Level3 Oslo

Økernveien 121

Operated by:

Map and Nearby Locations:

Økernveien 121
Click Map to begin Search

Sites within 15 miles of Level3 Oslo

Show SqM
Distance Site About
0.37 miles STACK OSL01 Ulven
0.43 miles TeliaSonera Oslo
0.91 miles Telenor: Hovinbyen, Oslo
1.12 miles Fujitsu Oslo
1.46 miles Bulk: Oslo Internet Exchange (OS-IX)
Bulk Infrastructure has begun the expansion of its Oslo Internet Exchange facility (OS-IX) in Norway. The expansion will see three new data halls built, adding 5.5MW of IT capacity.
1.46 miles Verizon Oslo
1.46 miles IP-Only HMG9
1.80 miles Basefarm Oslo OSL3
1.92 miles Availo DC0
1.94 miles Blix Gullhaugveien
2.18 miles Blix CJH Oslo
3.01 miles Blix BDC Oslo
3.08 miles SSC Forskningsparken Oslo (Oslo Science Park)
4.90 miles Basefarm Oslo OSL5
4.94 miles Orange: Lorenskog OSL5
Orange Business OSL5 Data Center is located in Rasta in Oslo. The facility is the company's second data center in Norway and has been in operation since November 2017.
7.24 miles STACK OSL02
13.35 miles Green Mountain OSL1-Enebakk
Green Mountain is building a data center campus on a 75,000 m2 (800,000 ft2) area. The OSL1-Enebakk data center campus is located in Enebakk, just 20 km outside Oslo, the capital of Norway.
13.38 miles Green Mountain: OSL1 DC2
The second building (DC2) of Green Mountain's OSL1-Enebakk campus was launched in 2021.
13.40 miles Green Mountain: OSL1 DC4
In April 2023, Green Mountain announced another expansion at its OSL1-Enebakk site (previously known as DC3-Oslo).
13.48 miles Green Mountain: OSL1 DC3
The third building (DC3) of Green Mountain's OSL1-Enebakk campus was launched in December 2022. The 10,000 sqm (107,700 sq ft) three-story colocation facility was first announced in late 2021.
13.51 miles Green Mountain: OSL1 DC5
Green Mountain is developing another three-story building at its Enebakk campus. The new facility will span 9,600 m² (103,335 sq ft).
14.31 miles STACK OSL03C
14.35 miles STACK OSL03D
STACK OSL03D is the newly built data center on its OSL03 Campus. The building spans an area of 1800 sqm of white space.
14.36 miles STACK OSL03B
14.41 miles STACK OSL03 Campus
STACK's OSL03 campus, situated in Fetsund, south of Oslo, spans two hectares and runs on 100% renewable energy.

Level3 Oslo Data Center Photos

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
278 Facilities Owned
121 Markets Served
View Company

News

Read More News