Lumen Toronto 1

Latest Podcast 8 Garamond Ct
Operational
Fully operational facility
Operated by:

Lumen Toronto 1

Year Built: 2001
Utility Provider: Toronto Hydro
░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

8 Garamond Ct
Lumen Technologies Sites
Nearby Facilities

Lumen Toronto 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Lumen Toronto 1

Distance Site About
1.50 miles Beeches Development: East York, ON
Toronto-based Beeches Development Inc. has proposed a new data center in the Leaside business park, marking the third iteration of plans for the site at 154-156 Wicksteed Avenue.
2.02 miles TELUS: Toronto Laird
TELUS's Toronto Intelligent Internet Data Centre at 73 Laird Drive in East York, a former PSINet facility. The City of Toronto has leased data centre space there since 2007.
2.92 miles Cogent: Toronto
3.96 miles Stack: TOR01A
TOR01A is the first building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto. Developer First Gulf partnered with STACK to renovate the existing 89,000 sq ft building, delivered in September 2023.
3.97 miles Stack: TOR01C
TOR01C is a proposed 212,000 sq ft building, the third phase of Stack Infrastructure's TOR01 campus in Scarborough, Toronto.
4.04 miles Stack: TOR01B
TOR01B is a proposed 217,000 sq ft building on Stack Infrastructure's TOR01 campus in Scarborough, Toronto, in site plan review.
4.16 miles ILAP 210 Sheppard
5.43 miles Urbacon Toronto - 281 Front Street
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
5.47 miles Equinix Toronto TR2
TR2 is also known as Parliament Street Data Centre TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems. TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
5.68 miles Qscale: Toronto
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
5.68 miles Edgeconnex Toronto
EdgeConneX's Toronto edge data centre at 565 Gordon Baker Road in North York, a 38,900 sq ft facility opened in 2018.
5.84 miles TNW Toronto
6.00 miles Yondr: Toronto TOR1
The three-story facility, being built on a 4.5-acre plot, will feature closed-loop cooling technology. The project is expected to be ready for service by mid-2026.
6.06 miles eStruxture TOR-2
eStruxture's TOR-2 data centre on the eighth floor of 145 King Street West in Toronto's financial district, formerly Cogeco Peer 1 King Street.
6.07 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
6.10 miles CentriLogic Toronto
CentriLogic's downtown Toronto data centre in Suite 300 at 55 York Street, a 16,000 sq ft managed services and colocation facility.
6.22 miles Amanah: TOR2
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
6.23 miles Telehouse: 151 Front Street West
Telehouse Canada's flagship carrier hotel at 151 Front Street West, beside Union Station in downtown Toronto. It is home to the Toronto Internet Exchange and to suites run by many colocation and network operators.
6.23 miles Coloware: YTZ-1
Coloware's YTZ-1 data centre inside the 151 Front Street West carrier hotel in downtown Toronto, opened in 2020 and expanded in 2024.
6.23 miles TMX: Markham Colocation
TMX Group's colocation data centre at 3500 Steeles Avenue East in Markham, built for trading firms connecting to the Toronto Stock Exchange.
6.23 miles Amanah: TOR1
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
6.23 miles Digital Realty 151 Front
6.23 miles Priority Colo TOR1
6.23 miles eStruxture TOR-1
eStruxture's TOR-1 colocation suites inside the 151 Front Street West carrier hotel in downtown Toronto, spread across four data halls on three floors.
6.24 miles Neutral Data Toronto
6.24 miles Cologix Toronto TOR1
Cologix operates seven discrete data centre suites at 151 Front Street West (TOR1), Canada's largest carrier hotel.
6.24 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
6.24 miles Hive DC: Toronto
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
6.24 miles 3z Canada: 151 Front
6.24 miles Content Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.25 miles Beanfield 151 Front St
Beanfield colocation inside the 151 Front Street West carrier hotel in downtown Toronto, with boutique multi-cabinet halls cooled by Enwave deep-lake water.
6.28 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.31 miles Telehouse: 250 Front Street West
Telehouse Canada data centre in the Canadian Broadcasting Centre at 250 Front Street West, a block from the 151 Front Street West carrier hotel in downtown Toronto.
6.34 miles Beanfield 250 Front St
Beanfield colocation at 250 Front Street West in the Canadian Broadcasting Centre block of downtown Toronto, with multi-cabinet halls cooled by Enwave deep-lake water.
6.87 miles Nüday Networks
7.08 miles Telehouse: 905 King Street West
Telehouse Canada data centre at 905 King Street West in Toronto's Liberty Village, linked by dark fibre to the 151 and 250 Front Street West carrier hotels.
7.08 miles Cologix TOR3
Cologix's TOR3 data centre inside 905 King Street West in Toronto's Liberty Village, with diverse fibre to Cologix TOR1 at the 151 Front Street West carrier hotel.
7.09 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
7.09 miles Contegix Toronto
7.09 miles Beanfield 905 King St
Beanfield colocation suite inside 905 King Street West in Toronto's Liberty Village, on Beanfield's own fibre network.
7.60 miles Canada Cloud Data Centre
7.68 miles 371 Gough - Digital Realty
Digital Realty's YYZ10 data centre at 371 Gough Road in Markham, a 120,000 sq ft building fitted out in phases from 2014. Digital Core REIT owns a 90% interest.
7.68 miles Kyndryl: Markham
7.72 miles Beanfield 23 Fraser
Beanfield's ground-level colocation facility at 23 Fraser Avenue in Toronto's Liberty Village, with its own generator, dual UPS and direct access to Beanfield's fibre network.
7.76 miles Centersquare: Markham YYZ2
Centersquare's YYZ2 data centre at 4175 14th Avenue in Markham, opened by CenturyLink in August 2014 as its second Toronto-area facility.
8.01 miles eStruxture TOR-4 Scarborough
eStruxture's TOR-4 data centre at 20 Pullman Court in north Scarborough, a purpose-built facility formerly known as Cogeco Peer 1 Pullman.
8.20 miles Rogers Markham TOR DC3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
8.21 miles Qu DC: TOR3
The TOR3 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
8.22 miles Equinix Markham TR5
8.28 miles BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.29 miles Priority Colo TOR2
Priority Colo's TOR2 data centre at 600 Cochrane Drive in Markham, near Highways 404 and 7, built in 2013 for higher-density deployments.
8.31 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.52 miles Cologix TOR5
Cologix's TOR5 data centre at 105 Clegg Road in Markham, a purpose-built 40,000 sq ft facility next to Cologix TOR4.
8.52 miles CORE: Markham
Former Core Data Centres colocation operation at 105 Clegg Road in Markham. Cologix bought the building in September 2025 and runs it as Cologix TOR5.
8.52 miles Cologix TOR4
Cologix's TOR4 data centre in Markham, a purpose-built facility completed in October 2023, with diverse dark fibre to Cologix TOR1 at 151 Front Street West.
9.02 miles Pathway Communications
9.60 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
10.21 miles Compass: North York
Compass Datacenters' Toronto data centre at 15 Fenmar Drive in North York, a two-storey building completed in 2023 for a single hyperscale tenant.
10.69 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.91 miles Hut 8: Vaughan DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
10.99 miles 1 Century Place (TOR1) Digital Realty
Digital Realty's TOR1 wholesale data centre at 1 Century Place in Vaughan, just north of Toronto, built inside the former Toronto Star printing plant.
11.46 miles Urbacon: Richmond DC4
DC4 is Urbacon Data Centre Solutions' fourth data centre on its Barker Business Park campus in Richmond Hill. The 203,000 sq ft building has its permit and completed civil works.
11.48 miles Urbacon: Richmond DC3
DC3 is Urbacon Data Centre Solutions' third data centre on its Barker Business Park campus in Richmond Hill. The 111,000 sq ft facility was handed over in two stages in 2023 and 2024.
11.54 miles Urbacon: Richmond DC6
DC6 is the planned sixth data centre on Urbacon Data Centre Solutions' Barker Business Park campus in Richmond Hill.
11.65 miles Urbacon: Richmond DC1
DC1 is the first data center on Urbacon Data Centre Solutions' Barker Business Park Digital Campus in Richmond Hill, Ontario. The 118,135 sq ft facility opened in 2017.
11.65 miles Urbacon: Richmond DC2
DC2 is Urbacon Data Centre Solutions' second data centre on its Barker Business Park campus in Richmond Hill. The 105,000 sq ft facility was completed in October 2020.
11.69 miles Urbacon: Richmond DC5
DC5 will be Urbacon Data Centre Solutions' fifth data centre on its Barker Business Park campus in Richmond Hill. The planned 305,000 sq ft building is zoned for data centre use.
12.01 miles Whipcord Edge: TDC01
12.01 miles Whipcord Edge: Toronto TDC01
12.61 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.63 miles 3z Canada: Etobicoke
13.05 miles Centersquare: Etobicoke YYZ3
Centersquare's Toronto YYZ3 facility at 75-77 Fima Crescent, Etobicoke, a ~214,000 sq ft retrofit data center that Centersquare owns. It joined the portfolio in Centersquare's October 2025 ten-facility North American acquisition.
13.35 miles eStruxture TOR-3 (Etobicoke)
eStruxture's TOR-3 data centre at 431 Horner Avenue in Etobicoke, west Toronto, with three data halls and natural gas and diesel backup generation.
13.49 miles Cogent Mississauga
14.30 miles Urbacon: Toronto West DC7
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
15.01 miles Hut 8: Mississauga DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
15.32 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.35 miles South TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.30 miles CentriLogic: Greater Toronto, ON
CentriLogic's 28,000 sq ft purpose-built data centre at 7445 Tranmere Drive in Mississauga, opened in August 2015 in a building that earlier housed a Dell data centre.
17.40 miles Excell IT
17.62 miles CentriLogic Mississauga (South)
17.76 miles Cogent: Mississauga 2
18.10 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
19.10 miles Equinix Brampton TR6
19.16 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read Cryptominer Hive Digital acquires Toronto data center
Cryptominer Hive Digital acquires Toronto data center

