|
Core ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.67 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
14.67 miles
|
Global PlazaInterested in this information?Contact us
|
|
|
14.70 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
14.71 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
14.72 miles
|
Metro PlazaInterested in this information?Contact us
|
|
|
14.73 miles
|
Equinix DC16
|
|
|
14.73 miles
|
Equinix Ashburn DC6
|
|
|
14.73 miles
|
Equinix Ashburn DC11
|
|
|
14.74 miles
|
CloudHQ: LC1B
|
|
|
14.76 miles
|
SDC: Import Plaza D
|
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
|
|
14.76 miles
|
Hub UltraInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.78 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
14.79 miles
|
SDC: Import Plaza C
|
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
|
|
14.79 miles
|
Edge HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.80 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
14.80 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
14.80 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
14.80 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
14.81 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
14.81 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
14.82 miles
|
Equinix Ashburn DC1
|
|
|
14.82 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
14.82 miles
|
PointInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.82 miles
|
SDC: Import Plaza B
|
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
|
|
14.83 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
14.84 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
14.87 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
14.88 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
14.89 miles
|
Equinix Ashburn DC5
|
|
|
14.91 miles
|
TowerInterested in this information?Contact us
|
|
|
14.91 miles
|
Lumen Ashburn
|
|
|
14.93 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
14.94 miles
|
Equinix Ashburn DC4
|
|
|
14.94 miles
|
North RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.94 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
14.95 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
14.97 miles
|
44274 Round Table (Bldg L)
|
|
|
14.97 miles
|
SDC: Import Plaza A
|
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
|
|
14.97 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
14.99 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
15.00 miles
|
NTT VA2
|
|
|
15.00 miles
|
HubInterested in this information?Contact us
|
|
|
15.01 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
15.02 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
15.04 miles
|
44372 Round Table: Digital Realty
|
|
|
15.04 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
15.05 miles
|
PrimeInterested in this information?Contact us
|
|
|
15.06 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
15.06 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
15.06 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
15.07 miles
|
44470 Chillum - Digital Realty
|
|
|
15.07 miles
|
Core CampusInterested in this information?Contact us
|
|
|
15.08 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
15.09 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
15.09 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
15.10 miles
|
Point GammaInterested in this information?Contact us
|
|
|
15.11 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
15.11 miles
|
Metro ValleyInterested in this information?Contact us
|
|
|
15.15 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
15.15 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
15.16 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
15.16 miles
|
Rackspace Ashburn IAD3
|
|
|
15.16 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
15.17 miles
|
EdgeInterested in this information?Contact us
|
|
|
15.22 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
15.23 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
15.24 miles
|
Park ThreeInterested in this information?Contact us
|
|
|
15.26 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
15.27 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
15.30 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
15.34 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
15.35 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
15.37 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
15.39 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
15.39 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
15.40 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
15.40 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
15.41 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
15.41 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
15.46 miles
|
RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.46 miles
|
Equinix DC13
|
|
|
15.47 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
15.47 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
15.48 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
15.50 miles
|
Center GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.51 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
15.53 miles
|
North TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.53 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
15.54 miles
|
NTT VA5
|
|
|
15.56 miles
|
NTT VA4
|
|
|
15.59 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
15.59 miles
|
NTT: VA9
|
|
|
15.60 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.60 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
15.60 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
15.64 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.67 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.68 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.69 miles
|
Deft: DRT-IAD1
|
|
|
15.69 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
15.70 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
15.70 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
15.70 miles
|
NTT: VA8
|
|
|
15.73 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.75 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
15.77 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
15.77 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
15.80 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
15.81 miles
|
Global HubInterested in this information?Contact us
|
|
|
15.86 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
15.87 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
15.87 miles
|
FastServ Ashburn
|
|
|
15.92 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
15.92 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
15.94 miles
|
DataBank Ashburn IAD3
|
|
|
15.95 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
15.97 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
16.22 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
16.43 miles
|
Sansone: Silver Spring, MD
|
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
|
|
16.46 miles
|
DataBridge: Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
|
16.61 miles
|
Ridge GammaInterested in this information?Contact us
|
|
|
16.63 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
16.74 miles
|
Metro TowerInterested in this information?Contact us
|
|
|
16.77 miles
|
Station PlusInterested in this information?Contact us
|
|
|
16.80 miles
|
EastInterested in this information?Contact us
|
|
|
16.99 miles
|
Core TowerInterested in this information?Contact us
|
|
|
17.02 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
17.18 miles
|
PrimeInterested in this information?Contact us
|
|
|
17.20 miles
|
West TowerInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.27 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
17.30 miles
|
Center TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.39 miles
|
PowerHouse: Arcola Bldg B
|
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
17.45 miles
|
PowerHouse: Arcola Bldg A
|
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
|
|
17.50 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
17.69 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
17.85 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
17.88 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
17.92 miles
|
Equinix Manassas DC14
|
|
|
17.94 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
17.98 miles
|
AiNET Beltsville WDC-1
|
|
|
18.04 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
18.07 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
18.09 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
18.17 miles
|
Central ValleyInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.20 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
18.21 miles
|
PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.22 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
18.35 miles
|
TowerInterested in this information?Contact us
|
|
|
18.37 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
18.46 miles
|
South PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.46 miles
|
CyrusOne: Broadlands Expansion
|
|
|
18.52 miles
|
Valley OneInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.53 miles
|
Tower AlphaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.67 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.69 miles
|
South ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.70 miles
|
PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.77 miles
|
Global ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.77 miles
|
Core CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.83 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
18.85 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
19.06 miles
|
PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.10 miles
|
Park GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.11 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.11 miles
|
Cloud PlazaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.13 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.13 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.14 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
19.17 miles
|
Lerner: Landover Expansion
|
|
|
19.18 miles
|
Global HubInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.18 miles
|
BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.23 miles
|
Lerner: Landover, MD
|
|
|
19.24 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
19.25 miles
|
Ridge PlusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.25 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.26 miles
|
Plaza GammaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.35 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.36 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
19.40 miles
|
Compass Loudoun County
|
|
|
19.41 miles
|
SouthInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.43 miles
|
TPC: Manassas, VA
|
|
|
19.45 miles
|
Black Chamber: Nokesville
|
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
|
|
19.47 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
19.47 miles
|
Metro RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.52 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
19.54 miles
|
Luck Stone: Ashburn Expansion
|
|
|
19.56 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
19.59 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
19.61 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
19.61 miles
|
Core PlazaInterested in this information?Contact us
|
|
|
19.66 miles
|
South CampusInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.70 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
19.71 miles
|
Global ParkInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.72 miles
|
QTS: Manassas 1 DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.72 miles
|
Hub PlusInterested in this information?Contact us
|
|
|
19.72 miles
|
StationInterested in this information?Contact us
|
|
|
19.74 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
19.75 miles
|
Center PlusInterested in this information?Contact us
|
|
|
19.79 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
19.81 miles
|
Stack: NVA05A
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
19.81 miles
|
QTS: Manassas 1 DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.81 miles
|
North RidgeInterested in this information?Contact us
|
|
|
19.84 miles
|
QTS: Manassas 1 DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
19.86 miles
|
Tower AlphaInterested in this information?Contact us
|
|
|
19.87 miles
|
Active Infra: Spring Valley 1
|
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
|
|
19.92 miles
|
QTS Manassas 1 DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
19.95 miles
|
QTS Manassas 1 DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
19.96 miles
|
Digital Realty: IAD53
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|