Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.20 miles | euNetworks Stuttgart | |
| 1.03 miles | nexspace: Sternhöhe, Stuttgart |
Scheduled to launch in the summer of 2026, the nexspace data center at Campus Sternhöhe is a high-security underground facility designed to meet the booming demand for AI and real-time processing in Stuttgart's high-tech corridor.
|
| 1.96 miles | nLighten Stuttgart STR1 | |
| 1.96 miles | ITENOS Stuttgart | |
| 3.26 miles | AtlasEdge: Stuttgart GRP10 |
|
| 4.56 miles | AtlasEdge: NB8 |
The data center covers an area of approximately 1600 square meters and is located in the heart of Stuttgart.
|
| 5.01 miles | University of Stuttgart: HLRS III |
Construction is officially underway for HLRS III, a state-of-the-art supercomputing data center at the University of Stuttgart.
|
| 9.31 miles | AtlasEdge: Böblingen |
AtlasEdge's STR001 data center, located in the Böblingen area of Stuttgart, Germany, is a modular facility spanning 10,000 square meters (107,640 sq ft).
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas