Madison Data Center Market

Latest Podcast
Madison is Wisconsin's second data center market, a small, network-led hub of colocation, telco and enterprise data centers serving state government, the university, health care and insurance. Fiber density and talent draw operators. Local moratoria and proposed size limits keep hyperscale campuses out for now. Read More

Market Facts

Madison Data Center Map

Madison Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Madison

Name Company Size Status Type
5Nines 5Nines Extra Small Operational Carrier-Neutral
AT&T: 122 W Main St AT&T Extra Small Operational Carrier
AT&T: 1001 Spring St AT&T Extra Small Operational Carrier
AT&T: 2002 Reetz Rd AT&T Extra Small Operational Carrier
AT&T: 215 Kedzie St AT&T Extra Small Operational Carrier
AT&T: 729 Pflaum Rd AT&T Extra Small Operational Carrier
AT&T: 2802 Sylvan Ave AT&T Extra Small Operational Carrier
EdgeConnex Madison EdgeConneX Extra Small Operational, Prospective Expansion Carrier-Neutral
Lumen Madison 1 Lumen Technologies Extra Small Operational Carrier
Lumen: 710 E Mifflin St Lumen Technologies Extra Small Operational Carrier
QTS: Vienna, Wisconsin QTS Data Centers Withdrawn Carrier-Neutral
QTS: Vienna Expansion QTS Data Centers Withdrawn Carrier-Neutral
SupraNet Madison SupraNet Extra Small Operational Carrier-Neutral
US Signal: WI02 Madison US Signal Medium Operational, Planned Carrier
US Signal: WI01 Madison US Signal Extra Small Operational Carrier
Verizon: 117 N Bristol St, Sun Prairie Verizon Enterprise Extra Small Operational Carrier
Network222 Fiore Companies Extra Small Operational Carrier-Neutral
T-Mobile: Madison T-Mobile Extra Small Operational Carrier-Neutral
Brightspeed: 145 E Holum St, DeForest Brightspeed Extra Small Operational Carrier
Epic Systems: Verona Epic Systems Small Operational, Planned Enterprise
TDS: 1912 Parmenter St, Middleton TDS Telecom Extra Small Operational Carrier
TDS: Middleton Data Center TDS Telecom Decommissioned Carrier
American Family Insurance: Madison HQ American Family Insurance Extra Small Operational Enterprise
QBE: Sun Prairie QBE Insurance Group Decommissioned Enterprise
MHTC: 200 E Main St, Mount Horeb MHTC Extra Small Operational Carrier
Dane County Data Exchange I Dane County Data Exchange Small Operational, Prospective Expansion Real Estate
Wisconsin DET: Femrite Data Center Wisconsin Department of Administration Extra Small Operational Government

Largest Providers in Madison

Dane County Data Exchange
Site
Power
Operational
1
5.0
Construction
0
Planned
0
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Epic Systems
Site
Power
Operational
1
3.5
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Wisconsin Department of Administration
Site
Power
Operational
1
1.2
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
US Signal
Site
Power
Operational
2
1.15
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Madison

Location About Total SqFt Power (MW)
US Signal: WI02 Madison
US Signal's WI02 data center at 5515 Nobel Drive in Fitchburg, just south of Madison, Wisconsin, ...
NN Request Dataset NN Request Dataset
SupraNet Madison
SupraNet runs a SOC 2 Type II colocation data center at 8000 Excelsior Drive on Madison's west si...
NN Request Dataset
EdgeConnex Madison
EdgeConneX's MAD01 edge data center occupies a pod in the Dane County Data Exchange I building at...
NN Request Dataset
5Nines
5NINES runs a colocation data center in Suite 170 of Network222, the carrier hotel at 222 West Wa...
NN Request Dataset
Lumen Madison 1
Lumen Madison 1 is a Lumen colocation and network site in the Sunkist Building at 612 West Main S...
NN Request Dataset

About This Metro

Overview

Madison is Wisconsin's second data center market after Milwaukee. It is a small market built on networks and enterprise IT rather than wholesale leasing. State government, the University of Wisconsin-Madison, health care software and insurance drive demand. A hyperscale campus proposed north of the city in 2025 moved to Iowa in 2026.

History

Madison's data centers grew out of its telephone and internet networks. Wisconsin Telephone opened its main exchange downtown in 1949, and AT&T still runs it. UW-Madison started the Madison Internet Exchange (MadIX) in 2000. Berbee Information Networks opened a data center at its Fitchburg headquarters in 1999 and sold colocation from 2000.

