Nuremberg is the second data centre hub in Bavaria, after Munich. The market covers Nuremberg and Fürth and reaches north into Upper Franconia, with sites near Bamberg and in Bayreuth. Hosting companies, enterprise software firms and regional colocation providers shape it more than hyperscale cloud providers do. Two Franconian firms, noris network and Hetzner, run its largest campuses.
History
Nuremberg's market grew from carriers and local firms around 2000. noris network moved into the Deutschherrnkarree in 2000, and the complex became the city's carrier hotel. IP Exchange and Level 3 ran colocation in the Nürnberg-Feucht-Wendelstein business park on the city's southeastern edge, where DATEV opened a new data centre in 2011. In 2012 noris opened its Nürnberg Süd campus, and Hetzner opened the first building of its park. Contabo opened its second Nuremberg data centre in 2014, and ODN opened its Fürth site in 2015. In 2021 q.beyond sold DATEV's building to DATEV and its IP Exchange business to NorthC. nLighten took over EXA Infrastructure's Nuremberg site in 2023.
The Market Today
In the city centre, noris runs Nürnberg Zentrum in the Deutschherrnkarree. The building also houses Core-Backbone and access points for the N-IX and frankonIX exchanges. The company's Nürnberg Süd campus sits in the south of the city. Hosting firm Hetzner runs a park on the western edge with eight data centre buildings, two of which opened in early 2026.
NorthC and DATEV run data centres in the Nürnberg-Feucht-Wendelstein business park, where Level 3's former site has closed. Contabo, nLighten, euNetworks and Fujitsu run sites in the city. In Fürth, ODN runs a data centre that ScaleUp markets, and Atos runs another.
Beyond the city, T-Systems runs a site in Bamberg and hosting firm centron runs one in nearby Hallstadt. Aleph Alpha opened its Alpha ONE AI compute centre in a former newspaper printing hall in Bayreuth in 2022.
Advantages
-
Hosting base. Hetzner, Contabo and noris serve hosting and cloud customers across Europe from Nuremberg. DATEV, the tax-software cooperative, runs its own data centres in the city.
-
Interconnection. The Deutschherrnkarree carrier hotel and two neutral exchanges, N-IX and frankonIX, connect the market's main buildings.
-
Industrial sites with power. The former Playmobil factory in Dietenhofen, west of Nuremberg, already has a 110 kV grid connection with two feeds. Its owner plans Playmobil digital, a data centre campus on about 18 hectares.
Challenges
-
Scale. The market is smaller and more fragmented than Munich's. Several sites are small carrier rooms or single-company data centres.
-
Grid capacity. Large loads need transmission capacity from TenneT, which now ranks connection requests by project maturity. Results of the first round are due at the end of November 2026.
-
Power costs. German industrial power prices and grid fees rank among the highest in Europe.
-
Approvals. The Dietenhofen campus still needs municipal approval, and its owner has named no tenants or schedule.
Trends
-
Higher density. At Nürnberg Süd, noris is building a third section for 2027. It is designed for direct liquid cooling of racks of up to 1,000 kW and 800 V HVDC power distribution.
-
Investor demand. AEW bought a fully leased Nuremberg data centre from Aventos in February 2026, its first data centre investment in Bavaria.
-
AI compute consolidates. Cohere has agreed to acquire Aleph Alpha, and the combined company plans to run on Schwarz Digits data centres.
Power and Policy
N-ERGIE Netz distributes power in Nuremberg and the surrounding region, and infra fürth serves Fürth. TenneT runs the transmission grid, and the Federal Network Agency (Bundesnetzagentur) regulates it. The federal Energy Efficiency Act (EnEfG) requires data centres of 300 kW or more to register. Those opening from July 2026 must reach a PUE of 1.2 and reuse part of their waste heat. In October 2026 the Bavarian cabinet discussed an Aktionsplan Rechenzentren. Each district government now has a grid-connection coordinator.