DataBank McLean IAD2

Latest Podcast 1764A Old Meadow Road
Operational
Fully operational facility
Operated by:

DataBank McLean IAD2

Year Built: 2019
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History

  • In 2020, DataBank acquired the site from zColo.
  • Zayo's acquired the McLean site in April 218. It was previously owned by PAETEC and Windstream.

Map and Nearby Locations

1764A Old Meadow Road
DataBank Sites
Nearby Facilities

DataBank McLean IAD2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DataBank McLean IAD2

Distance Site About
0.07 miles Lumen McLean 1
0.79 miles 8100 Boone - Digital Realty
0.85 miles Element Critical VA1
0.86 miles Equinix Vienna DC7
Former Switch and Data facility in Vienna, Virginia that Equinix acquired in 2010. Equinix closed DC7 in Q2 2026.
0.89 miles Cogent Vienna
1.61 miles Equinix Vienna DC8
6.44 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
6.55 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
6.73 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
8.24 miles Verizon: 4301 Connecticut
8.40 miles CoreSite: VA2
8.41 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
8.41 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
8.74 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
8.88 miles Starwood: Alexandria, VA
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
9.23 miles Lumen DC4
9.28 miles H5: Herndon
9.29 miles Equinix Herndon DC97
9.34 miles Cogent: 1050 Connecticut
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
9.41 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
9.45 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
9.58 miles Lumen Herndon 3
9.59 miles Lumen Herndon 1
9.75 miles Verizon: 1120 Vermont
Former XO Communications site
9.76 miles Lumen DC 1
9.76 miles Cogent: 1120 Vermont
9.82 miles CoreSite DC2
9.97 miles CoreSite DC1 - 1275 K Street NW
1275 K Street is Washington DC's Network Hotel
9.97 miles Verizon: 1220 L
9.97 miles Lumen DC2
10.14 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
11.35 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
11.37 miles Cloud TowerInterested in this information?Contact us
11.38 miles Plaza AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.41 miles Park BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.46 miles Valley AlphaInterested in this information?Contact us
11.47 miles East PointInterested in this information?Contact us
11.47 miles BetaInterested in this information?Contact us
11.48 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.52 miles Tower GammaInterested in this information?Contact us
11.52 miles Hub MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.53 miles OneInterested in this information?Contact us
11.56 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.63 miles Valley PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.67 miles Edge TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.72 miles Cloud ParkInterested in this information?Contact us
11.76 miles TowerInterested in this information?Contact us
11.77 miles Hub UltraInterested in this information?Contact us
11.80 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
11.84 miles Park OneInterested in this information?Contact us
11.95 miles TAC: Northern Virginia
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
12.04 miles Connect Data Centers: Sterling, VA
12.12 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
12.14 miles Global TowerInterested in this information?Contact us
12.16 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
12.16 miles West HubInterested in this information?Contact us
12.19 miles Centersquare: IAD2-B
12.26 miles Edge PointInterested in this information?Contact us
12.26 miles CyrusOne Northern Virginia Sterling IV
12.27 miles Kyndryl: Sterling
12.34 miles Cloud ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.66 miles Cloud PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.68 miles Hub AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.78 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
12.79 miles North TowerInterested in this information?Contact us
12.81 miles Core PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles Station UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.83 miles CyrusOne Sterling VIII
12.84 miles Center ThreeInterested in this information?Contact us
12.84 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
12.87 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
12.88 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
12.88 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
12.89 miles Centersquare: Sterling DC4
12.90 miles Centersquare: Sterling DC2
12.91 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.93 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
12.94 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
12.97 miles MetroInterested in this information?Contact us
12.98 miles Park AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.00 miles GlobalInterested in this information?Contact us
13.00 miles Plaza TwoInterested in this information?Contact us
13.01 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
13.02 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
13.02 miles CoreInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.03 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.05 miles Hyperscale Data CenterInterested in this information?Contact us
13.06 miles Prime TowerInterested in this information?Contact us
13.06 miles CyrusOne Northern Virginia Sterling I, II, III
13.07 miles North TowerInterested in this information?Contact us
13.08 miles Park TwoInterested in this information?Contact us
13.09 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.12 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
13.12 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
13.12 miles Campus ProInterested in this information?Contact us
13.16 miles TowerInterested in this information?Contact us
13.18 miles Hub GammaInterested in this information?Contact us
13.18 miles COPT: 45761 Maries Rd
13.22 miles West ParkInterested in this information?Contact us
13.24 miles TowerInterested in this information?Contact us
13.26 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
13.26 miles Station ProInterested in this information?Contact us
13.27 miles COPT: 45771 Maries Rd
13.34 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