Alliant Energy moved its headquarters out of a downtown office tower in 2002. The Fiore Companies rebuilt it as Network222, the city's telco hotel. 5NINES opened downtown colocation there in 2004, in Alliant's old data center. SupraNet had opened its own data center on the west side in 2002. The State of Wisconsin moved into its purpose-built Femrite Data Center in 2006.

TEAM Technologies opened a data center in Fitchburg in 2008, with CDW Berbee as its anchor tenant. TDS bought TEAM in 2010 and grew the site to six data rooms by 2017. In 2024, US Signal bought it with the rest of TDS's OneNeck business. EdgeConneX opened an edge data center on East Broadway in 2015.

Hyperscale arrived late and left quickly. In July 2025, QTS Data Centers proposed a large campus in the Town of Vienna, north of Madison. The town rejected its offer, and the Village of DeForest rejected an annexation in February 2026. Alliant Energy said that month that QTS had chosen Iowa instead.

The Market Today

US Signal runs the largest colocation facility, in Fitchburg, and plans a fourth data hall designed for liquid cooling in 2028. Downtown, Network222 houses 5NINES, US Signal and a MadIX switch. Lumen runs a site on West Main Street, and SupraNet serves the west side. EdgeConneX leases a pod in the Dane County Data Exchange building, whose owner markets the remaining space to new tenants.

Enterprise data centers hold much of the market's capacity. Epic Systems runs an underground hosting data center on its Verona campus and has a large expansion certified for the state tax exemption. The state runs the Femrite Data Center, UW-Madison runs a campus data center, and American Family Insurance runs one at its headquarters. AT&T, TDS, Verizon and Brightspeed operate telephone exchanges across Dane County, and T-Mobile runs a mobile switching center.

Several enterprise data centers have closed. CDW left the former Berbee site, and TDS left its Middleton office data center. QBE sold its Sun Prairie campus in 2025. Landlords now market the former TDS and QBE data center spaces for lease.

Advantages

  • Network hub. MadIX, Network222 and dense regional fiber give the market strong carrier choice for its size.
  • Talent. The university, Epic and the region's software sector supply engineers and IT staff.
  • Enterprise demand. Government, health care, insurance and research buyers create steady demand for colocation and network services.
  • Ready space. Vacant former enterprise data centers offer built rooms with generators and raised floors.
  • Tax incentives. Qualified data centers in Dane County pay no sales tax on equipment if they invest at least $150 million within five years.
  • Cool climate. Long winters support free cooling for much of the year.

Challenges

  • Moratoria. The City of Madison paused new data centers over 10,000 square feet in January 2026. Dane County, Westport, Middleton, Cottage Grove and Sun Prairie adopted their own pauses later that year.
  • Size limits. Madison's draft zoning rules would ban data center buildings over 100,000 square feet and multi-building campuses.
  • Community opposition. Residents in Vienna and DeForest opposed the QTS campus until it left the county.
  • Small wholesale inventory. Most operating space is retail colocation or private enterprise rooms, so large tenants find little ready capacity.

Trends

  • Enterprise to colocation. Companies are closing private data centers, and UW-Madison sought off-campus colocation for research computing in 2025.
  • Liquid cooling. New colocation capacity in Fitchburg is designed for liquid cooling.
  • Hyperscale goes elsewhere. QTS took its Dane County plan to Iowa, while hyperscale builds continue in southeast Wisconsin.
  • Large-load tariffs. Madison Gas and Electric filed a tariff for customers of 100 MW or more in July 2026. It told regulators it had no current requests that large.

Power and Policy

Madison Gas and Electric (MGE) serves downtown Madison, the east side, Fitchburg and Middleton. Alliant Energy serves DeForest, Vienna, Verona and the west side near Excelsior Drive. Sun Prairie, Stoughton and Mount Horeb run municipal utilities. American Transmission Company (ATC) owns the high-voltage grid, and the Midcontinent Independent System Operator (MISO) runs the wholesale market. The Public Service Commission of Wisconsin (PSC) approves tariffs and large customer contracts.

Related News See all

Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read AT&T Partners with AWS and Amazon Leo
AT&T Partners with AWS and Amazon Leo

AT&T Partners with AWS and Amazon Leo

February 05, 2026 AT&T

US telecoms firm AT&T is partnering with Amazon’s cloud and satellite units. The former will move more workloads to the cloud and utilize Amazon’s satellite fleet, while the cloud provider will benefit from new fiber connectivity between its data centers."This collaboration with AWS...

Read more
Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.