Lumen McAllen 1

Latest Podcast 906 Beech Avenue
Operational
Fully operational facility
Operated by:

Lumen McAllen 1

Year Built: 2000
░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

906 Beech Avenue
Lumen Technologies Sites
Nearby Facilities

Lumen McAllen 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Lumen McAllen 1

Distance Site About
0.03 miles McAllen Carrier POP: 900 1/2 Beech Ave
A carrier-neutral network point of presence on Beech Avenue in McAllen, Texas, near the city's cross-border carrier cluster.
0.14 miles AT&T: 721 Beech Ave, McAllen
AT&T's main central office in McAllen, Texas, on Beech Avenue near the city's carrier cluster.
0.17 miles Verizon: 701 Beech Ave, McAllen
Verizon Business's network point of presence on Beech Avenue in McAllen, Texas, beside AT&T's central office.
0.22 miles Smartcom: McAllen
Smartcom Telephone runs its switch and a small colocation facility on Beech Avenue in McAllen, Texas.
0.25 miles MDC McAllen Chase
MDC Data Centers' MCA1 suite in McAllen's Chase Tower carrier hotel, the original home of MDC's cross-border interconnection.
0.26 miles 1547: McAllen MCTX1
The Chase Tower is McAllen's main carrier hotel, a 17-story tower owned by 1547 Critical Systems Realty with more than 45 carriers, two meet-me rooms and the MCT-IX internet exchange.
0.43 miles MDC McAllen Annex
1.94 miles T-Mobile: McAllen
T-Mobile's switching center on E Upas Avenue in McAllen, Texas, serves the Rio Grande Valley.
15.13 miles Verizon: 521 S Missouri Ave, Weslaco
Verizon's telephone central office in Weslaco, Texas, a former GTE exchange.

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read SpaceX Proposes $24B Gas Plant And Super-Compute Facility At Starbase
The City of Starbase will consider a property tax abatement for a [SpaceX](https://baxtel.com/data-centers/spacex) gas-fired power plant and super-compute facility at its Dec. 9 meeting. SpaceX pro...

SpaceX Proposes $24B Gas Plant And Super-Compute Facility At Starbase

November 18, 2026 SpaceX

The City of Starbase will consider a property tax abatement for a SpaceX gas-fired power plant and super-compute facility at its Dec. 9 meeting. SpaceX proposes to build, own and operate the project on a 444-acre tract east of Brownsville, Texas, with an estimated $24 billion investment for the...

Read more
Read SBA Edge Opens Corpus Christi Edge Data Center And Fiber Exchange
SBA Edge has opened a multi-tenant edge data center and fiber interconnection exchange in downtown Corpus Christi, Texas. Jared Benson, director of strategic edge infrastructure at SBA, [announced ...

SBA Edge Opens Corpus Christi Edge Data Center And Fiber Exchange

July 21, 2026 SBA Edge: Corpus Christi

SBA Edge has opened a multi-tenant edge data center and fiber interconnection exchange in downtown Corpus Christi, Texas. Jared Benson, director of strategic edge infrastructure at SBA, announced the launch in July, and the carrier-neutral facility's meet-me room supports data speeds up to...

Read more
Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data,...

Read more
Read US Defense Information Systems Agency awards $110 million contract to Lumen
US Defense Information Systems Agency awards $110 million contract to Lumen

US Defense Information Systems Agency awards $110 million contract to Lumen

November 10, 2023 Lumen Technologies

The US Defense Information Systems Agency has awarded Lumen Technologies a $110 million contract to provide mission-critical network services to the US Department of Defense (DoD). This contract has a timeline of five years, from November 30, 2023, through September 30, 2028. This contract is an...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.