Baton Rouge Data Center Market

The Baton Rouge data center market is located in the state of Louisiana within Americas. Baton Rouge has 5 facilities with 74,000 sqft and 3 megawatts.

The top providers in Baton Rouge are Hut 8 Corp (2 sites) and DartPoints with 2 facilities . The most popular facilities are Lumen Baton Rouge 2 and DartPoints: Baton Rouge BTR1.

Market Facts

Baton Rouge Data Center Map

Baton Rouge Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
+20120% since 2001
Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
announced for 2001–2026

Data Centers in Baton Rouge

Name Company Size Status Type
Lumen Baton Rouge 2 Lumen Technologies Extra Small Operational Carrier
DartPoints: Baton Rouge BTR1 DartPoints Extra Small Operational Carrier-Neutral
DartPoints: Baton Rouge BTR2 DartPoints Extra Small Operational Carrier-Neutral
Hut 8: River Bend Campus Hut 8 Corp Extra Large Construction, Planned HPC
Hut 8: River Bend 2 Hut 8 Corp Large Construction HPC

Largest Providers in Baton Rouge

Hut 8 Corp
Site
Power
Operational
0
0.0
Construction
2
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
DartPoints
Site
Power
Operational
2
2.2
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Lumen Technologies
Site
Power
Operational
1
0.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Baton Rouge

Location Total SqFt Gross SqFt Power (MW)
DartPoints: Baton Rouge BTR2 27,000 SqFt
9,130 SqFt
NN Request Dataset
DartPoints: Baton Rouge BTR1 47,000 SqFt
18,433 SqFt
NN Request Dataset
Lumen Baton Rouge 2 NN Request Dataset
Hut 8: River Bend Campus 450,000 SqFt
Hut 8: River Bend 2 450,000 SqFt

Sites Under Construction in Baton Rouge

Location Building SqFt Power (MW) Estimated Launch
Hut 8: River Bend Campus 450,000 SqFt 100 Megawatts Q2 2026
Hut 8: River Bend 2 450,000 SqFt 100 Megawatts Q4 2026

Related News (See all)

Related Podcasts (See all)

Documents

Ready to Level up Your
Data Center Strategy?