Microsoft Azure

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

Microsoft Azure Data Center Map

Microsoft Azure Power Growth Over Time

+213% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Microsoft Azure Locations

Prime CampusInterested in this information?Contact us

Nairobi

Microsoft and Dubai-based AI firm G42 are investing $1 billion to build a geothermal-powered data center in Kenya, with potential capacity reaching 1GW.

View Data Center

Center GammaInterested in this information?Contact us

Bucharest

Microsoft could be planning its first data center in Romania after buying a plot of land in Otopeni, 15km north of Bucharest.

View Data Center

Global PlazaInterested in this information?Contact us

Phoenix

The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.

View Data Center

StationInterested in this information?Contact us

Vienna

The Austria East region, consisting of three availability zones in the Greater Vienna / Lower Austria area, went live in August 2025.

View Data Center

TowerInterested in this information?Contact us

Vienna

The Austria East region, consisting of three availability zones in the Greater Vienna / Lower Austria area, went live in August 2025.

View Data Center

Edge RidgeInterested in this information?Contact us

Toronto

Microsoft's YTO12 is the planned second phase of its Vaughan data centre campus at 6100 Langstaff Road, a three-storey building next to YTO11.

View Data Center

Edge StationInterested in this information?Contact us

Toronto

The proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," features two distinct 3-storey buildings including administration zone.

View Data Center

Center BetaInterested in this information?Contact us

Des Moines

In July 2023, Microsoft gained a permit for a data center at 3655 S.E. Soteria Ave. Issued to Microsoft's contractor, the Weitz Company, the permit was for a 184,600 sq ft facility under the description DSM 14.

View Data Center

SouthInterested in this information?Contact us

Northwest Indiana

Microsoft is preparing the first data center building at its La Porte campus, with site grading underway and vertical construction scheduled to follow. The facility is planned as the first completed structure in the six-building initial phase.

View Data Center

Ridge GammaInterested in this information?Contact us

Amsterdam

Fourth Microsoft Azure data center building at the Agriport A7 campus, permitted alongside AMS07. Part of a 4-building availability zone cluster delivering 32 MW combined with AMS09.

View Data Center

West ValleyInterested in this information?Contact us

Amsterdam

Fifth Microsoft Azure data center building at the Agriport A7 campus. Part of a 4-building availability zone cluster with AMS08, delivering 32 MW combined.

View Data Center

Cloud PointInterested in this information?Contact us

Amsterdam

Seventh Microsoft Azure data center building at the Agriport A7 campus, part of the AMS11/AMS12 joint permit phase and operational circa 2021.

View Data Center

Metro ParkInterested in this information?Contact us

Amsterdam

Eighth Microsoft Azure data center building at the Agriport A7 campus, functioning as a reliability/redundancy generation (RNG) facility. Permitted jointly with AMS11 and operational circa 2021.

View Data Center

Prime ParkInterested in this information?Contact us

Seattle

Built in July 2009, The 57,000 square foot Redmond Ridge 1 data center is about eight miles from Microsoft's headquarters campus in Redmond.

The site was a cultural shift for Microsoft employees at the time. At the time each development team had their own server labs on the Redmond campus. Today cloud computing is commonplace, but this data center forced the teams to think and develop software in terms of remote computing.

View Data Center

SouthInterested in this information?Contact us

Des Moines

In 2023, a permit valued at $358 million was issued for a 245,000-square-foot data center in Microsoft’s Ginger East campus.

View Data Center

EastInterested in this information?Contact us

Dublin

The first building on Microsoft's second Grange Castle campus in west Dublin, a 229,800 sq ft single-storey data centre completed in 2015.

View Data Center

Core PointInterested in this information?Contact us

Dublin

A stand-alone Microsoft data centre in its own compound on the Grange Castle campus in west Dublin, about 81,900 sq ft, running by 2022.

View Data Center

CenterInterested in this information?Contact us

Hyderabad

Microsoft acquired 52 acres in Chandanvelly for Rs 72 crore to establish one of the three data centers announced in 2022 for the Hyderabad cloud region.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Quebec City

Microsoft's Lévis data centre is a single building under construction on the former Charny golf course at 2441 avenue de la Rotonde, on a 133-acre site. Microsoft bought the land in November 2021 and began construction in April 2024, with start-up planned for late 2026 or early 2027. It is one of four Quebec City-area sites in Microsoft's US$500 million Quebec programme.

View Data Center

SouthInterested in this information?Contact us

Quincy

This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.

