The Newcastle-Tyneside metropolitan area (MSA) has 1.6 million residents. The cities that make up the MSA are: Newcastle (880,000), Sunderland (335,000), Durham (41,000) Source: Wikipedia
The campus, originally constructed by Highbridge as the Cobalt Data Center has a potential for up to 80MW of power. The first building is operational, with room for four 2MW halls.
The Newcastle-Tyneside metropolitan area (MSA) has 1.6 million residents. The cities that make up the MSA are: Newcastle (880,000), Sunderland (335,000), Durham (41,000) Source: Wikipedia
Sites | Sites | Gross SqFt | Gross SqFt | Power (MW) | Power (MW) | |
---|---|---|---|---|---|---|
Secure Newcastle Datacentre | 1 | 0 | 0.00 | |||
ITPS | 1 | 30,000 | 1.60 | |||
Stellium Datacenters | 1 | 110,330 | 8.00 | |||
CenturyLink | Level 3 | 1 | 0 | 10.30 | |||
{{ provider.company_name }} | {{ provider.sites_count_for_region }} | {{ provider.sqft_for_region }} | {{ provider.power_mw_for_region }} |
Gross SqFt | Gross SqFt | Power (MW) | Power MW | |
---|---|---|---|---|
Stellium Newcastle Campus | 110,330 | 8.00 | ||
ITPS Newcastle | 30,000 | 1.60 | ||
Level3 Newcastle | ||||
Secure Newcastle Datacentre | ||||
{{ datacenter.site_name }} | {{ datacenter.total_gross_sqft }} | {{ datacenter.total_power_mw }} |
New Stellium data centre at Cobalt Business Park
Cobalt Data Centre 3 is the latest addition to Cobalt Data Centre Campus. The new building provides more than 2,400m2 of technical floor space and continues the sustainability ethos that developer, Highbridge North Tyneside has adopted for the campus.
Source: Breeam