Glasgow Data Center Market

Latest Podcast

The Glasgow data center market is located in the country of Scotland within EMEA. Glasgow has 13 facilities.

The top providers in Glasgow are DataVita (2 sites) and Asanti with 1 facility . The most popular facilities are iomart DC1 Glasgow and DataVita: Lanarkshire DV1.

Read More

Market Facts

Glasgow Data Center Map

Glasgow Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Glasgow

Largest Providers in Glasgow

DataVita
Site
Power
Operational
2
12.4
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Asanti
Site
Power
Operational
1
1.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
iomart
Site
Power
Operational
1
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Apatura
Site
Power
Operational
0
0.0
Construction
0
Planned
7
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Glasgow

Location About Total SqFt Power (MW)
DataVita: Lanarkshire DV1
DV1, opened in 2016, stands as Scotland's premier, Uptime Institute-certified purpose-built co-lo...
NN Request Dataset NN Request Dataset
Asanti: Hamilton
Located in the Hamilton International Technology Park, this facility provides 5,000 sq ft of rais...
NN Request Dataset
DataVita: Glasgow DV2
The purpose-built, Tier III-designed DV2 is located in the heart of Glasgow's business district, ...
NN Request Dataset NN Request Dataset
Apatura: Larbert AI DC
A new AI data center campus is planned for Plean, Scotland, by UK renewables developer Apatura. T...
Apatura: Wishaw, Motherwell
Apatura plans a significant £3.9 billion ($5.34bn) investment to develop a data center campus and...

About This Metro

The Glasgow metropolitan area (MSA) has 1.8 million residents. The cities that make up the MSA are: Glasgow (1,228,000), East Kilbride (74,000), Greenock (60,000), Motherwell/Wishaw (59,000), Hamilton (53,000), Cumbernauld (50,000), Kilmarnock (46,000), Dumbarton (45,000) Source: Wikipedia

Related News See all

Read DataVita Files Plans For Third Data Center At North Lanarkshire Campus, Scotland
Scottish data center operator DataVita has submitted plans for a new building at its Chapelhall campus in North Lanarkshire. DataVita said it has revised its plans for the data center, known as DV4...

DataVita Files Plans For Third Data Center At North Lanarkshire Campus, Scotland

September 03, 2026 DataVita

Scottish data center operator DataVita has submitted plans for a new building at its Chapelhall campus in North Lanarkshire. DataVita said it has revised its plans for the data center, known as DV4, following four public consultation events held prior to the application being submitted. It...

Read more
Read DataVita Secures £300m Debt Facility for North Lanarkshire Data Center Expansion
UK data center operator DataVita has secured new funding to support its expansion in Scotland. The company announced this week that it had secured a £300 million ($406.1m) debt facility to expand i...

DataVita Secures £300m Debt Facility for North Lanarkshire Data Center Expansion

August 18, 2026 DataVita

UK data center operator DataVita has secured new funding to support its expansion in Scotland. The company announced this week that it had secured a £300 million ($406.1m) debt facility to expand its existing DV1 data center and build a new facility, DV3, in the North Lanarkshire AI Growth Zone....

Read more
Read Apatura Changes Location of Planned 300MW Facility
Apatura Changes Location of Planned 300MW Facility

Apatura Changes Location of Planned 300MW Facility

October 21, 2025 Apatura

A renewables firm planning a 300MW AI data center campus in Scotland is now targeting a new site three miles from its original planned location. This week, the firm detailed its intention to instead house the campus on land at Glenbervie Business Centre in Larbert, three miles from Plean, lodging...

Read more
Read Vertiv and Chemours Score DataVolt Deals
Vertiv and Chemours Score DataVolt Deals

Vertiv and Chemours Score DataVolt Deals

May 22, 2025 DataVita

Saudi Arabian data center company DataVolt has signed supplier contracts with Vertiv and Chemours. Vertiv's EMEA president, Karsten Winther, said that the company had signed a 'Technical Cooperation Agreement' with DataVolt "to advance next-generation data center innovation in Saudi Arabia and...

Read more
Read DataVolt Signs $20bn Deal with Supermicro
DataVolt Signs $20bn Deal with Supermicro

DataVolt Signs $20bn Deal with Supermicro

May 20, 2025 DataVita

Saudi Arabian data center company DataVolt has signed a $20 billion agreement with Super Micro Computer (Supermicro) to see Supermicro delivering GPU platforms and rack systems to DataVolt's "hyperscale AI campuses" in Saudi Arabia and the US.“We are thrilled to partner with Supermicro and build...

Read more
Read DataVita adopts HVO as fuel in Glasgow facility
DataVita adopts HVO as fuel in Glasgow facility

DataVita adopts HVO as fuel in Glasgow facility

October 13, 2023 DataVita

UK data center operator DataVita has adopted hydrotreated vegetable oil (HVO) as its diesel alternative to reduce its carbon footprint and green its backup operations. The company now uses HVO as fuel for backup generators at its facility in Glasgow, Scotland. "Today marks a significant...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?