View Data Center

Core TowerInterested in this information?Contact us

Northern Virginia

Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.

View Data Center

Park AlphaInterested in this information?Contact us

Cheyenne

Microsoft is building a data center campus at Cheyenne Business Parkway to support its West Central US Azure region. The plan was Announced in 2021.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

In 2024, Microsoft acquired 5.9 acres for $7.3m from Randall and Louise Borgardt in Racine County, Wisconsin.

View Data Center

Center TwoInterested in this information?Contact us

Atlanta

Announced in October 2023, the campus in Rome Georgia is known as ‘Project Firecracker' It''s situated on a 347-acre property on Huffaker Road, east of Fouche Gap Road.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Kuala Lumpur

Microsoft’s KUL03 T2 is an under-construction expansion of its Cyberjaya data center campus, forming part of the wider KUL03 T2–T5 development.

View Data Center

Cloud CampusInterested in this information?Contact us

Des Moines

A $345 million permit was issued in 2023 for a 250,000-square-foot facility at 5855 S.W. Kerry St. This data center building is the final one for the Osmium Campus.

View Data Center

Campus ThreeInterested in this information?Contact us

Atlanta

Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.

View Data Center

Cloud StationInterested in this information?Contact us

Helsinki

Microsoft is constructing a data center in Kirkkonummi, Finland, as part of a broader initiative to establish a new data center region in Southern Finland, which also includes facilities in Espoo and Vihti.

View Data Center

Core PlazaInterested in this information?Contact us

Helsinki

Microsoft is constructing a data center campus in Vihti, Finland, as part of a broader initiative to establish a new data center region in Southern Finland, which also includes facilities in Espoo and Kirkkonummi.

View Data Center

Campus OneInterested in this information?Contact us

Ohio

Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.

View Data Center

PlusInterested in this information?Contact us

Des Moines

Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.

View Data Center

Plaza AlphaInterested in this information?Contact us

Athens

Microsoft's first Data Center in Greece is underway, with a €100 million (including VAT) construction contract covering all phases: studies, construction, and commissioning.

View Data Center

Tower ThreeInterested in this information?Contact us

Des Moines

The first phase of the Ginger East project, which sits on a 146-acre plot east of Veterans Parkway at SE Maffitt Lake Road, consists of a 250,000 sq ft (23,200 sqm) data center building located near the company's existing Alluvion data center.

View Data Center

PointInterested in this information?Contact us

Des Moines

In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Pune

This planned facility will be part of Microsoft's two-building data center campus in the Pimpri Chinchwad Industrial Area of Pune.

View Data Center

Hub AlphaInterested in this information?Contact us

Hauts-de-France

Microsoft is looking to build a data center outside Dunkirk in Quaëdypre in Hauts de Flandre, in the Nord department of Northern France. The company wants to build a data center on a 20.5-hectare site.

View Data Center

PointInterested in this information?Contact us

Hauts-de-France

Microsoft is looking to develop two facilities in the neighboring department of Pas-de-Calais; one outside Calais in Vieille-Église and another further south in Zouafques.

View Data Center

NorthInterested in this information?Contact us

Busan

Microsoft revealed plans to build a data center in Busan in 2014, which became operational in 2020.

View Data Center

Ridge ThreeInterested in this information?Contact us

Atlanta

Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.

View Data Center

UltraInterested in this information?Contact us

Northwest Indiana

Microsoft plans to develop the second data center in the initial La Porte construction sequence. The building is included in the active site-development program and is scheduled for completion shortly after Building 1.

View Data Center

Ridge ProInterested in this information?Contact us

Northwest Indiana

Microsoft is preparing a third data center building within the first La Porte development program. The facility is planned as the last of the initial three buildings to be completed.

View Data Center

HubInterested in this information?Contact us

Atlanta

Microsoft is the end user of EdgeConneX's $1.8 billion data center campus in Union City, southwest of Atlanta.

View Data Center

East PlazaInterested in this information?Contact us

Atlanta

Microsoft is the end user of EdgeConneX's $1.8 billion data center campus in Union City, southwest of Atlanta.

View Data Center

Ridge MaxInterested in this information?Contact us

Denmark

The Microsoft Tinghøj Campus is a cornerstone of the new "Denmark West" data center region, representing a hyperscale investment designed to meet the soaring demand for AI and cloud services.

View Data Center

RidgeInterested in this information?Contact us

Des Moines

Microsoft has acquired 377 acres of farmland for $40 million for a data center in Van Meter's Vision Park, Des Moines, Iowa.

View Data Center

PrimeInterested in this information?Contact us

Quincy

Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.

View Data Center

Tower PlusInterested in this information?Contact us

Atlanta

Microsoft plans a two-building data center campus on 161 acres along Georgia Highway 74 near Tyrone, in Fayette County south of Atlanta.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Cheyenne

Microsoft is currently developing a new hyperscale data center campus on HR Ranch Road in Cheyenne, Wyoming. The project is slated for an 18-to-24-month construction cycle, with a final completion date projected for early 2027.

View Data Center

East HubInterested in this information?Contact us

San Antonio

Microsoft's SAT15 data center is located at 3555 Westover Link in San Antonio’s Bexar County. Microsoft invested $215.9 million for this 245,000 sq ft facility.

View Data Center

Tower PrimeInterested in this information?Contact us

San Francisco Bay Area

Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.

View Data Center

ValleyInterested in this information?Contact us

Dublin

Microsoft's third data centre on its original Grange Castle campus in west Dublin, a 169,000 sq ft single-storey building completed in spring 2014.

View Data Center

Hub UltraInterested in this information?Contact us

Atlanta

Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.

View Data Center

Station GammaInterested in this information?Contact us

Atlanta

Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.

View Data Center

Station AlphaInterested in this information?Contact us

Des Moines

In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.

View Data Center

Station BetaInterested in this information?Contact us

Atlanta

Microsoft plans a second three-story data center building at its ATL50 campus in Union City, Georgia.

View Data Center

Valley BetaInterested in this information?Contact us

Atlanta

Microsoft plans a three-story data center building as part of its new two-building ATL50 campus in Union City, Georgia.

View Data Center

Point UltraInterested in this information?Contact us

Finland

Microsoft's Vaasa data center is a planned facility on Finland's west coast, spanning the border of two municipalities within an existing industrial zone. Pre-construction groundworks are underway while building permits remain pending.

View Data Center

Ridge PlusInterested in this information?Contact us

Atlanta

Microsoft is the end user of EdgeConneX's $1.8 billion data center campus in Union City, southwest of Atlanta.

View Data Center

Valley ProInterested in this information?Contact us

Northern Virginia

First of two planned one-story Microsoft data center buildings on the Wellington MNZ07 campus near Gainesville, Virginia, on the former Atlantic Research plant site.

View Data Center

CenterInterested in this information?Contact us

Atlanta

Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.

View Data Center

PointInterested in this information?Contact us

Dublin

Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.

View Data Center

East ValleyInterested in this information?Contact us

Atlanta

Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.

View Data Center

GammaInterested in this information?Contact us

Aragon

Microsoft plans to build a new data center campus in La Puebla de Alfindén to the east of Zaragoza, Spain.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Pune

Microsoft is constructing a two-building data center campus in the Pimpri Chinchwad Industrial Area of Pune.

View Data Center

PointInterested in this information?Contact us

Grand Rapids MI

Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.

View Data Center

Park ThreeInterested in this information?Contact us

Amsterdam

Microsoft has purchased a 50-hectare plot of land in Middenmeer, north of Amsterdam, for the expansion of its AMS13/14 hyperscale data center campus.

View Data Center

Valley GammaInterested in this information?Contact us

Aragon

Microsoft will invest an additional €2.9 billion (US$3 billion) to build another data center campus in Zaragoza, adjacent to Puerto Venecia.

View Data Center

Ridge ThreeInterested in this information?Contact us

Milwaukee

Microsoft has officially withdrawn its plans for the "Project Nova" data center in Caledonia, Wisconsin, following significant community opposition.

View Data Center

North StationInterested in this information?Contact us

Grand Rapids MI

Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.

View Data Center

Ridge GammaInterested in this information?Contact us

Madrid

The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.

View Data Center

Valley UltraInterested in this information?Contact us

Quincy

Microsoft acquired a 170-acre plot in East Wenatchee in 2020 with plans to build six facilities in the Pangborn area.

View Data Center

Core PlazaInterested in this information?Contact us

Milan

MIL02 is the Ballard-design building on Microsoft's Settala campus: one building with four server cells around a central electrical spine and an east-side admin block, backed by four 3.2 MW Caterpillar diesel generators. Construction began in late 2021.

View Data Center

Plaza AlphaInterested in this information?Contact us

Reno

In 2025, the Lyon County Planning Commission approved a parcel map for Microsoft, allowing the company to restructure 274 acres of land it owns in Silver Springs, Nevada.

