Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 10.22 miles | Deep Green: Manchester DG01 |
Deep Green is to deploy an edge data center at the Move Urmston Leisure Center in southwest Manchester.
|
| 10.72 miles | Digital L&D: Manchester, UK. |
Salford City Council has approved a £250m data center at Peel Waters’ Halo West site in Eccles, Salford, northwest of Manchester.
|
| 12.21 miles | ANS: MaNOC 4 |
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
|
| 12.29 miles | Pulsant: Manchester NW-1 |
|
| 12.33 miles | ANS: MaNOC 5, 6 & 7 |
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
|
| 13.28 miles | LCRDC: Manchester Core |
LCRDC's Manchester data centre facility is located close to Manchester Airport’s City Enterprise Zone and is one of the best connected and well protected data centres in the UK.
|
| 13.35 miles | AtlasEdge: MAN001 | |
| 13.58 miles | iomart: DC13 Manchester |
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
|
| 13.65 miles | Equinix Manchester MA3 |
|
| 13.69 miles | Computacenter: Manchester | |
| 13.80 miles | Datacentreplus: Manchester | |
| 13.88 miles | TeleData | |
| 13.98 miles | AIMES Liverpool Innovation Park |
|
| 14.01 miles | AIMES DC1 Baird House |
|
| 14.01 miles | Intercity: Bolton |
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.
|
| 14.09 miles | MSAI: Manchester |
Media Stream AI (MSAI) has unveiled a £50m ($67.2m) investment to develop a state-of-the-art AI data centre, robotics lab, and production facility at Anchorage Place in Salford’s Media City.
|
| 14.24 miles | Nasstar: Salford | |
| 15.29 miles | iomart: DC7 Manchester |
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
|
| 15.29 miles | Lunar 1 |
The Lunar 1 data center, located at Reynolds House in the Manchester Technopark, is an enterprise-grade colocation facility managed by Lunar Digital Solutions Ltd.
|
| 15.29 miles | Equinix Manchester MA2 |
|
| 15.29 miles | DRT Manchester |
Reynold House is a three-storey triple net powered shell data centre located 13 km from Manchester International Airport and 290 km north west of London.
|
| 15.31 miles | Lunar 2 |
Lunar 2 in Manchester offers colocation with two data halls, 1,500 kg/m² floor load, an N+1 DX CRAC and In-Row cooling system, a 1.5 MVA incoming feed capacity and N+1 generator redundancy with 168-hour fuel capacity at full load.
|
| 15.31 miles | CapitaLand: Reynolds House |
|
| 15.31 miles | ANS: MaNOC 8 | |
| 15.33 miles | iomart: Melbourne Turing House |
|
| 15.33 miles | iomart DC6 Manchester |
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
|
| 15.60 miles | Equinix Manchester MA4 |
|
| 15.69 miles | Equinix Manchester MA1 |
|
| 15.89 miles | nLighten: Liverpool |
This facility was formerly operated by Proximity Data Centres before being acquired and rebranded by nLighten in late 2023.
|
| 15.94 miles | Wavenet: Manchester ServerBank |
Wavenet Limited operates the ServerBank Manchester data center (also referred to as Manchester DC 13) at Bank House, Manchester, United Kingdom.
|
| 15.98 miles | LCRDC: Liverpool City Queen's |
Liverpool City Region Data Centres (LCRDC) Liverpool City Queen's is an edge colocation data center located in the Baltic Triangle area of Liverpool.
|
| 16.00 miles | Asanti: Manchester |
The Asanti Manchester data centre was acquired from Daisy Group in November 2022. The Manchester data centre offers 15,000 sq ft of secure colocation hosting space.
|
| 16.48 miles | Level3 Liverpool | |
| 16.64 miles | L51 Developments: Bootle |
L51 Developments has submitted preliminary plans to Sefton Council for a three-story, 485,000-square-foot data center on a 10-acre site off Bridle Road.
|
| 16.70 miles | LCRDC: Liverpool City King Edward |
Strategically located at the north edge of Liverpool City Centre, this 6800sqft colocation facility offers multiple configuration options.
|
| 16.73 miles | Level3 Manchester | |
| 16.90 miles | nLighten: Chester MAN1 |
The nLighten Chester (MAN1) facility is a Tier III-standard edge data center located on the Dunkirk Trading Estate.
|
| 17.36 miles | LCRDC: Bootle Hornby |
Strategically located within South Sefton, this Edge Data Centre is a central gateway to the local digital businesses, such as those in AI, retail, shipping, education, gaming, sensors and tech businesses.
|
| 17.42 miles | Lunar 3 |
Lunar 3 offers four data halls, three IT zones, a 1,000 kg/m² floor load, 1.2 MVA DX CRAC cooling, and 2 MVA power with N+1 redundancy from two independent sources and one substation.
|
| 18.34 miles | Kao Data: Manchester |
Kao Data is developing a £350m data center at Kenwood Point, Stockport, UK.
|
| 18.68 miles | LCRDC: Wallasey Water Tower |
Strategically located in this historic county of Cheshire, this 3500sqft colocation facility offers multiple configuration options for customers.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas