DataBank Austin AUS1

Latest Podcast 7218 McNeil Dr
Operational
Fully operational facility
Operated by:

DataBank Austin AUS1

Short Code: AUS1
░░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History:

  • In 2020, the site was acquired by DataBank
  • In 2013, the site was acquired by Zayo from Core NAP.

Map and Nearby Locations

7218 McNeil Dr
DataBank Sites
Nearby Facilities

Sites within 15 miles of DataBank Austin AUS1

Distance Site About
3.47 miles Verizon: 11501 Domain
Formerly an XO site
5.26 miles Valley AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.62 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
6.88 miles Switch: AUS05 EVO DC
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 72,600 sq ft of gross floor area.
7.37 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
7.67 miles Element Critical Austin
In 2021, Element Critical acquired the building from vXchnge.
7.92 miles Sabey: Austin 1B
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
7.95 miles Sabey Austin 1A
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
9.01 miles Skybox: Austin 2
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
9.11 miles Skybox: Austin 1
10.28 miles Skybox: Round Rock, TX
The Round Rock City Council has unanimously approved a rezoning request from Skybox Datacenters to develop a 30-acre facility in the Austin, Texas area.
10.32 miles University of Texas: Austin
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
10.86 miles American Tower: Austin
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
11.39 miles DPO: Texas
Digital Power Optimization partners with Schneider for data centers at Texas wind farms.
11.65 miles Blueprint: Georgetown DC
US data center firm Blueprint Data Centers is investing $160 million to develop a 10-acre data center in Georgetown.
12.34 miles Lumen Austin 3 (500 Chicon)
12.38 miles LOGIX Austin (1905 E 6th)
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
12.73 miles Citigroup: Georgetown
The Georgetown site was launched in 2008 and is LEED Gold Certified.
12.98 miles CoreWeave: Austin, TX
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
13.03 miles Core Scientific: Austin, TX
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
13.82 miles Colovore: Hutto, TX
Colovore is developing a liquid-cooled data center outside Austin, Texas, featuring a 180,000-square-foot (16,720-square-meter) data center and a 13,000-square-foot office complex.
13.88 miles Verizon: 2100 HWY 35
Former XO Communications site
14.89 miles Zydeco Development: Hutto, Texas
Following the formal withdrawal of its rezoning application, Zydeco Development Corporation has halted plans for its proposed data center in Hutto, Texas.
15.65 miles LightEdge Austin1 Montopolis
OnRamp Staffs the site 24/7/365 Power Densities up to 30kW / Rack Outside of 100 year and 500 Year Flood Plains
15.66 miles Lumen Austin 4
15.76 miles CyrusOne Austin I
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
15.79 miles Switch: Austin 1 (ADC)
Operated since 2003. Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
15.82 miles 7620 Metro - Digital Realty
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
15.86 miles 7401 E Ben White - Digital Realty
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
16.01 miles Digital Realty: AUS11
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
16.19 miles Skybox: Hutto 1
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.30 miles Iron Mountain Hutto
16.31 miles Skybox: Hutto 2
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.31 miles CyrusOne: Austin III
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
16.40 miles Skybox: Hutto 3
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.42 miles CyrusOne Austin II
Supports 250 wpsf with the ability to support over 1,000 wpsf Raised Floor: 48"
16.43 miles DataCanopy: Austin, TX
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
16.47 miles Skybox: Hutto 4
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.55 miles Switch: Texas 3
Texas 3 (AUS03) is Switch's planned third data center on the Data Ranch campus in southeast Austin, a building of about 300,000 sq ft on the campus's vacant eastern lots next to a planned Austin Energy substation.
16.58 miles Skybox: Hutto 5
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.62 miles LightEdge Austin2 Burleson
The site was formerly operated by OnRamp before being acquired in July 2018.
16.65 miles Switch: Texas 2
Texas 2 is the second building on Switch's Data Ranch campus in southeast Austin. Data Foundry opened its first phase in 2018, and Switch bought it in 2021.
16.66 miles Skybox: Hutto 6
Skybox Datacenters and Prologis are building a massive campus near Austin, Texas which will offer up to 4 million square feet of data center space.
16.69 miles Switch: Texas 1
Texas 1 is the first building on Switch's Data Ranch campus in southeast Austin. Data Foundry built the single-story, 130,000 sq ft data center in 2010-2011 with three data halls, and Switch bought it in 2021.
16.88 miles Lumen Austin 1 (4207 Smith School)
17.05 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project e...

Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project east of the city that could reach one gigawatt of capacity. In a joint press release, the partners...

Read more
Read Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse
Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse ...

Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse Data Centers say could support up to one gigawatt. The partners announced the approval in a Business...

Read more
Read Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus
The first data center building at the 2,842-acre Cedar Creek campus being developed by [Pacifico Energy](https://baxtel.com/data-centers/pacifico-energy) and [BlackChamber Group](https://baxtel.com...

Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus

October 11, 2026 Pacifico Energy

The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...

Read more
Read AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas
AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas

AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas

February 13, 2025 Austin

What's causing the growth in data centers in Austin, TX? The answer is AI. Data centers and large AI consumers, like the Texas Advanced Computing Center’s supercomputers, require enormous amounts of energy and water, raising environmental concerns. Our research reveals there are 386 data centers...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?