Lumen Anaheim 1

Latest Podcast
2463 West La Palma Avenue
Operational
Fully operational facility
Operated by:

Lumen Anaheim 1

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Former Global Crossing facility.

Map and Nearby Locations:

2463 West La Palma Avenue
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen Anaheim 1

Distance Site About
0.00 miles SMH Colocation
3.25 miles OC Online Anaheim
3.25 miles Cogent Orange County
3.84 miles Cogent: 16680 Valley View
12.22 miles Verizon: Santa Ana
13.15 miles Lumen Tustin 1
13.19 miles Centersquare: Irvine OC2
13.21 miles Hosting.com Irvine
This is a former Hosting.com facility that was acquired from Ntirety in 2023.
13.27 miles DataBank SNA1 17222 Von Karman
13.36 miles DataBank SNA2 17400 Von Karman
a former zColo facility
13.72 miles Centersquare: Irvine LAX2
Located just 1.9 miles from the John Wayne Airport (SNA), in the heart of Orange County, Centersquare Irvine is a cloud-enabled data center with 150,000 square foot of space.
13.77 miles Alchemy Irvine
15.45 miles DigiCo: Los Angeles LAX2
DigiCo’s LAX2 data center in Monterey Park, 16 km east of downtown Los Angeles, is a Tier III-ready hyperscale facility now moving through power-allocation and permitting ahead of a 2027-2028 commercial launch.
15.56 miles DigiCo: Los Angeles LAX1
A proposal by Australian firm HMC Capital to develop a 250,000 sq ft data center in Monterey Park, California, has been delayed following intense local opposition.
17.81 miles Goodman: Los Angeles
The 5.6-acre facility, situated on the former Farmer John site, is slated to be power shell-ready by mid-2026.
17.81 miles DataBank: Los Angeles
DataBank and Goodman Group’s LAX2 project is a 32MW AI-ready data center in Vernon, California, developed through a 50/50 joint venture at 3094 E. Vernon Avenue, with 140,417 raised square feet and phased delivery beginning with 6MW in December 2026 and the balance through September 2027.
18.24 miles Digital Realty: Vernon, CA
US data center operator Digital Realty acquired a 5.4-acre property in the Vernon area of Los Angeles, California, for approximately $49 million in 2025.
18.24 miles Prime Vernon
Prime Data Centers' three-story, 261,000-square-foot data center is located in Vernon, California.
19.11 miles Equinix Los Angeles LA7

Lumen Anaheim 1 Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?