View Data Center

Plaza TwoInterested in this information?Contact us

Dublin

Microsoft's second Dublin data centre, a 112,000 sq ft single-storey Gen 4 modular building joined to the west end of DUB03 at Grange Castle, online at the end of 2012.

View Data Center

Prime CenterInterested in this information?Contact us

Des Moines

In May 2024, The West Des Moines City Council approved a development agreement with Microsoft for another data center in Des Moines.

View Data Center

PrimeInterested in this information?Contact us

Dublin

Microsoft's first data centre outside the US, a 303,000 sq ft two-storey building at Grange Castle in west Dublin, opened July 2009.

View Data Center

Hub GammaInterested in this information?Contact us

Quincy

This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

Microsoft has purchased another 32 acres of undeveloped land at 12721 Louis Sorenson Road in Mount Pleasant.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Helsinki

A Microsoft data center campus is being built in Högnäs, Espoo, on 21.6 hectares of land acquired by Microsoft for €30.9 million.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Virginia: Rural

Microsoft is building a new data center campus with multiple buildings on a 259.1-acre site in Mecklenburg County, Virginia, to expand its southern Virginia Regional Network Group.

View Data Center

Metro TowerInterested in this information?Contact us

San Antonio

Microsoft operates its SAT80-1 and SAT80-2 data centers on 206 rural acres at Potranco Road and FM 471 near Castroville.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Vienna

The Austria East region, consisting of three availability zones in the Greater Vienna / Lower Austria area, went live in August 2025

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Cheyenne

In 2024, Cheyenne officials approved the annexation of 920+ acres into the North Range Business Park, securing the necessary land for Microsoft's latest data center expansion.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Quebec City

Microsoft owns a parcel of about 8.5 acres (368,000 sq ft) on rue de Singapour in the François-Leclerc industrial park in Saint-Augustin-de-Desmaures, west of Quebec City, for a planned data centre. Microsoft bought the land in 2021 and included the site in its November 2023 Quebec investment programme. Construction has not started.

View Data Center

Hub OneInterested in this information?Contact us

Dublin

One of a pair of identical single-storey Microsoft data centres, with DUB08, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.

View Data Center

SouthInterested in this information?Contact us

Dublin

One of a pair of identical single-storey Microsoft data centres, with DUB07, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.

View Data Center

PlusInterested in this information?Contact us

Dublin

One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.

View Data Center

UltraInterested in this information?Contact us

Leeds

Microsoft has acquired 48 acres of land at the Skelton Grange site in Leeds, UK, for £106.6 million ($134.83m) from real estate group Harworth.

View Data Center

Point PlusInterested in this information?Contact us

Dublin

One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.

View Data Center

Tower OneInterested in this information?Contact us

Milwaukee

Microsoft acquired two tracts totaling 85 acres at 7905 and 8537 Braun Road, Mount Pleasant, for $24.1m from West Road Investments LLC.

View Data Center

Station PrimeInterested in this information?Contact us

Milwaukee

Microsoft bought 50.4 acres, at 4912 90th St., from Lake Forest, Illinois-based Espy Farms LLC for $14.3 million.

View Data Center

Edge PlazaInterested in this information?Contact us

Dublin

One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.

View Data Center

Hub ProInterested in this information?Contact us

Dublin

The last of four single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, completed in 2021.

View Data Center

Prime CenterInterested in this information?Contact us

South Africa

Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.

View Data Center

Park PrimeInterested in this information?Contact us

Dublin

One of two two-storey Microsoft data centres, with DUB15, at the west end of the Grange Castle campus in Dublin. Its first of five data halls went live in July 2023.

View Data Center

Park PrimeInterested in this information?Contact us

Hauts-de-France

Microsoft is looking to develop two facilities in the neighboring department of Pas-de-Calais; one outside Calais in Vieille-Église and another further south in Zouafques.

View Data Center

TowerInterested in this information?Contact us

Aragon

Microsoft plans to invest €6.69 billion ($7.16bn) in a new data center campus in Spain's northeastern Aragon region.

View Data Center

Plaza PlusInterested in this information?Contact us

San Antonio

Microsoft's SAT12 is one of three 225,000 sq ft data centers that Microsoft built in 2018-2023 on its Texas Research Park campus.

View Data Center

Tower AlphaInterested in this information?Contact us

Northern Virginia

Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).

View Data Center

StationInterested in this information?Contact us

Copenhagen

Microsoft’s CPH03 data center in Køge, part of its Denmark East cloud region, with Phase 2 expansion underway (2026–2028) and designed to operate on 100% renewable energy through power purchase agreements.

