The Nashville data center market is located in the state of Tennessee within Americas. Nashville has 21 facilities with 2,160,440 sqft and 166 megawatts.
The top providers in Nashville are Meta (4 sites) and Csquare with 1 facility . The most popular facilities are EdgeConneX Nashville and H5: Nashville 2.
| Name | Company | Size | Status | Type | |
|---|---|---|---|---|---|
|
EdgeConneX Nashville | EdgeConneX | Extra Small | Operational | Carrier-Neutral |
|
H5: Nashville 2 | H5 Data Centers | Extra Small | Construction, Operational | Carrier-Neutral |
|
H5 Nashville | H5 Data Centers | Decommissioned | Carrier-Neutral | |
|
Lumen Nashville 2 | Lumen Technologies | Extra Small | Operational | Carrier |
|
Lumen Nashville 1 | Lumen Technologies | Extra Small | Operational | Carrier |
|
Flexential Brentwood | Flexential | Extra Small | Operational | Carrier-Neutral |
|
Flexential Cool Springs | Flexential | Small | Operational | Carrier-Neutral |
|
Flexential Franklin TN | Flexential | Small | Operational | Carrier-Neutral |
|
Tierpoint Nashville NSH | TierPoint | Extra Small | Operational | Carrier-Neutral |
|
Verizon: 101 Molloy | Verizon Enterprise | Extra Small | Operational | Carrier |
|
Plus | Meta | Large | Operational | Hyperscale |
|
Park Three | Meta | Large | Operational | Hyperscale |
|
Edge Campus | Meta | Large | Operational | Hyperscale |
|
Valley Plus | Meta | Medium | Planned | Hyperscale |
|
Central Plaza | Meta | Large | Construction | Hyperscale |
|
Nexus Group Nashville | The Nexus Group | Operational | Carrier-Neutral | |
|
Compass Franklin I | Compass Datacenters | Small | Operational | Carrier-Neutral |
|
Centersquare: Gallatin (NAS) | Csquare | Small | Land Bank, Operational | Carrier-Neutral |
|
Mapletree: 402 Franklin | Mapletree Redwood Data Centre Trust | Small | Operational | Real Estate |
|
RadiusDC: Nashville, TN | RadiusDC | Small | Construction | Carrier-Neutral |
|
Fisk University: Nashville, TN | Fisk University | Medium | Planned | Education |
| Location | Total SqFt | Gross SqFt | Power (MW) |
|---|---|---|---|
| South Ridge |
485,000 SqFt |
NN Request Dataset | |
| Prime Center |
500,000 SqFt |
NN Request Dataset | |
| Alpha |
485,000 SqFt |
NN Request Dataset | |
| Mapletree: 402 Franklin |
347,515 SqFt |
NN Request Dataset | |
| Compass Franklin I | NN Request Dataset |
| Location | Building SqFt | Power (MW) | Estimated Launch |
|---|---|---|---|
| Tower Alpha | 278,000 SqFt | 40 Megawatts | Q1 2027 |
| RadiusDC: Nashville, TN | 102,500 SqFt | 12 Megawatts | Q4 2026 |
| Centersquare: Gallatin (NAS) | SqFt | 0 Megawatts | Q1 2026 |