13.36 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
13.39 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
13.40 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
13.43 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
13.45 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
13.47 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
13.47 miles Center TwoInterested in this information?Contact us
13.48 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
13.48 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
13.50 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
13.52 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.52 miles PointOne: Ashburn
The campus will have 2 buildings
13.54 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
13.55 miles CenterInterested in this information?Contact us
13.55 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
13.58 miles North CampusInterested in this information?Contact us
13.58 miles Cloud CampusInterested in this information?Contact us
13.61 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
13.61 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
13.62 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
13.63 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
13.69 miles North CenterInterested in this information?Contact us
13.73 miles Cloud ValleyInterested in this information?Contact us
13.75 miles Center BetaInterested in this information?Contact us
13.76 miles UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.77 miles Edge HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.81 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
13.82 miles PowerHouse: Pacific Bldg B
PowerHouse Pacific Building B is a three-story, 354,000 sq ft hyperscale data center shell under construction at 22214 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
13.82 miles Hub GammaInterested in this information?Contact us
13.82 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
13.83 miles PowerHouse: Pacific Bldg A
PowerHouse Pacific Building A is a three-story, 352,000 sq ft hyperscale data center shell at 22190 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia. Construction began in 2025.
13.85 miles Parkstone Tech Park
13.86 miles 21710 Charles View
13.86 miles CampusInterested in this information?Contact us
13.88 miles Prime ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.89 miles CyrusOne: NVA5
13.90 miles PowerHouse: Pacific Bldg C
PowerHouse Pacific Building C is a three-story, 352,000 sq ft hyperscale data center shell under construction at 22279 Power Player Lane on the PowerHouse Pacific campus in Sterling, Virginia.
13.91 miles Global PlazaInterested in this information?Contact us
13.93 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
13.93 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
13.94 miles 21641 Charles View
13.96 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
13.98 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
13.98 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.02 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
14.02 miles Digital Realty: Broderick Drive
14.04 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.05 miles Digital Realty: IAD43
14.08 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
14.21 miles SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.
14.24 miles GammaInterested in this information?Contact us
14.25 miles SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
14.25 miles CoreInterested in this information?Contact us
14.34 miles SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
14.36 miles Point BetaInterested in this information?Contact us
14.36 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
14.38 miles Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
14.38 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.39 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
14.41 miles Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
14.41 miles OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.42 miles Equinix DC21
14.43 miles Hub TwoInterested in this information?Contact us
14.45 miles Ridge ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.45 miles Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
14.47 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
14.47 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
14.47 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.49 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
14.49 miles PowerHouse ABX1
14.50 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.53 miles South CampusInterested in this information?Contact us
14.53 miles Park AlphaInterested in this information?Contact us
14.54 miles Park GammaInterested in this information?Contact us
14.56 miles 44751 Round Table (Bldg P)
14.57 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
14.57 miles Equinix DC15
14.58 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
14.60 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
14.62 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
14.65 miles Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.67 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
14.67 miles Global PlazaInterested in this information?Contact us
14.70 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
14.71 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
14.72 miles Metro PlazaInterested in this information?Contact us
14.73 miles Equinix DC16
14.73 miles Equinix Ashburn DC6
14.73 miles Equinix Ashburn DC11
14.74 miles CloudHQ: LC1B
14.76 miles SDC: Import Plaza D
Building D is a planned 20,000 sq ft server storage building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, approved by Loudoun County in June 2026.
14.76 miles Hub UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.78 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
14.79 miles SDC: Import Plaza C
Building C is a single-story, 14,160 sq ft support building on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, leased to Amazon Web Services as IAD-606.
14.79 miles Edge HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.80 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
14.80 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
14.80 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
14.80 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
14.81 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