View Data Center

Station MaxInterested in this information?Contact us

Dublin

One of two two-storey Microsoft data centres, with DUB14, at the west end of the Grange Castle campus in Dublin, supported by an on-site gas generation compound.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

In early 2026, Microsoft received approval to establish a further 15 data centers in Mount Pleasant, Wisconsin.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

Microsoft has completed the purchase of an additional 1,000 acres of land for its Mount Pleasant data center campus in Racine County, Wisconsin.

View Data Center

UltraInterested in this information?Contact us

Amsterdam

Third Microsoft Azure data center building at the Agriport A7 campus, permitted alongside AMS08 and operational in 2018.

View Data Center

RidgeInterested in this information?Contact us

Amsterdam

Second Microsoft Azure data center building at the Agriport A7 campus in Middenmeer, becoming operational in 2017. Part of the continuous campus expansion following AMS05.

View Data Center

Campus PlusInterested in this information?Contact us

Northern Virginia

Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.

View Data Center

Edge PointInterested in this information?Contact us

Amsterdam

Sixth Microsoft Azure data center building at the Agriport A7 campus, operational circa 2020. Constructed alongside AMS11 in the fourth campus phase.

View Data Center

UltraInterested in this information?Contact us

Amsterdam

First Microsoft Azure data center building at the Agriport A7 campus in Middenmeer, commissioned in November 2015. Energy is partly supplied from co-generation at the surrounding Agriport greenhouse operations.

View Data Center

Park PrimeInterested in this information?Contact us

Wales

Microsoft is developing a large single-story data center next to Vantage's Newport campus in Newport, Wales.

View Data Center

Campus MaxInterested in this information?Contact us

Milwaukee

Microsoft has acquired 240 additional acres in Wisconsin for data centers, near its Mount Pleasant project that was paused in early 2025.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Amsterdam

Pure DC's Amsterdam Westpoort (AMS01) campus is a flagship, high-density development designed specifically to support Microsoft's hyperscale cloud infrastructure under strict municipal constraints.

View Data Center

Park BetaInterested in this information?Contact us

Chicago: Suburban

Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.

View Data Center

East PointInterested in this information?Contact us

Johor

Microsoft is further expanding its data center footprint in Malaysia by acquiring another plot of land in Johor.

View Data Center

Cloud PointInterested in this information?Contact us

Quincy

CO3.2 is the middle building of the CO3 group, which Microsoft built in 2010-2011 with Generation 4 ITPAC halls on its Columbia campus in Quincy.

View Data Center

HubInterested in this information?Contact us

Quincy

MWH01 AZ-A is one of four first-phase AZ halls on Microsoft's MWH campus in Quincy, backed by four Caterpillar 3516C 2.5 MWe generators plus one reserve unit.

View Data Center

West CenterInterested in this information?Contact us

San Antonio

Microsoft's SAT09 is a 159,000 sq ft single-story data center with a 28,000 sq ft office and loading dock area, built in 2016-2017 as the first building on Microsoft's Texas Research Park campus.

View Data Center

GammaInterested in this information?Contact us

Quincy

CO7 is a small hall that Microsoft built in 2021-2022 in the northeast corner of its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.

View Data Center

Hub TwoInterested in this information?Contact us

San Antonio

Microsoft's SAT46 is a 79,385 sq ft data center that Microsoft built in 2021-2022 on its Texas Research Park campus, mostly on the Medina County side of the county line.

View Data Center

Global HubInterested in this information?Contact us

Quincy

CO1 is the east half of the original 470,000 sq ft Columbia building, Microsoft's first data center in Quincy. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.

View Data Center

PlusInterested in this information?Contact us

Quincy

CO5 is a row of open-air modules on Microsoft's Columbia campus in Quincy, built in 2016-2018 and run without backup generators.

View Data Center

South ValleyInterested in this information?Contact us

Quincy

CO9 is a two-level building on Microsoft's Columbia campus in Quincy. Microsoft built it in 2011-2012 as CO3.1 and rebuilt it in 2022-2024 for telecommunications use.

View Data Center

Center AlphaInterested in this information?Contact us

San Antonio

Microsoft's SAT40 is a 153,227 sq ft single-story data center with administrative space at the north end of its Texas Research Park campus on Lambda Drive, built in 2023-2025.

