Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.01 miles | Connexeon Antwerpen | |
| 0.02 miles | LCL Antwerpen | |
| 0.15 miles | DC United: Flanders |
Datacenter United's DC Flanders facility is located in Atlantic House, Antwerp, Belgium.
|
| 0.51 miles | DC United: Antwerp |
The Antwerp datacenter is Uptime Institute Tier IV certified, signifying the highest level of reliability.
|
| 4.43 miles | DC United: Burcht |
Datacenter United acquired the facility, along with DC Star's Ghent and Oostkamp sites, in 2022.
|
| 7.29 miles | Orange Belgium Hoboken |
|
| 17.42 miles | DC United: Machelen |
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
|
| 18.05 miles | Cellnex: Roosendaal |
|
| 19.49 miles | Colt: Rotterdam |
Colt Rotterdam Data Centre is designed to a Colt tier 3 standard, offering substantial IT power capacity and a spacious data hall area of 11,400m².
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas