|
1.96 miles
|
EdgeConnex Minneapolis
|
|
|
2.01 miles
|
US Signal: MN01 Minneapolis
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
5.28 miles
|
Databank Minneapolis Edina MSP1
|
|
|
5.28 miles
|
Consolidated Edina
|
|
|
8.68 miles
|
G42: Minneapolis
|
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
|
8.68 miles
|
Cloud Capital: Minneapolis CBD
|
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
|
8.78 miles
|
Lumen Minneapolis 1
|
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
|
8.84 miles
|
Centersquare: Minneapolis MP2
|
|
|
9.11 miles
|
Verizon: 1200 Washington
|
Former XO Communications site
|
|
9.13 miles
|
Cogent: 250 Marquette
|
|
|
9.15 miles
|
Verizon: 250 Marquette
|
The site is a previous XO Communications facility
|
|
9.30 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
|
9.32 miles
|
Lumen Minneapolis 2
|
|
|
9.32 miles
|
DataBank Minneapolis MSP4
|
In 2020, DataBank acquired the facility from Zayo.
|
|
9.32 miles
|
Level3 Minneapolis (511 11th)
|
|
|
9.32 miles
|
Cologix: Minnesota Technology Center
|
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
|
9.33 miles
|
511 Building - Minnesota Technology Center
|
|
|
9.51 miles
|
Flexential Minneapolis
|
|
|
12.40 miles
|
UnitedHealth Chaska
|
|
|
12.44 miles
|
CloudHQ: Chaska MN
|
The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.
|
|
12.49 miles
|
US Bank Chaska (Stream DC2)
|
|
|
12.53 miles
|
Lightedge: Minneapolis
|
|
|
12.55 miles
|
Stream Minneapolis
|
Stream Data Centers sold the facility as part of a corporate transaction where Apollo Global Management acquired a majority stake in the company.
|
|
13.02 miles
|
Swervo: Eagan
|
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
|
13.03 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
14.15 miles
|
H5 Minneapolis
|
|
|
14.21 miles
|
DataBank Minneapolis Eagan MSP2
|
|
|
15.95 miles
|
Centra: Minneapolis
|
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
|
16.27 miles
|
Connect Data Centers: Eagan, MN
|
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
|
16.51 miles
|
US Signal: Saint Paul
|
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
|
16.65 miles
|
DataBank Brooklyn Park MSP3
|
|
|
16.85 miles
|
Connect Data Centers: Apple Valley, MN
|
Following a year-long application process, Apple Valley city officials have rejected Oppidan and Rockport LLC’s proposal for a massive data center campus outside Minneapolis.
|
|
18.41 miles
|
Edged Energy: MSP01 Expansion
|
|
|
18.41 miles
|
Edged Energy: Minneapolis MSP01
|
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
|
18.94 miles
|
QLevr: Inver Grove Heights
|
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|