Lumen Fort Worth 2

Latest Podcast
1101 E 9th St
Operational
Fully operational facility
Operated by:

Lumen Fort Worth 2

░░░░ Request Dataset MW
Total Power

Map and Nearby Locations:

1101 E 9th St
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen Fort Worth 2

Distance Site About
0.50 miles Lumen Fort Worth 1
0.58 miles Lumen For Worth 3
0.65 miles LOGIX Fort Worth
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
7.16 miles Novartis
8.28 miles 5CDC: Dallas DFW01
The facility encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot.
8.43 miles Black Mountain: Fort Worth, TX
Black Mountain has filed to rezone 141 acres at the intersection of Lon Stephenson Road and Forest Hill Drive to develop a data center.
9.24 miles Hyperscale Data Center Request Dataset
10.56 miles Edged Energy: DFW02 Expansion
10.79 miles Edged Energy: Ft. Worth DFW02
Edged Energy intends to construct another data center campus in Fort Worth, with operations expected to begin in Q2 2027.
10.95 miles CyrusOne: DFW7
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
11.27 miles Prime: DFW04-03
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.
11.28 miles ACS: Fort Worth Expansion
11.31 miles ACS: Fort Worth, Texas
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
11.38 miles Prime: Dallas DFW04-01
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by 2026.
11.43 miles Prime: DFW04-02
Prime Data Centers is building a $1.6 billion campus near Benbrook. The project includes three, two-story structures being built near Aledo and Chapin School roads. The site is slated for completion by January 2026.
11.51 miles Mapletree: 5000 South Bowen
12.94 miles Rock Creek Expansion
12.94 miles Rock Creek Data Center Project
The proposed data center, known as the Rock Creek Data Center Project, is a large-scale commercial development planned for a 121-acre tract at 10375 Old Granbury Road in Fort Worth.
16.00 miles Tierpoint Fort Worth
The property came to market in 2023 and was acquired by Tierpoint.
16.07 miles STACK Fort Worth Alliance
STACK's expansion Alliance campus in Fort Worth
16.24 miles Hyperscale Data Center Request Dataset
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
16.44 miles QTS: FTW1-DC2
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
16.53 miles QTS Dallas Fort Worth
QTS's Forth Worth site is the company's second data center in Dallas Market.
17.13 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.
17.41 miles Rackspace Grapevine DFW1
17.91 miles Citigroup Fort Worth

Lumen Fort Worth 2 Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?