14.81 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
14.82 miles Equinix Ashburn DC1
14.82 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
14.82 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.82 miles SDC: Import Plaza B
Building B is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2022 and leased to Amazon Web Services as IAD-162.
14.83 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
14.84 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
14.87 miles Edge ValleyInterested in this information?Contact us
14.88 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
14.89 miles Equinix Ashburn DC5
14.91 miles TowerInterested in this information?Contact us
14.91 miles Lumen Ashburn
14.93 miles Plaza AlphaInterested in this information?Contact us
14.94 miles Equinix Ashburn DC4
14.94 miles North RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.94 miles 44520 Hastings (ACC3) Digital Realty
14.95 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
14.97 miles 44274 Round Table (Bldg L)
14.97 miles SDC: Import Plaza A
Building A is a two-story, 258,716 sq ft data center on SDC Capital Partners' Import Plaza campus in Ashburn, Virginia, completed in 2021 and leased to Amazon Web Services as IAD-161.
14.97 miles 44490 Chilum (ACC2): Digital Realty
14.99 miles 21744 Sir Timothy Drive (ACC10)
15.00 miles NTT VA2
15.00 miles HubInterested in this information?Contact us
15.01 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
15.02 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
15.04 miles 44372 Round Table: Digital Realty
15.04 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
15.05 miles PrimeInterested in this information?Contact us
15.06 miles Tower PrimeInterested in this information?Contact us
15.06 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
15.06 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
15.07 miles 44470 Chillum - Digital Realty
15.07 miles Core CampusInterested in this information?Contact us
15.08 miles 21745 Sir Timothy (ACC9) Digital Realty
15.09 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
15.09 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
15.10 miles Point GammaInterested in this information?Contact us
15.11 miles 44521 Hastings (ACC5) Digital Realty
15.11 miles Metro ValleyInterested in this information?Contact us
15.15 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
15.15 miles Valley PlusInterested in this information?Contact us
15.16 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
15.16 miles Rackspace Ashburn IAD3
15.16 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
15.17 miles EdgeInterested in this information?Contact us
15.22 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
15.23 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
15.24 miles Park ThreeInterested in this information?Contact us
15.26 miles 44100 Digital Loudoun Plaza (Bldg J)
15.27 miles 44060 Digital Loudoun Plaza (Bldg K)
15.30 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
15.34 miles Edge CenterInterested in this information?Contact us
15.35 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
15.37 miles 43780 Digital Loudoun Plaza (Bldg H)
15.39 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
15.39 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
15.40 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
15.40 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
15.41 miles 43940 Digital Loudoun Plaza (Bldg G)
15.41 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
15.46 miles RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.46 miles Equinix DC13
15.47 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
15.47 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
15.48 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
15.50 miles Center GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.51 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
15.53 miles North TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.53 miles 43915 Devin Shafron (Bldg A)
15.54 miles NTT VA5
15.56 miles NTT VA4
15.59 miles 43881 Devin Shafron (Bldg B)
15.59 miles NTT: VA9
15.60 miles Hyperscale Data CenterInterested in this information?Contact us
15.60 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
15.60 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
15.64 miles Hyperscale Data CenterInterested in this information?Contact us
15.67 miles Hyperscale Data CenterInterested in this information?Contact us
15.68 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.69 miles Deft: DRT-IAD1
15.69 miles 43830 Devin Shafron (Bldg F)
15.70 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
15.70 miles 43831 Devin Shafron (Bldg C)
15.70 miles NTT: VA8
15.73 miles Hyperscale Data CenterInterested in this information?Contact us
15.75 miles Sabey Intergate: Ashburn Bldg-B
15.77 miles 43790 Devin Shafron (Bldg E)
15.77 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.80 miles 43791 Devin Shafron (Bldg D)
15.81 miles Global HubInterested in this information?Contact us
15.86 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
15.87 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
15.87 miles FastServ Ashburn
15.92 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
15.92 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.94 miles DataBank Ashburn IAD3
15.95 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
15.97 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
16.22 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
16.43 miles Sansone: Silver Spring, MD
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
16.46 miles DataBridge: Silver Spring MD
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
16.61 miles Ridge GammaInterested in this information?Contact us
16.63 miles Point PrimeInterested in this information?Contact us
16.74 miles Metro TowerInterested in this information?Contact us
16.77 miles Station PlusInterested in this information?Contact us
16.80 miles EastInterested in this information?Contact us
16.99 miles Core TowerInterested in this information?Contact us
17.02 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
17.18 miles PrimeInterested in this information?Contact us
17.20 miles West TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.27 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
