Level3 Bracknell

Latest Podcast
6 Kiln Ln
Operational
Fully operational facility
Operated by:

Level3 Bracknell

Map and Nearby Locations:

6 Kiln Ln
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Level3 Bracknell

Distance Site About
0.24 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
0.44 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
0.44 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
0.45 miles Hyperscale Data Center Request Dataset
0.81 miles Hyperscale Data Center Request Dataset
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
5.45 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
5.60 miles Gravity Edge: London LDN1
Located in Camberley, Gravity Edge LDN1 is a mission-critical data center flagship that bridges the gap between traditional enterprise hosting and the high-density demands of modern AI.
6.39 miles Pulsant: Maidenhead SE-2
7.62 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
7.64 miles Ark: Longcross
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
8.07 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
8.23 miles Pulsant: Reading SE-4
8.46 miles Asanti: Farnborough
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
9.02 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
9.10 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
9.17 miles CyrusOne LON5
9.26 miles Equinix LD11x
9.28 miles Segro: Slough 2
This planned facility will be part of Segro's London Slough Campus.
9.31 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
9.31 miles China Mobile Slough
9.32 miles Segro: London Slough Campus
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
9.33 miles Pulsant: Reading SE-3
9.35 miles Ark: Cody Park
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
9.35 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
9.35 miles VIRTUS London 11
9.36 miles Amito Reading
9.38 miles Datum FRN1
9.40 miles Equinix LD6
9.41 miles Digital Realty: LHR27
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
9.42 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
9.42 miles Digital Realty: LHR26
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
9.44 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
9.44 miles GTR: Slough 3
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
9.45 miles GTR: Slough 2
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
9.46 miles GTR: Slough
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
9.49 miles Equinix LD7
9.51 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
9.51 miles Equinix LD14
9.51 miles NTT Slough 2
9.52 miles Equinix LD12
9.52 miles VIRTUS LONDON9
9.53 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
9.55 miles Iron Mountain London LON-2
9.55 miles Equinix LD10
9.56 miles Logicalis Slough
9.57 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
9.57 miles Iron Mountain: LON3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
9.57 miles Equinix LD13x
9.58 miles GoDaddy Slough (HEG)
9.59 miles VIRTUS LONDON10
9.60 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
9.65 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
9.67 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
9.68 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
9.77 miles Lumen Slough
9.84 miles Digital Realty Woking
9.84 miles CyrusOne London Woking
9.85 miles Gravity Edge: London LDN2
9.89 miles Stellanor: Woking TC3
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
9.89 miles NaviSite Woking
10.33 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
10.40 miles Yondr: Slough Campus
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
10.47 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
10.53 miles Yondr: Slough 3
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
11.30 miles Tritax: London Slough (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
11.31 miles Tritax: London Slough (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
12.39 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
12.42 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
12.45 miles Thorney: Iver DC-F
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
12.58 miles Segro: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
12.59 miles Thorney Lane LLP: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
12.63 miles Thorney: Iver DC-B
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
12.65 miles Thorney: Iver DC-C
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
12.87 miles Hyperscale Data Center Request Dataset
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
13.04 miles Stellanor: Byfleet
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
13.08 miles QuickHostUK: High Wycombe
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
13.23 miles Thorney: Iver DC-A
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
13.27 miles CorScale: Court Lane, Iver
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
13.40 miles Link Park Heathrow Data Center
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
13.45 miles Pinewood: Slough Campus
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
13.48 miles Wycombe Air Park
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
13.48 miles ServerFarm London
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
13.49 miles DataBank: London Heathrow
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
13.84 miles DRT London (West Drayton)
14.05 miles CyrusOne: London LON6
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
14.06 miles CyrusOne: LON6 Bldg2
This facility will be part of CyrusOne's LON6 Campus in London.
14.08 miles CyrusOne: LON6 Bldg3
This facility will be part of CyrusOne's LON6 Campus in London.
14.10 miles CyrusOne: LON6 Bldg4
This facility will be part of CyrusOne's LON6 Campus in London.
14.11 miles CyrusOne: LON6 Bldg5
This facility will be part of CyrusOne's LON6 Campus in London.
14.13 miles CyrusOne: LON6 Bldg6
This facility will be part of CyrusOne's LON6 Campus in London.
14.19 miles West London Tech Bldg2
This facility is part of Greystoke's West London Tech Park.
14.21 miles Sequence: Iver, Buckinghamshire
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
14.21 miles CapitaLand: Cressex Business Park
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
14.23 miles DRT London (Cresses Business Park)
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
14.23 miles West London Tech Park
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
14.62 miles Smallworld: Guildford
14.73 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
14.78 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
14.84 miles VIRTUS Stockley Park Campus
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
14.88 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
14.92 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
15.09 miles VIRTUS: London 14
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
15.59 miles Rackspace: LON8
15.61 miles Verizon London UK4
16.18 miles Stellanor: Hounslow
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
16.25 miles Hyperscale Data Center Request Dataset
Located in the Silverdale Industrial Estate, this new West London facility is a specialized two-story data center dedicated to AWS tape storage.
16.27 miles Marvel: Hayes
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
16.39 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
16.43 miles VIRTUS Hayes London2
17.16 miles Colt: London 5
This facility is a part of Colt's London Hayes Campus in West London.
17.17 miles Colt: London 6
This planned facility is part of Colt's London Hayes Campus in West London.
17.20 miles Colt: London Hayes LON4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
17.24 miles Colt: London 7
This planned facility is part of Colt's London Hayes Campus in West London.
17.27 miles Colt: London 8
This planned facility is part of Colt's London Hayes Campus in West London.
18.51 miles Virtus: London 17
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
18.54 miles Virtus: London 18
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
18.58 miles Virtus: London 16
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
18.60 miles Virtus: Saunderton Campus
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
19.41 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
19.41 miles Barclays Data Centre

Level3 Bracknell Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?