The Des Moines Data Center Map Has 13 Sites

Search Des Moines's Data Centers


Des Moines Data Center List

Apple Waukee IA
Street Address
Interested in this information? Contact us

Waukee, IA 50263
  • ??? NN
    Interested in this information? Contact us
    Megawatts
  • Utility: MidAmerican Energy

The 400,000 sqft data center will not be complete until 2020. Apple plans to build two "state-of-the-art" data centers on a 2,000-acre portion of a 3,500-acre site Waukee annexed in June

Connect DSM
666 Walnut Street Des Moines
Iowa 50309
  • 6,000 Gross SqFt
  • ??? NN
    Interested in this information? Contact us
    Megawatts
Consolidated Des Moines
400 Locust Street
Des Moines, IA 50309
  • ??? NN
    Interested in this information? Contact us
    Megawatts
Facebook Altoona Iowa
Street Address
Interested in this information? Contact us

Altoona, IA 50009
  • ??? NN
    Interested in this information? Contact us
    Megawatts
  • 1,440,000 Building SqFt

Phase 1: 476,000 square-foot, $300 million building built in 2014
Phase 2: 468,000 square feet
Phase 3: 496,000 square feet
Phase 4: The fourth building will be a 'cold storage' facility. SqFt TBD.

Global Reach Ames
2321 N Loop Drive
Ames, IA 50010

Des Monies as a Data Center location:

Not an obvious location for dataenters, Des Moines is a good location nonetheless. Lower power rates and low risk of natural disasters make it a good choice for a central US deployment. Carrier neutral colocation providers consider it a tertiary metro with only LightEdge, OneNeck and InfoBunker leasing colo space.

Demographics

Des Monies is the capital city of Iowa, the state which casts the first lot for the US President. The city has 216,000 people, however, the surrounding MSA has 635,000 residents.

Commercial Power Rates in Iowa

Electric power is economical in Des Moines with the average commercial electricity rate at 6.76¢/kWh. Iowa also doesn't apply sales tax to power use. While coal is the predominant energy source, wind is becoming a larger source (27.5% in 2013). In 2013, MidAmeria Energy added 138 MegaWatts of Wind generating capacity in conjunction with the Facebook Altoona data center announcement.





Largest Data Centers in Des Moines

Gross SqFt Gross SqFt Power (MW) Power (MW)
Facebook Altoona Iowa 117.00
Microsoft Des Moines Project Alluvion 100.00
Microsoft Des Moines Project Osmium 75.00
Microsoft Des Moines 50.00
Apple Waukee IA 30.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}


In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other ...
Facility Outside Des Moines Will Run on 100 Percent Renewable Energy
This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.
The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines

Satellite image of MSFT's campus as of 2022
Posted in Microsoft Des Moines Project Alluvion
rendering of the Osmium campus
Posted in Microsoft Des Moines Project Osmium
In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other ...
Apple Iowa Data Center Aerial View
Posted in Apple Waukee IA

In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other Apple services. Like all Apple data centers, the new facility will run entirely on renewable energy from day one.

Source: https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/
Facility Outside Des Moines Will Run on 100 Percent Renewable Energy
Apple Waukee Iowa-Front of the Building
Posted in Apple Waukee IA

Facility Outside Des Moines Will Run on 100 Percent Renewable Energy

Source: https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/
Satellite view of the Grant Ave campus as of 2022
Posted in Microsoft Des Moines
Facebook Facility at 100 Share Way NW
Posted in Facebook Altoona Iowa
Source: Des Moines Register
This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.
Original Artwork
Posted in Facebook Altoona Iowa

This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.

Source: Facebook
The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines
Altoona Artwork
Posted in Facebook Altoona Iowa

The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines

Source: Facebook
2017 Rendering of the first 5 Buildings on the Facebook Iowa Campus
Posted in Facebook Altoona Iowa
Source: Facebook
Data Center Floor at FB Iowa
Posted in Facebook Altoona Iowa