View Data Center

Hub ProInterested in this information?Contact us

Quincy

CO4 is a row of open-air Generation 4 modules on Microsoft's Columbia campus in Quincy, built in 2013-2015 and run without backup generators.

View Data Center

AlphaInterested in this information?Contact us

Quincy

CO3.3 is the south building of the CO3 group, which Microsoft built in 2010-2011 on its Columbia campus in Quincy.

View Data Center

Center OneInterested in this information?Contact us

Quincy

CO8 is a small hall that Microsoft built in 2021-2022 at the east end of the CO4 module row on its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.

View Data Center

Point ThreeInterested in this information?Contact us

San Antonio

SAT93 is one of two planned single-story, five-colo Microsoft data centers on County Road 381 in eastern Medina County, west of San Antonio.

View Data Center

ParkInterested in this information?Contact us

San Antonio

SAT90 is one of two single-story, five-colo Microsoft data centers on a 112-acre lot on US Highway 90 west of Castroville, Texas.

View Data Center

Hub PlusInterested in this information?Contact us

London

Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.

View Data Center

Point GammaInterested in this information?Contact us

San Antonio

Microsoft's SAT11 is one of three 225,000 sq ft data centers that Microsoft built in 2018-2023 on its Texas Research Park campus.

View Data Center

Plaza PlusInterested in this information?Contact us

Northern Virginia

Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.

View Data Center

Campus TwoInterested in this information?Contact us

Virginia: Rural

Microsoft is building another data center campus near its Boydton site. Microsoft Corporation bought the vacant site where the Mecklenburg Correctional Center was once located at 960 Prison Road.

View Data Center

WestInterested in this information?Contact us

San Antonio

Microsoft plans to build yet another data center SAT16 at its campus at 3555 Westover Link in San Antonio. The project is described as a building shell and fit out associated with 245,000 square foot (22,760 sqm) data center.

View Data Center

Ridge ProInterested in this information?Contact us

Reno

Microsoft acquired 300.7 acres from Mark IV Capital within the 4,300-acre Victory Logistics District, a master-planned industrial hub located in Fernley, Nevada.

View Data Center

Park GammaInterested in this information?Contact us

San Antonio

Microsoft's SAT10 is a 159,000 sq ft single-story data center with a 17,000 sq ft office and loading dock area, the second building on Microsoft's Texas Research Park campus.

View Data Center

ValleyInterested in this information?Contact us

West Texas

Microsoft has announced plans for a massive, multibillion-dollar data center campus in Pecos, West Texas, designed to meet the skyrocketing demands of advanced AI and cloud compute.

View Data Center

Prime StationInterested in this information?Contact us

Dallas

Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.

View Data Center

CenterInterested in this information?Contact us

Quincy

This data center building, valued at $55.2 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 237,337 square feet and stands 30 feet high with 12 restrooms.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

West Virginia

The collaboration between Nscale and Microsoft functions as a landlord-tenant agreement that anchors the first phase of the Monarch Compute Campus.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

In 2024, Microsoft acquired one acre for $900,000 from Ronald Smith in Racine County, Wisconsin.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

In 2024, Microsoft acquired 28.6 acres for $5.73 million from Randall and Louise Borgardt in Racine County, Wisconsin.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Milwaukee

In 2024, Microsoft acquired 70.9 acres of mostly vacant farm land for $12.75 million from the Thomas A. Hribar Sr. Revocable Trust in Racine County, Wisconsin.

View Data Center

EastInterested in this information?Contact us

Quincy

CO2 is the west half of the original 470,000 sq ft Columbia building on Microsoft's first Quincy campus. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.

View Data Center

PrimeInterested in this information?Contact us

Johor

Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).

View Data Center

UltraInterested in this information?Contact us

Des Moines

The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.

View Data Center

ValleyInterested in this information?Contact us

Cheyenne

Microsoft is building a data center campus at Bison Business Park to support its West Central US Azure region. The plan was Announced in 2021.

View Data Center

Central ParkInterested in this information?Contact us

Northern Virginia

Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.

View Data Center

Global PlazaInterested in this information?Contact us

Quincy

Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.

View Data Center

GlobalInterested in this information?Contact us

Colorado (CO)

Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.

View Data Center

Prime PointInterested in this information?Contact us

Copenhagen

Microsoft's first data center facility in Denmark is located in the business area at Finervej, 4621 Gadstrup, Roskilde.

View Data Center

North CenterInterested in this information?Contact us

Northern Virginia

Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.

