Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.14 miles | Lumen Chicago 4 | |
| 1.07 miles | Lumen Chicago 3 |
|
| 1.08 miles | EXA - 111 North Canal |
Former GTT suite
|
| 1.08 miles | Lumen Chicago 1 |
|
| 1.14 miles | Lumen Chicago 6 |
|
| 1.51 miles | Cogent: 216 W Jackson | |
| 1.53 miles | Verizon: 140 S Dearborn | |
| 1.67 miles | Legacy: Chicago Byte Exchange CBE1 |
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
|
| 1.71 miles | QuadraNet Chicago | |
| 1.73 miles | Cogent: 427 S LaSalle | |
| 1.73 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
| 1.73 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
| 1.86 miles | DataBank (ORD1) 600 S Federal | |
| 1.86 miles | Digital Realty: Chicago ORD11 | |
| 1.86 miles | Colocation America CH2 | |
| 1.86 miles | Lumen Chicago 5 | |
| 1.86 miles | Cogent: 600 S Federal | |
| 1.87 miles | TierPoint Chicago Polk |
|
| 1.88 miles | First Communications Chicago | |
| 1.88 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
| 1.90 miles | Crown Castle 725 S Wells |
|
| 1.91 miles | 725 S Wells - 1547 Critical Systems |
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
| 1.95 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
| 1.95 miles | DataBank (ORD2) 840 S Canal |
|
| 2.51 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
| 2.88 miles | Metro Edge: Illinois Medical District (IMD) |
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
| 3.39 miles | Digital Realty: ORD10 |
Digital Realty acquired the colocation services business of Hivelocity in 2025.
|
| 3.39 miles | Centersquare: Chicago ORD1 |
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
|
| 3.39 miles | Colocation America CH1 |
|
| 3.39 miles | Equinix Chicago CH1, CH2, & CH4 |
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
|
| 3.39 miles | Steadfast Chicago 350 E Cermak |
|
| 3.40 miles | Deft: Downtown CH1 | |
| 3.41 miles | Centersquare: Chicago ORD1(B, C & D) |
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
|
| 3.97 miles | QTS: Chicago 2 |
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
|
| 4.03 miles | QTS: Chicago 3 |
QTS plans to build another data center building on its Chicago Campus.
|
| 4.11 miles | QTS: Chicago Campus |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
| 7.26 miles | 1547 Chicago Midway Technology Centre |
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
| 11.14 miles | Tierpoint Chicago West | |
| 11.16 miles | Digital Realty: Franklin Park Expansion |
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
|
| 11.18 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
| 11.20 miles | Digital Realty: ORD14 | |
| 11.21 miles | Digital Realty: ORD13 | |
| 11.23 miles | Digital Realty: Chicago ORD12 | |
| 11.35 miles | Digital Realty: ORD15 |
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
| 11.41 miles | Lumen Broadview | |
| 12.16 miles | Related Digital: Chicago, IL |
Related Digital is planning a 430-acre campus in Chicago, Illinois, at the old US Steel South Works location.
|
| 12.19 miles | Related Digital: Chicago Expansion | |
| 13.82 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 14.05 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 14.08 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 14.18 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 14.21 miles | Hyperscale Data Center Request Dataset |
|
| 14.39 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
| 14.55 miles | Verizon: Swift Dr |
|
| 14.55 miles | DataBank (ORD4) Oak Brook |
|
| 14.55 miles | LexusNexis Oak Brook | |
| 14.62 miles | Digital Crossroad: Hammond, IN (Phase 2) |
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 180,000 sq ft (16,720 sqm) building in the second phase.
|
| 14.71 miles | Digital Crossroad (Indiana NAP) |
The facility (DX-1) is a 105,000 square foot data center located on the former State Line Generating Plant, Hammond, IN.
|
| 15.60 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
| 15.60 miles | US Signal Oakbrook IL01 |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
| 15.60 miles | Verizon: (Oak Brook) | |
| 15.74 miles | NYI Chicago (Oak Brook) | |
| 16.76 miles | TA Realty: Elk Grove |
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
| 17.04 miles | T5: Chicago V |
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
| 17.22 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 17.23 miles | EdgeConneX CHI01 |
|
| 17.26 miles | EdgeConneX: CHI03 |
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
| 17.28 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 17.32 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 17.33 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 17.33 miles | Stream Chicago I |
Free-Standing, Data Center Designed to Tier III Standards
|
| 17.34 miles | EdgeConneX CHI02 | |
| 17.39 miles | Equinix: CH5 |
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
| 17.41 miles | 2299 Busse (CH2) Digital Realty |
|
| 17.44 miles | Equinix Chicago CH3 |
|
| 17.54 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 17.59 miles | Rackspace Elk Grove ORD1 | |
| 17.60 miles | Deft: Elk Grove DF-CH1 |
|
| 17.60 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 17.60 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 17.62 miles | 2200 Busse Rd (CH1) DRT | |
| 17.67 miles | Stream: Chicago III DC2 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 17.69 miles | Stream: Chicago III DC3 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 17.71 miles | 1450 E Devon Ave (CH3) DRT | |
| 17.75 miles | Stream: Chicago III |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 17.91 miles | Equinix Chicago CH7 |
|
| 17.91 miles | Stack: CHI02 |
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
| 18.04 miles | STACK Chicago CHI01 |
|
| 18.14 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
| 18.18 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 18.24 miles | Hyperscale Data Center Request Dataset | |
| 18.31 miles | CenturyLink: Arlington Heights | |
| 18.35 miles | CloudHQ: Mount Prospect ORD2 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 18.39 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
| 18.43 miles | Prime: ORD01-03 |
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
| 18.45 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 18.48 miles | Prime: ORD01-02 |
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
| 18.52 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 18.64 miles | Apotech: Illinois 1 |
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
| 18.88 miles | Colocation America CH3 | |
| 18.88 miles | DataBank ORD3 Mount Prospect |
|
| 18.90 miles | Hyperscale Data Center Request Dataset |
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 18.90 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 18.97 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 19.00 miles | Digital Fortress: Chicago Lombard | |
| 19.00 miles | 360TCS-Lombard | |
| 19.01 miles | T5 Chicago II |
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
| 19.49 miles | NTT: Chicago CH4 |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
| 19.52 miles | NTT: Chicago CH5 |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
| 19.62 miles | NTT Chicago CH1 |
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
| 19.62 miles | Aligned: ORD-04 |
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
| 19.63 miles | NTT: CH3 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 19.64 miles | NTT: CH2 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 19.74 miles | Aligned: ORD-03 |
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas