Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 1.50 miles | Simply Bits-Tucson |
Simply Bits operates Simply Bits DC1, a 10,570 sq ft data center located in Tucson.
|
| 3.42 miles | FirstTelecom: Tucson | |
| 3.68 miles | Ark: Tucson |
|
| 3.72 miles | DakotaPros: Tucson |
DakotaPro employs 20+ people in Southern Arizona and operates a 14,400-square foot colocation facility and data center.
|
| 4.77 miles | TECfusions: Tucson, AZ |
Sat on eight acres in Pima County, the 133,450 sq ft (12,400 sqm) building offers 40,790 sq ft (3,790 sqm) of raised floor.
|
| 4.77 miles | Aphorio Carter: Tucson, AZ |
Located on an eight-acre site in Pima County, Arizona, the 133,450 sq ft (12,400 sqm) facility includes 40,790 sq ft (3,790 sqm) of raised floor space and is fully leased to TECfusions.
|
| 16.00 miles | Beale: Project Blue |
Project Blue, a massive 630 MW data center campus proposed by Beale Infrastructure and linked to Amazon Web Services (AWS), was withdrawn due to water constraints, despite a proposed investment of $3.6 billion.
|
| 16.06 miles | Hyperscale Data Center Request Dataset |
AWS’s proposed 630 MW campus was withdrawn over water constraints, despite its $3.6B valuation.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
August 08, 2025
Tucson
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas