Lumen San Antonio

Latest Podcast 5130 Service Center Drive
Operational
Fully operational facility
Operated by:

Lumen San Antonio

░░░ Request Dataset MW
Total Power

Lumen San Antonio 1 & 4 are in the same building.

Power:


  • Power density: 100 watts/sq. foot
  • Type: AC with conditioned UPS power
  • Utility: Dual 1000kW utility transformers, 2N
  • A and B power paths to critical loads.
  • UPS Energy Storage: Battery energy storage system
  • Emergency Power: Two diesel generators, N+1
  • Units housed in enclosures for protection with physical separation between units and switchgear
  • Fuel Storage: 30-plus hours of fuel

Location:


  • Campus: Single story building
  • Parking: 10-plus stalls
  • Shipping: Street-level loading dock
  • Access: Facility accessible to customers 24 x 7
  • Flood Plain: Outside 100-year flood plain
  • Seismic: Meets 1997 UBC Zone 1 standards
  • Storage: Secure storage room available for customer use
  • Customer temporary office space and conference room

Building:


  • High-density floor: Raised floor 24”
  • Floor load: 300 lbs./sf
  • Fire Suppression: Pre action dry-pipe
  • Vesda early warning detection

Map and Nearby Locations

5130 Service Center Drive ( Suite 104 )
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen San Antonio

Distance Site About
3.94 miles North ParkInterested in this information?Contact us
Microsoft’s SAT93 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT94 on County Road 381, with $26M investment, powered by Medina Electric Cooperative, and scheduled for construction from 2027 to 2029.
6.53 miles H5 San Antonio - 100 Taylor
100 Taylor Street is San Antonio's Carrier Hotel.
6.94 miles H5: San Antonio 2
H5 Data Centers is expanding its Texas footprint after executing a Letter of Intent (LOI) to acquire a new suburban San Antonio site.
7.04 miles Lumen San Antonio 3
7.35 miles Lumen San Antonio 2
10.12 miles Bexar Datacenter: San Antonio SAT1
Bexar Datacenter opened its San Antonio facility in 2005, providing both data center and office space at a single location.
11.27 miles University of Texas: Health Science Center
The UT Health San Antonio data center is a prefabricated modular solution.
11.96 miles ValleyInterested in this information?Contact us
12.56 miles East HubInterested in this information?Contact us
The Bitter Blue facility in San Antonio is a planned two-story, single-tenant data center developed by Amazon Web Services through Amazon Data Services.
14.61 miles Legacy: San Antonio
Legacy Investing is developing a new AI-focused data center campus at the former San Antonio Karting Complex site in Marion, Texas, east of San Antonio. The project is in pre-application/under-development status and is expected to be ready for service in Q4 2027.
14.86 miles Park ProInterested in this information?Contact us
14.94 miles Global CampusInterested in this information?Contact us
15.72 miles Tract: Applewhite Tech Park
Tract is planning to build the Applewhite Technology Park on 339 acres of industrial land on the south side of San Antonio, near Toyota and Texas A&M San Antonio.
15.80 miles QTS San Antonio
QTS' San Antonio campus, located at 8535 Potranco Road, sits approximately eight miles east of the new plot.
16.76 miles CyrusOne: SAT4
16.84 miles Stream San Antonio II
16.87 miles CyrusOne: SAT3
16.92 miles CyrusOne: San Antonio SAT2
Located near CyrusOne’s first San Antonio facility, the new site will have up to 196,000 colocation square feet (CSF) and 20,000 sq. ft. of superior Class A office space that can be used by customers.
17.34 miles Valero Wiserman
17.48 miles East ValleyInterested in this information?Contact us
In late 2020, Microsoft acquired 33.55 acres around the Valero (NYSE: VLO) data center
17.84 miles CyrusOne: San Antonio SAT1
CyrusOne launched its first data center in San Antonio in 2012.
17.86 miles Black Mountain: San Antonio, TX
Black Mountain Power, a subsidiary of the energy-focused Black Mountain family of companies, is transforming 432 acres in San Antonio into a massive "hyperscale-ready" data center campus.
17.92 miles Park TwoInterested in this information?Contact us
18.11 miles Global StationInterested in this information?Contact us
18.32 miles PlusInterested in this information?Contact us
Microsoft acquired the 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.
18.35 miles Vantage: San Antonio TX21
Vantage TX-21 is a three-story data center in San Antonio. The land for this facility was acquired in August 2023.
18.42 miles Vantage: TX22
Data center operator Vantage is developing a two-story, 214,525 square-foot (19,930 sqm) facility known as TX22.
18.46 miles Metro CenterInterested in this information?Contact us
Microsoft's SAT15 data center is located at 3555 Westover Link in San Antonio’s Bexar County. Microsoft invested $215.9 million for this 245,000 sq ft facility.
18.53 miles Center AlphaInterested in this information?Contact us
Microsoft plans to build yet another data center SAT16 at its campus at 3555 Westover Link in San Antonio. The project is described as a building shell and fit out associated with 245,000 square foot (22,760 sqm) data center.
19.42 miles Stream: San Antonio VI
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
19.45 miles Stream: San Antonio V
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
19.46 miles Stream: San Antonio IV
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
19.46 miles Stream: San Antonio VII
This data center is a part of Stream's 135-acre hyperscale campus in San Antonio, Texas.
19.46 miles Stream: San Antonio III
In June 2024, Stream Data Centers announced its groundbreaking of a new 135-acre hyperscale campus in San Antonio, Texas.

Lumen San Antonio Data Center Photos See all

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
115
Markets
279MW
Megawatts

News See all

Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data, voice,...

Read more
Read US Defense Information Systems Agency awards $110 million contract to Lumen
US Defense Information Systems Agency awards $110 million contract to Lumen

US Defense Information Systems Agency awards $110 million contract to Lumen

November 10, 2023 Lumen Technologies

The US Defense Information Systems Agency has awarded Lumen Technologies a $110 million contract to provide mission-critical network services to the US Department of Defense (DoD). This contract has a timeline of five years, from November 30, 2023, through September 30, 2028. This contract is an...

Read more
Read Lumen sells CND customers to Akamai as it shuts down the business
Lumen sells CND customers to Akamai as it shuts down the business

Lumen sells CND customers to Akamai as it shuts down the business

October 16, 2023 Lumen Technologies

Lumen announced that it’s Content Delivery Network (CDN) business will be shut down and it has sold its customer contracts to Akamai. Both companies will undergo a transition services agreement for 90 days before Lumen completes its shut down. "We are deep into our transformation of Lumen and...

Read more
Read Lumen, a US telco, loses $8.74bn due to non-cash impairment
Lumen, a US telco, loses $8.74bn due to non-cash impairment

Lumen, a US telco, loses $8.74bn due to non-cash impairment

August 03, 2023 Lumen Technologies

In the second quarter, Lumen Technologies reported a loss of $8.74 billion, a significant decrease from the $344 million profit in the same quarter last year. The company, formerly CenturyLink Enterprise, has lost more than 66 percent of its value this year, reducing its market capitalization to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?