Lumen: Leeds (Sterling House)

Latest Podcast
Sterling House
Operational
Fully operational facility
Operated by:

Lumen: Leeds (Sterling House)

░░░ Request Dataset MW
Total Power

Map and Nearby Locations:

Sterling House
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen: Leeds (Sterling House)

Distance Site About
0.22 miles aql: Leeds DC3
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
0.68 miles aql: Leeds DC2
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
0.70 miles aql: Leeds DC5
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
1.46 miles Gridjet: DC4 & DC5
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
1.93 miles AtlasEdge: Leeds, UK
AtlasEdge unveils Leeds first Tier 3 standard data center. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
2.59 miles Hyperscale Data Center Request Dataset
Microsoft has acquired 48 acres of land at the Skelton Grange site in Leeds, UK, for £106.6 million ($134.83m) from real estate group Harworth.
2.67 miles Hyperscale Data Center Request Dataset
2.74 miles Hyperscale Data Center Request Dataset
4.03 miles Virgin Media Leeds (Temple House)
4.26 miles C.C.S. DC14 - Leeds
5.67 miles Asanti: Leeds
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
7.86 miles Node4: Leeds
8.95 miles nLighten Leeds (Wakefield)
9.03 miles Deep Green: Bradford
Data center company Deep Green is set to build a new facility in Bradford, West Yorkshire, United Kingdom.
12.64 miles Stellanor: Harrogate
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
13.60 miles Stellanor: Elland TC4
The facility located at Unit J1, Lowfields Business Park in Elland is a high-specification data center that was acquired by Stellanor Datacenters from Redcentric in late 2025.
15.10 miles Copley Data Center
Lloyds Bank is selling its 55-acre office and data center campus in West Yorkshire.
17.99 miles Hyperscale Data Center Request Dataset
Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.

Lumen: Leeds (Sterling House) Data Center Photos (See all)

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
79
Markets
277MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?