Cryptominer Hive Digital acquires Toronto data center

June 25, 2025 Toronto

Crypto firm Hive Digital this week announced the signing of a purchase and sale agreement to acquire a facility with 7.2MW of installed capacity. Hive said the acquisition will support the development of a “sovereign Canadian AI ecosystem” through its wholly owned subsidiary, Buzz High...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data, voice,...

Read more
Read US Defense Information Systems Agency awards $110 million contract to Lumen
US Defense Information Systems Agency awards $110 million contract to Lumen

US Defense Information Systems Agency awards $110 million contract to Lumen

November 10, 2023 Lumen Technologies

The US Defense Information Systems Agency has awarded Lumen Technologies a $110 million contract to provide mission-critical network services to the US Department of Defense (DoD). This contract has a timeline of five years, from November 30, 2023, through September 30, 2028. This contract is an...

Read more
Read Lumen sells CND customers to Akamai as it shuts down the business
Lumen sells CND customers to Akamai as it shuts down the business

Lumen sells CND customers to Akamai as it shuts down the business

October 16, 2023 Lumen Technologies

Lumen announced that it’s Content Delivery Network (CDN) business will be shut down and it has sold its customer contracts to Akamai. Both companies will undergo a transition services agreement for 90 days before Lumen completes its shut down. "We are deep into our transformation of Lumen and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?