Cincinnati Data Center Market Overview
Cincinnati is a mid-sized data center market in southwest Ohio, smaller than Columbus to the northeast. The local phone company built its first generation of colocation, and the operator it created still anchors the market. Most capacity sits downtown or in the northern suburbs between Blue Ash and Lebanon. Since 2025 the market has drawn hyperscale development to Butler County, along with strong local resistance.
History
The market grew out of Cincinnati Bell, the region's phone company. Its 1931 exchange on West 7th Street still serves as the main wire center, and the building next door became the city's carrier hotel. Cincinnati Bell later opened data centers in Blue Ash, Mason, Hamilton, Lebanon and Florence, Kentucky.
In 2010 Cincinnati Bell bought CyrusOne, a Texas data center operator, and folded its own facilities into that brand. CyrusOne went public in January 2013, and Cincinnati Bell sold down its stake over the next few years. KKR and Global Infrastructure Partners took CyrusOne private in March 2022. Macquarie bought Cincinnati Bell in 2021, and the phone company became altafiber the next year.
Other operators arrived as the market matured. Peak 10 opened a West Chester data center in 2008 and added a second building in 2016; it now operates as Flexential. H5 Data Centers bought a downtown carrier building in 2017 and a former bank data center in 2021. DartPoints entered through its 2021 purchase of Immedion. In 2022 Encore Technologies, a local IT firm, bought the Blue Ash data center that Procter & Gamble built in 1989.
Data Centers in Cincinnati Today
Downtown remains the interconnection hub. CyrusOne's 7th Street carrier hotel sits beside altafiber's main exchange, and H5, DartPoints, Lumen, Cogent and Verizon run smaller sites nearby. DartPoints is building a new high-density data hall in its downtown building. Cincinnati has no internet exchange of its own; regional exchanges reach the city through remote nodes.
The suburbs hold most of the larger halls. CyrusOne now markets three local campuses: downtown, Lebanon and Florence in Northern Kentucky. It markets Lebanon as a build-to-suit campus with a second facility planned, and it has sold or left its older suburban suites. Flexential, Encore Technologies and CenterGrid serve enterprise colocation in West Chester, Blue Ash, Norwood and Hamilton.
Hyperscale development centers on Trenton in Butler County. Prologis is building Project Mila, a four-building campus for Amazon Web Services, with the first building due in 2028. A separate Amazon plan for about 600 acres south of Trenton stalled in 2026. Amazon's main Ohio cloud region sits around Columbus, in AWS US East (Ohio). Other large proposals near the Ohio River and in Brown County face moratoria or opposition.
Why Build Data Centers in Cincinnati?
-
Central location. The metro sits on the I-71 and I-75 corridors, within a day's drive of much of the US population. Columbus, Dayton, Indianapolis and Louisville are all within two hours.
-
Carrier density. The downtown carrier hotel and the adjacent altafiber exchange concentrate long-haul and metro fiber in one block.
-
Transmission corridors. Duke Energy's 345 kV network and gas-fired peaking plants in Butler County give large sites a path to the grid.
-
Competitive power supply. Ohio's deregulated retail market lets large users buy electricity from competitive suppliers rather than the distribution utility.
-
Local incentives. Cities can grant long property-tax abatements, as Trenton did for Project Mila in 2026.
What Limits Data Center Growth in Cincinnati?
-
Local moratoria. Butler County paused data centers in six townships in June 2026, and St. Clair, Pierce and St. Bernard adopted their own pauses. Cincinnati placed an interim review overlay on new data centers through February 2027.
-
Voter bans. In November 2026 Trenton voters approved a charter amendment that bars new data centers above 25 MW inside city limits.
-
Power delivery. Municipal utilities cannot easily serve large loads. In 2026 the City of Hamilton found its utility needed at least two years to power a large campus, and that project ended.
-
State incentives on hold. Ohio stopped taking new data center sales-tax exemption requests in May 2026 while the legislature studies the sector.
-
Aging stock. Much of the market's colocation sits in older suites inside office buildings, and several have closed.
Cincinnati Data Center Trends
-
Hyperscale through developers. Large campuses arrive as developer-built powered shells for a cloud tenant rather than as owner-built sites.
-
Legacy consolidation. CyrusOne has exited small suburban suites, and local owners have bought several former telco and enterprise data centers.
-
High-density retrofits. Downtown operators are adding power and high-density halls inside existing buildings.
-
Former power plant land. Retired coal plants on the Ohio River leave transmission behind, and developers have started pitching campuses on nearby land.
-
Ballot-box resistance. Ohio voters approved data center bans or limits in several communities in November 2026.
Power and Policy in Cincinnati
The Cincinnati area sits in the PJM Interconnection, in the Duke Energy Ohio zone. Duke Energy Ohio serves most of the metro, while Hamilton and Lebanon run municipal electric utilities and Duke Energy Kentucky serves Northern Kentucky. The Public Utilities Commission of Ohio (PUCO) regulates rates, and the Ohio Power Siting Board approves major substations and transmission lines. In 2026 Duke Energy Ohio filed a data center tariff, Rate DC, for loads of 25 MW or more; PUCO has not yet ruled. Ohio's House Bill 15 took effect in August 2025 and eased on-site generation for large users.