Lumen South Brunswick 1

Latest Podcast 4260 US Route 1 North
Operational
Fully operational facility
Operated by:

Lumen South Brunswick 1

Map and Nearby Locations

4260 US Route 1 North
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen South Brunswick 1

Distance Site About
1.33 miles DataBridge: Princeton NJ
AGILE Princeton is conveniently located, 45 minutes via car or train from both New York & Philadelphia and just 5 miles from the Princeton Junction train station.
2.37 miles Princeton Nurseries Data Center
The owner of the Princeton Nurseries site in New Jersey is seeking to develop a 340,985 sq ft (31,678 sqm) data center. This data center is part of a larger redevelopment plan for the 160-acre plot.
6.70 miles QTS: East Windsor 1 DC2
The proposed expansion in East Windsor involves a $600 million investment by QTS Data Centers to build a second, state-of-the-art facility on its existing Princeton-Hightstown Road campus.
6.80 miles QTS: East Windsor 1 DC1
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
11.26 miles BNY Mellon Somerset
11.40 miles CyrusOne Somerset
Phase 1 is 50,000 gross sqft at full build out the facility will have 330,00 gross sqft. The total building's sqft is 430,000sqft and sits on 22.5 acres
11.54 miles Morgan Stanley Somerset
11.62 miles Rackspace Belmont NYC2
11.62 miles Rackspace: Somerset NYC2
11.87 miles Rackspace Somerset NYC1
1.2 MW UPS Power Capacity N+N Redundancy
12.29 miles Chirisa: Piscataway
Chirisa Technology Parks (CTP) is growing its New Jersey data center footprint. The company has purchased a substantial property in Piscataway, with plans to develop a major data center facility starting in 2024.
12.33 miles Digital Fortress Piscataway
13.24 miles QTS: Piscataway 2
QTS planned for the expansion in 2022 with Additional 2 story, 50,000 sq. ft of space.
13.29 miles DataBank Piscataway EWR2
13.32 miles QTS Piscataway
The site was acquired from Dupont Fabros in June 2016 for $125 million. It was previously known as "DuPont Fabros NJ1" when owned by Dupont.
13.38 miles Open Data Centers Piscataway
13.46 miles Centersquare: Piscataway EWR3-B
The Piscataway facility was formerly known as NJ4.
13.46 miles 365 S Randolphville - Digital Realty
13.56 miles 1115 Centennial Ave: Digital Realty
13.66 miles 3 Corporate - Digital Realty
3 Corporate Place contains approximately 135,000 square feet of state-of-the-art data center space and 25,000 square feet of office space. It offers 26 MW of utility power capacity.
13.66 miles Centersquare: Piscataway EWR3-A
14.37 miles 365 Bridgewater NJ
The New Jersey facility is located in Bridgewater, NJ, just 40 miles west of New York City along the fiber-rich “Magic Mile.” The 25,565-square-foot data center offers 2.3MW of capacity.
14.72 miles Verizon Wireless Branchburg
15.19 miles LexusNexis Edison NJ
15.19 miles Iron Mountain New Jersey
Iron Mountain's site is in Edison, NJ. Iron Mountian acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 IO sites
18.02 miles Northpoint: Keystone Trade Campus
NorthPoint Development has received approval to build a 2 million-square-foot data center campus within its Keystone Trade Center in Bucks County.
18.02 miles Hyperscale Data Center Request Dataset
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.

Lumen South Brunswick 1 Data Center Photos See all

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
115
Markets
279MW
Megawatts

News See all

Read New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff
New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other rate...

New Jersey Lawmakers Approve Bill Creating Large Load Data Center Tariff

July 03, 2026 New Jersey

New Jersey lawmakers have passed a bill directing the state’s Board of Public Utilities to create a dedicated tariff for data centers with capacities of 50MW or more, aimed at protecting other ratepayers from rising costs linked to new developments. The legislation, S731, replaces an earlier...

Read more
Read Local Officials Reject Proposed Data Center in New Brunswick, New Jersey
Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

Local Officials Reject Proposed Data Center in New Brunswick, New Jersey

February 21, 2026 New Jersey

Local authorities in New Brunswick, New Jersey, voted on Wednesday against allowing the construction of a data center on a plot of land slated for redevelopment, instead requiring that a park be built on the site. The New Brunswick City Council was reviewing a proposal for the Jersey-Sandford...

Read more
Read New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers
New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

New Jersey Senate Advances Bill to Establish New Rate Class for Data Centers

January 13, 2026 New Jersey

The New Jersey Senate has advanced a bill that would create new tariff classes for “large load” data centers in an effort to protect ratepayers in the state from cost increases.The bill, cosponsored by ten Democrat lawmakers, would require public electrical utilities in the state to submit...

Read more
Read Stack Overflow Fully Exits Data Centers
Stack Overflow Fully Exits Data Centers

Stack Overflow Fully Exits Data Centers

January 06, 2026 New Jersey

Stack Overflow, a question-and-answer website for computer programmers, has officially exited its data center in New Jersey as part of its cloud migration effort. Stack noted that for the past 16 years it had been operating out of a physical data center in which the site reliability engineer...

Read more
Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?