Lumen College Park 1

4311 Best Rd

░░░░░ Login to view SqFt Total Building Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

4311 Best Rd
Click Map to begin Search

Sites within 15 miles of Lumen College Park 1

Show SqM
Distance Site About
1.67 miles CleanSpark: College Station
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
2.83 miles 760 Doug Davis - Digital Realty
The building is fully leased to a major US based airline
3.26 miles Microsoft East Point
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
4.72 miles American Tower: SW Atlanta
6.69 miles Lumen Atlanta 5
6.71 miles EdgeConneX ATL01
6.71 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
6.81 miles EdgeConneX ATL02
6.92 miles DataBank Atlanta ATL2
6.94 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
8.98 miles Digital Realty: 10 Forsyth St NW
Digital Realty is pursuing the development of its fourth data center in Atlanta, Georgia.
9.01 miles Equinix Atlanta AT2 AT3
Equinix AT2 and AT3 are located in the 56 Marietta carrier hotel.
9.01 miles 56 Marietta Carrier Hotel - Digital Realty
56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.
9.01 miles HostPapa GA1
10,000sqft data center with in Atlanta's telecom hotel
9.01 miles FOGO Atlanta
Small site with in the 56 carrier hotel.
9.02 miles QuadraNet Atlanta
Quadranet's Atlanta facility s located downtown and within walking distance of 56 carrier hotel.
9.04 miles 55 Marietta
It is easy to confuse the 2 at first glance, 55 Marietta (which is across the street) from its more famous neighbor, 56 Marietta
9.04 miles Cogent: 55 Marietta
9.05 miles American Tower: 55 Marrietta
9.05 miles American Tower: 55 Marietta (Cyber Wurx)
This site was acquired by American Tower in 2021 from Cyber Wurx
9.05 miles Colo Atl-55 Marietta
Colo Atl has no monthly recurring cross connect fees between tenants and provides exceptional customer service.
9.05 miles ATLDC 55 Marietta
9.09 miles Aptum Atlanta
9.18 miles AT&T Southern Bell Telephone Company Building
The Southern Bell Telephone Company Building, now known as the AT&T Communications Building, is the main telephone exchange for downtown Atlanta, Georgia. It was highlighted in 2018 by the Intercept as a key building for NSA surveillance programs.
9.29 miles 180 Peachtree
9.30 miles Lumen Atlanta 2
9.30 miles Equinix Atlanta AT1
Equinix's AT1 site is a 6-story reinforced steel and concrete with brick face building.
9.35 miles DataBank: Atlanta ATL4
DataBank has started the construction of its ATL4 data center at 200 Selig Dr SW, Atlanta.
9.40 miles 250 Williams (AT2) Digital Realty
Digital Realty's data center at 250 Williams Street located in the American Cancer Society Center in downtown Atlanta.
9.40 miles Evocative ATL1
Built in 2000 and was subsequently expanded in 2012
9.49 miles Southern Telecom Atlanta
9.81 miles Lumen Atlanta 1
9.81 miles H5 Atlanta
The H5 Atlanta colocation facility features direct access to the key Southeastern metro and long haul network providers and is the site of Level (3)'s Atlanta Gateway.
9.91 miles QTS Atlanta Metro
A massive 970,000 sqft data center is one of the largest in the world.
9.91 miles Internap Atlanta ACS003
Internap's facility at 1033 Jefferson is located within QTS's massive Atlanta Metro data center.
9.92 miles Lumen Atlanta 6
9.94 miles QTS Atlanta DC2
10.20 miles Cyxtera Atlanta AT1
Located in Lithia Springs, GA, the AT1 data center resides in a single-story, purpose-built building and less than a mile from Google's data center.
10.20 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
10.20 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
10.24 miles QTS: Atlanta DC3
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
10.24 miles QTS: Atlanta DC4
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
10.25 miles 101 Aquila - Digital Realty
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
10.36 miles DataBank Atlanta ATL1
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
10.53 miles Google Douglas County Georgia
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
10.54 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
10.65 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
10.73 miles PwC Lithia Springs
10.81 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
10.89 miles Flexential: Douglasville 2
Flexential is constructing a second data center building at its Atlanta-Douglasville, Georgia campus.
10.92 miles Project Rita: Tyrone, GA (Proposed)
A new data center campus is being planned in Fayette County, Georgia. The site would be home to ‘Project Rita’, a proposed development of two one-story data center buildings totaling 490,000 square feet (45,520 sqm), and an on-site substation. The campus would total 96MW.
10.98 miles Switch Atlanta: The KEEP
11.13 miles CoreWeave: Atlanta-Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
11.14 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
11.20 miles DC BLOX: ATL West
The two building data center campus will feature twelve data halls, totaling 750,000 square feet of gross space on 55 acres.
11.33 miles Edged Energy: Atlanta 3
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. The first phase of this U.S. expansion includes a 168 MW campus in Atlanta. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
11.35 miles Edged Energy: Atlanta 2
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. The first phase of this U.S. expansion includes a 168 MW campus in Atlanta. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
11.43 miles Microsoft: Douglasville 3
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
11.43 miles Microsoft Douglasville
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
11.44 miles Microsoft: Douglasville 2
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
11.44 miles Edged Energy: Atlanta
Data center provider Edged Energy has broken ground on a new data center project in Atlanta, Georgia. The first phase of this U.S. expansion includes a 168 MW campus in Atlanta. Edged is constructing three buildings on the campus, located at 1986 Marietta Road.
11.45 miles Microsoft: Douglasville 4
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
11.58 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
11.86 miles T5@Atlanta Bldg 5
T5@Atlanta Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
11.90 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
11.95 miles T5@Atlanta Bldg 4
T5@Atlanta Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.00 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
12.02 miles T5@Atlanta Bldg 3
T5@Atlanta Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.10 miles T5@Atlanta Campus
T5@Atlanta Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.11 miles T5@Atlanta Bldg 2
T5@Atlanta Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
12.60 miles QTS: Fayetteville DC8
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.63 miles QTS: Fayetteville DC9
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.65 miles QTS: Fayetteville DC14
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.66 miles QTS: Fayetteville DC10
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.76 miles QTS: Fayetteville DC11
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.78 miles Microsoft Palmetto
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
12.89 miles QTS: Fayetteville DC12
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
12.90 miles QTS: Fayetteville DC13
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.19 miles QTS: Fayetteville DC15
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.24 miles QTS: Fayetteville DC16
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.34 miles QTS: Fayetteville DC5
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.41 miles QTS: Fayetteville DC4
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.47 miles Verizon: 4000 Highland
The site is a previous XO Communications facility
13.48 miles QTS: Fayetteville DC3
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.58 miles QTS: Fayetteville DC2
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.61 miles QTS: Fayetteville DC7
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
13.65 miles QTS Fayetteville
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
14.55 miles 365 Smyrna, GA
The facility was formerly operated by Sungard and known as ATL-5600
15.38 miles T5: ATL IV
T5 Data Centers is planning to develop a 2.95M SF data center campus on 200 acres on a site south of Weldon Road and east of Palmetto Tyrone Road more than 25 miles south of Downtown Atlanta.
17.43 miles Coloblox
Local provider located in North Atlanta at the junction of I-285 and I-75
17.83 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
19.92 miles DataSite Atlanta
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain

Lumen College Park 1 Data Center Photos

Map produced by TAG, the Technology Association of Georgia.

Map of Georgia's Data Centers
Posted in Atlanta

Map produced by TAG, the Technology Association of Georgia.

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
278 Facilities Owned
121 Markets Served
View Company

News

Read More News