Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.22 miles | aql: Leeds DC3 |
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
|
| 0.68 miles | aql: Leeds DC2 |
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
|
| 0.70 miles | aql: Leeds DC5 |
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
|
| 1.46 miles | Gridjet: DC4 & DC5 |
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
|
| 1.93 miles | AtlasEdge: Leeds, UK |
AtlasEdge unveils Leeds first Tier 3 standard data center. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
|
| 2.59 miles | Hyperscale Data Center Request Dataset |
Microsoft has acquired 48 acres of land at the Skelton Grange site in Leeds, UK, for £106.6 million ($134.83m) from real estate group Harworth.
|
| 2.67 miles | Hyperscale Data Center Request Dataset | |
| 2.74 miles | Hyperscale Data Center Request Dataset | |
| 4.03 miles | Virgin Media Leeds (Temple House) | |
| 4.26 miles | C.C.S. DC14 - Leeds | |
| 5.67 miles | Asanti: Leeds |
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
|
| 7.86 miles | Node4: Leeds |
|
| 8.95 miles | nLighten Leeds (Wakefield) |
|
| 9.03 miles | Deep Green: Bradford |
Data center company Deep Green is set to build a new facility in Bradford, West Yorkshire, United Kingdom.
|
| 12.64 miles | Stellanor: Harrogate |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 13.60 miles | Stellanor: Elland TC4 |
The facility located at Unit J1, Lowfields Business Park in Elland is a high-specification data center that was acquired by Stellanor Datacenters from Redcentric in late 2025.
|
| 15.10 miles | Copley Data Center |
Lloyds Bank is selling its 55-acre office and data center campus in West Yorkshire.
|
| 17.99 miles | Hyperscale Data Center Request Dataset |
Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas