Level3 Middlesbrough

Latest Podcast Zetland Rd
Decommissioned
Facility permanently shut down and decommissioned
Operated by:

Level3 Middlesbrough

Map and Nearby Locations

Zetland Rd
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Level3 Middlesbrough

Distance Site About
3.87 miles Latos: Stockton DC02
The development, situated on a 1.85-acre vacant site within the Preston Farm Industrial Estate, will comprise two buildings (DC 01 and 02) totaling 1,725 sqm (18,595 sq ft).
3.91 miles Latos: Stockton DC01
UK data center firm Latos is planning a new "Neura Data Centre" campus in Stockton-on-Tees, just outside Middlesbrough.
4.12 miles Sembcorp: Teesside Campus
The Sembcorp Wilton International Data Centre is a planned high-performance computing campus located on a 38-acre brownfield site at the Wilton International industrial park in Teesside, North East England.
4.82 miles DXC: Wynyard Park Billingham
The DXC Wynyard Data Center, often called the "Northern Data Center," is a massive 360,000 sq. ft. facility in Stockton-on-Tees that stands as a landmark of sustainable engineering.
4.87 miles Wilton Data Center Campus
Wilton Data Centre is building a data center complex on a 32-acre plot at the Wilton International Park outside Middlesbrough in North Yorkshire.
5.02 miles Wilton DC2
This Building is a part of Wilton Data Centre Campus. DC building (DC Building 2) would have a building footprint of 47,250 sqm (508,600 sq ft).
5.18 miles Ridge OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.46 miles RidgeInterested in this information?Contact us
13.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.15 miles Energy Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read SWI Compute Launches With 3.6GW to Build NVIDIA AI Factories in Europe
SWI Compute [launched on Oct. 26](https://www.prnewswire.com/news-releases/swi-compute-emerges-from-stealth-to-turn-gigawatts-of-power-into-nvidia-ai-factories-starting-in-europe-302918810.html) to...

SWI Compute Launches With 3.6GW to Build NVIDIA AI Factories in Europe

October 26, 2026 SWI Group

SWI Compute launched on Oct. 26 to build and operate NVIDIA AI factories, starting with a 30MW site in the UK. The company is part of SWI Group, the Euronext Amsterdam-listed investment group that has secured 3.6GW of power capacity across Europe and the US. SWI Group supplies the land, grid...

Read more
Read Evolution Power Proposes 1GW Data Center And 1.3GW Solar Farm In Norfolk
[Evolution Power Limited](https://www.evolutionpower.co.uk) has opened a community consultation on [Longmarsh Green Energy](https://longmarshgreenenergy.co.uk), a proposal pairing a data center cam...

Evolution Power Proposes 1GW Data Center And 1.3GW Solar Farm In Norfolk

October 20, 2026 United Kingdom

Evolution Power Limited has opened a community consultation on Longmarsh Green Energy, a proposal pairing a data center campus that would draw up to 1GW with a 1.3GW solar farm and battery storage across about 4,695 acres of farmland near King's Lynn in west Norfolk. The developer says the...

Read more
Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read TalkTalk to cut hundreds of jobs in bid to save £120m
TalkTalk to cut hundreds of jobs in bid to save £120m

TalkTalk to cut hundreds of jobs in bid to save £120m

January 01, 2025 England

TalkTalk is set to cut hundreds of jobs as the struggling ISP looks to save £120 million ($150m), detailing the plans during an investor meeting in December. TalkTalk has already kicked off a redundancy consultation, ahead of plans to cut around 130 jobs at its Salford consumer division.Further...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.