View Data Center

Central CampusInterested in this information?Contact us

Hyderabad

Building 1 is Microsoft's data center at Elikatta, near Shadnagar, south of Hyderabad. AdaniConneX developed it.

View Data Center

PlusInterested in this information?Contact us

North Rhine-Westphalia

Microsoft's planned Grevenbroich data center is a greenfield cloud and AI facility in Germany's Rhineland, part of the company's expansion across the Rhenish region of North Rhine-Westphalia. It is contingent on rezoning and remains in an early, pre-construction phase.

View Data Center

Central CenterInterested in this information?Contact us

Phoenix

In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.

View Data Center

Tower AlphaInterested in this information?Contact us

Toronto

Microsoft's YTO11 data centre is the first building of a two-phase campus on a 28.2-acre site at 6100 Langstaff Road in Vaughan, north of Toronto.

View Data Center

Edge TowerInterested in this information?Contact us

Chicago: Suburban

Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.

View Data Center

Point ProInterested in this information?Contact us

Columbus

Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.

View Data Center

AlphaInterested in this information?Contact us

Toronto

Microsoft is building a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.

View Data Center

ValleyInterested in this information?Contact us

Amsterdam

Microsoft operates a data center campus in the Hollands Kroon area in the north of the Netherlands, close to its existing facility.

View Data Center

CentralInterested in this information?Contact us

Toronto

This facility will be part of the proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," in Ontario, Canada.

View Data Center

Edge TowerInterested in this information?Contact us

Sydney

DC2 is the second data center building of Microsoft's Station Road Campus. In late 2022, a subsequent application was lodged and approved for a 22-meter-tall data center with 8,076 sqm of gross floor area.

View Data Center

Central ValleyInterested in this information?Contact us

Dublin

The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.

View Data Center

Valley GammaInterested in this information?Contact us

Dublin

The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.

View Data Center

North HubInterested in this information?Contact us

Milan

Microsoft is constructing a data center in San Bovio, a neighborhood in Peschiera Borromeo, near Milan, Italy.

View Data Center

Park ProInterested in this information?Contact us

Pune

Microsoft's Indian subsidiary, Microsoft Corporation (India) Private Limited, purchased 16.4 acres (66,414.5 sq m) of prime land in Hinjewadi, Pune, for ₹519.72 crore ($62 million).

View Data Center

Metro ParkInterested in this information?Contact us

Pune

According to property consultant Square Yards, technology giant Microsoft Corporation (India) purchased around 16 acres (66,450 sq m) of land from Viva Highways in Pune for ₹453 crore.

View Data Center

Campus BetaInterested in this information?Contact us

Köln (Cologne)

Microsoft is constructing a 270,605 sq ft data center on a 20-hectare site in Bergheim, located west of Cologne in the Rhein-Erft district.

View Data Center

CoreInterested in this information?Contact us

Milan

Microsoft is building a data center campus in Bornasco, which is located in the province of Pavia, Italy.

View Data Center

Station UltraInterested in this information?Contact us

Milan

MIL01 is the Rapid Deployment Datacenter (RDD) building on Microsoft's Settala campus: six prefabricated server modules plus an admin and loading block, each module backed by its own 1.5 MW Caterpillar diesel generator. Construction began in March 2021.

View Data Center

Tower UltraInterested in this information?Contact us

Milan

Microsoft plans to construct the "Progetto Data Center MIL03" in Settimo Milanese (MI), with Microsoft 4825 Italy S.R.L. as the proponent.

View Data Center

Plaza GammaInterested in this information?Contact us

Des Moines

Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.

View Data Center

Core PointInterested in this information?Contact us

Leeds

Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.

View Data Center

UltraInterested in this information?Contact us

Hyderabad

Microsoft is building a data center campus in Mekaguda, a village in the southern Indian state of Telangana, which is expected to start operations by 2025.

View Data Center

Edge CampusInterested in this information?Contact us

Northern Virginia

Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).

View Data Center

North CampusInterested in this information?Contact us

San Antonio

SAT94 is one of two planned single-story, five-colo Microsoft data centers on County Road 381 in eastern Medina County, west of San Antonio.

View Data Center

CenterInterested in this information?Contact us

Quincy

Microsoft Corp. is developing data centers on a 120-acre plot in East Wenatchee. The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.

View Data Center

Campus AlphaInterested in this information?Contact us

Amsterdam

Microsoft is building a new data center campus in the Hollands Kroon area in the north of the Netherlands, close to its existing facility. The campus is located at Cultuurweg 11 in Middenmeer (Het Venster).

