DataBank raises capital for new data centers
November 29, 2023
DataBank
In 2023, Databank expanded the site from 15,000sqft and 1.2 MWs to a total of 60,000 sqft and 7.5 MWs.
| Distance | Site | About |
|---|---|---|
| 8.78 miles | Mapletree: 7337 Trade |
Mapletree 7337 Trade Street is a 499,402 square foot, five-story data center and office facility built in 1983 on 17 acres in San Diego's Miramar Industrial Park, and owned by Mapletree Redwood Data Centre Trust.
|
| 9.75 miles | LightEdge: San Diego (SDTC) |
The site was previously known as " AIS West San Diego (SDTC)", before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
|
| 10.19 miles | AT&T San Diego | |
| 10.99 miles | ScaleMatrix San Diego |
The San Diego facility is its own facility, with 25,000 square feet of datacenter space built out today and the option to expand into another 75,000 square feet of space, spread across two buildings on the campus.
|
| 11.54 miles | Lumen San Diego 2 |
Lumen 8923 Complex Drive is a 3,953 square foot carrier-neutral data center with 1,206 square feet of colocation space in San Diego's Kearny Mesa area, operated by Lumen Technologies and focused on network connectivity services.
|
| 11.54 miles | CariNet | |
| 11.55 miles | i2b Networks San Diego |
|
| 11.58 miles | LightEdge: San Diego (Lightwave) |
The site was previously known as AIS Lightwave (LWDC), before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
|
| 11.63 miles | Verizon: 5771 Copley |
Former XO facility
|
| 11.64 miles | EdgeConneX San Diego |
|
| 12.66 miles | DataBank San Diego Kearney Mesa |
|
| 12.95 miles | Lumen San Diego 1 | |
| 16.86 miles | Lumen San Diego 3 |
The site was originally a Global Crossing facility
|
DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.
Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.
November 29, 2023
DataBank
November 16, 2023
DataBank
November 01, 2023
DataBank
September 30, 2023
San Diego
September 22, 2023
DataBank
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas