Lumen Technologies

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million

Lumen Technologies Data Center Map

Lumen Technologies Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Lumen Technologies Locations

Lumen San Diego 2

San Diego

Lumen 8923 Complex Drive is a 3,953 square foot carrier-neutral data center with 1,206 square feet of colocation space in San Diego's Kearny Mesa area, operated by Lumen Technologies and focused on network connectivity services.

View Data Center

Lumen Louisville 1

Louisville

Lumen network and colocation facility in downtown Louisville, on the south edge of the central business district. One of three Lumen sites serving the Louisville metro and part of the legacy Level 3 fiber footprint. Compact carrier-hotel-style building anchored to the regional long-haul fiber ring.

View Data Center

Lumen Minneapolis 1

Minneapolis St Paul

Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.

View Data Center

Lumen: Lachine

Montreal

Lumen's Lachine facility is a single-storey, 10,240 sq ft colocation and network gateway site at 4825 rue François-Cusson in Montreal's Lachine borough. Level 3 Communications built it in 2000. It is now part of Lumen Technologies' colocation network.

View Data Center

Lumen Technologies Data Center Photos See all

11 North Pearl in Albany
Source: Baxtel
Satellite View of 4000 Chester
Source: Google Maps
Industrial Exterior
Source: Baxtel
Legacy Level3 facility only has DC Power
Source: Baxtel
Outside of 1201 Main Street Dallas
Source: Baxtel

Related News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Atlanta

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Cleveland Extends Data Center Moratorium Through January 29, 2027
Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning p...

Cleveland Extends Data Center Moratorium Through January 29, 2027

October 21, 2026 Cleveland

Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning permits and occupancy certificates frozen for new standalone data centers and also covers expansions...

Read more
Read Amazon Drops 800,000 Sq Ft Data Center Campus In Loudoun County Deal
Amazon Data Services has withdrawn its application to build four data centers on the former George Washington University campus in Ashburn, Virginia, ending a months-long standoff with Loudoun Coun...

Amazon Drops 800,000 Sq Ft Data Center Campus In Loudoun County Deal

October 21, 2026 Ashburn: Data Center Alley

Amazon Data Services has withdrawn its application to build four data centers on the former George Washington University campus in Ashburn, Virginia, ending a months-long standoff with Loudoun County. Officials announced the agreement, called Project Potomac Promise, at the Oct. 20 Board of...

Read more
Read Memphis Council Rejects Proposed 18-Month Data Center Moratorium
Memphis councilors rejected an 18-month data center moratorium, opting instead for a 135-day pause on new applications and a 90-day review of digital infrastructure projects. The longer proposa![be...

Memphis Council Rejects Proposed 18-Month Data Center Moratorium

October 21, 2026 Memphis

Memphis councilors rejected an 18-month data center moratorium, opting instead for a 135-day pause on new applications and a 90-day review of digital infrastructure projects. The longer proposal followed public opposition and protests at an October 6 council meeting. After a five-and-a-half-hour...

Read more
Read NorthC Breaks Ground on 4.5MW Geneva Data Center in Switzerland
NorthC has started construction on its sixth data center in Switzerland, a 4.5MW facility in Meyrin on the edge of Geneva. The building at The Hive technology park will deliver 4.5MW of IT capacity...

NorthC Breaks Ground on 4.5MW Geneva Data Center in Switzerland

October 21, 2026 Geneva

NorthC has started construction on its sixth data center in Switzerland, a 4.5MW facility in Meyrin on the edge of Geneva. The building at The Hive technology park will deliver 4.5MW of IT capacity across 5,400 square meters (58,125 sq ft), released in phases of 1.5MW, according to NorthC's...

Read more
Read Evolution Power Proposes 1GW Data Center And 1.3GW Solar Farm In Norfolk
[Evolution Power Limited](https://www.evolutionpower.co.uk) has opened a community consultation on [Longmarsh Green Energy](https://longmarshgreenenergy.co.uk), a proposal pairing a data center cam...

Evolution Power Proposes 1GW Data Center And 1.3GW Solar Farm In Norfolk

October 20, 2026 England

Evolution Power Limited has opened a community consultation on Longmarsh Green Energy, a proposal pairing a data center campus that would draw up to 1GW with a 1.3GW solar farm and battery storage across about 4,695 acres of farmland near King's Lynn in west Norfolk. The developer says the scheme...

Read more

Related Podcasts See all

Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?