17.30 miles Center TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.39 miles PowerHouse: Arcola Bldg B
Building B is the second of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
17.45 miles PowerHouse: Arcola Bldg A
Building A is the first of two two-story data center buildings on PowerHouse's Arcola campus in Loudoun County, Virginia.
17.50 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
17.69 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
17.85 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
17.88 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
17.92 miles Equinix Manassas DC14
17.94 miles Verizon: 7777 Infantry Ridge
Former AOL data center
17.98 miles AiNET Beltsville WDC-1
18.04 miles JK Land: Tech Park 1 Expansion
18.07 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
18.09 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
18.17 miles Central ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.20 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
18.21 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.22 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
18.35 miles TowerInterested in this information?Contact us
18.37 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
18.46 miles South PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.46 miles CyrusOne: Broadlands Expansion
18.52 miles Valley OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.53 miles Tower AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.67 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.69 miles South ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.70 miles PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.77 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.77 miles Core CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.83 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
18.85 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
19.06 miles PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.10 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.11 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.11 miles Cloud PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.13 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.13 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.14 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
19.17 miles Lerner: Landover Expansion
19.18 miles Global HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.18 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.23 miles Lerner: Landover, MD
19.24 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
19.25 miles Ridge PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.25 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.26 miles Plaza GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.35 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.36 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
19.40 miles Compass Loudoun County
19.41 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.43 miles TPC: Manassas, VA
19.45 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
19.47 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
19.47 miles Metro RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.52 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
19.54 miles Luck Stone: Ashburn Expansion
19.56 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
19.59 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
19.61 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
19.61 miles Core PlazaInterested in this information?Contact us
19.66 miles South CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.70 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
19.71 miles Global ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.72 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
19.72 miles Hub PlusInterested in this information?Contact us
19.72 miles StationInterested in this information?Contact us
19.74 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
19.75 miles Center PlusInterested in this information?Contact us
19.79 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
19.81 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
19.81 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
19.81 miles North RidgeInterested in this information?Contact us
19.84 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
19.86 miles Tower AlphaInterested in this information?Contact us
19.87 miles Active Infra: Spring Valley 1
Spring Valley 1 is the first proposed building at Active Infrastructure's Spring Valley Technology Park near Leesburg, Virginia.
19.92 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
19.95 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
19.96 miles Digital Realty: IAD53
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.

DataBank McLean IAD2 Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium
State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's grow...

Virginia Senator Perry Proposes Three-Year Statewide Data Center Moratorium

October 15, 2026 Virginia

State Sen. Russet Perry on Tuesday released draft legislation that would halt approvals for new data centers across Virginia for three years, escalating the political fight over the industry's growth in the world's largest data center market. Senate Bill 843 would take effect July 1, 2027 and...

Read more
Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read DataBank raises capital for new data centers
DataBank raises capital for new data centers

DataBank raises capital for new data centers

November 29, 2023 DataBank

DataBank has raised $533 million of capital to build new data centers through debt and equity. This brings the total funds raised by the company this year to $1.6 billion, with $715 million of secured notes issued in February and a $350 million credit facility announced later in March. DataBank...

Read more
Read DataBank plans 192MW data center facility in Virginia
DataBank plans 192MW data center facility in Virginia

DataBank plans 192MW data center facility in Virginia

November 16, 2023 DataBank

DataBank announced it has acquired 85 acres of land in Culpeper, Virginia, to construct a new data center campus, which will host up to three two-story data centers offering 1.4 million square feet of space. The new facility will use DataBank’s recently announced Universal Data Hall Design...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?