View Data Center

UltraInterested in this information?Contact us

Sydney

Microsoft acquired the property in 2021. In early 2022, Blacktown Council approved the construction of this data center. The tech giant completed the facility in December 2023.

View Data Center

Hub BetaInterested in this information?Contact us

Des Moines

The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Quebec City

Microsoft's L'Ancienne-Lorette data centre is under construction at 6505 rue Yvon-Dolbec, on a 28-acre site in the Quebec City area. Construction began in June 2024, and Microsoft expects to finish in early 2027. Two new underground 230 kV lines feed the site's private substation.

View Data Center

Edge StationInterested in this information?Contact us

Quincy

The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.

View Data Center

Hyperscale Data CenterInterested in this information?Contact us

Quebec City

Microsoft's Donnacona data centre sits on about 17.6 acres in the Donnacona industrial park, west of Quebec City. Construction began in February 2024, the first of Microsoft's four Quebec sites, and the building was completed in November 2025. The on-site substation and sound wall are due in the second half of 2026.

View Data Center

Park OneInterested in this information?Contact us

Phoenix

In a major expansion of its cloud infrastructure, Microsoft has acquired an additional 100 acres of land adjacent to its developing 150-acre data center campus in Goodyear, Arizona.

View Data Center

North StationInterested in this information?Contact us

San Antonio

SAT89 is one of two single-story, five-colo Microsoft data centers on a 112-acre lot on US Highway 90 west of Castroville, Texas.

View Data Center

North PlazaInterested in this information?Contact us

Phoenix

The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.

View Data Center

East PointInterested in this information?Contact us

Phoenix

The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.

View Data Center

MaxInterested in this information?Contact us

Phoenix

In August 2018, Microsoft paid about $48 million for its 279-acre site near the Phoenix Goodyear Airport. The project already has three massive buildings, and Microsoft plans to construct two more buildings on the campus, for a total of five buildings.

View Data Center

CentralInterested in this information?Contact us

Norway

Microsoft plans to develop a new data center on a previously approved data center site at Kvål in Sandnes, in Norway’s Stavanger region. The project will expand Microsoft’s Norwegian cloud infrastructure and complement its existing Norway East cloud region.

View Data Center

CenterInterested in this information?Contact us

Chicago: Suburban

Microsoft is planning a large-scale data center project in Cherry Valley. The proposed development would consist of six buildings and stretch across farmland from Valley Orchard to Wheeler Road.

View Data Center

South StationInterested in this information?Contact us

Northern Virginia

Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).

View Data Center

Park PlusInterested in this information?Contact us

Quincy

CO6 is a hall that Microsoft built in 2019-2021 along the south face of CO2 on its Columbia campus in Quincy, backed by five Caterpillar 3516C 2.5 MWe generators.

View Data Center

Point OneInterested in this information?Contact us

San Antonio

Microsoft's SAT13 is one of three 225,000 sq ft data centers that Microsoft built in 2018-2023 on its Texas Research Park campus, on the Medina County side of the county line.

View Data Center

Tower UltraInterested in this information?Contact us

Quincy

Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.

View Data Center

Microsoft Azure Data Center Photos See all

Microsoft's Boydton Virginia Data Center
Source: Microsoft Austria
Microsoft's Boydton Data Center Expansion (in Progress) as of 2018
Source: Google Maps
Exterior View
Source: Baxtel
Cold Aisle Row
Source: Microsoft
Microsoft Campus in Quincy
Source: Microsoft
ITPACs at Microsoft's Quincy Campus
Source: Microsoft
Two MSFT Facilities Built as of 2018 on the TRP Campus
Source: Google Maps
Canyon Park Business Center
Source: Baxtel
Satellite View
Source: Google Maps
Microsoft's Campus in Cheyenne
Source: Microsoft
State of Azure Locations as of July 2019
Source: Microsoft
Satellite View of 23050 NE 102 St in Redmond
Source: Baxtel
Row of Server Cabinets at "Redmond Ridge 1"
Source: Baxtel
Another Row of Cabinets
Source: Foursquare
Microsoft: Grange Castle Business Park, Clondalkin
Source: Baxtel
Entrance to Microsoft's DB3 Facility
Source: Dublin Economic Monitor
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft
Container Canyon" area
Source: Baxtel
Northlake substation on campus
Source: Baxtel
Gens stacked up
Source: MH Architects
Cooling Towers
Source: MH Architects
MSFT Grange Castle Campus as of early 2020
Source: Baxtel
Microsoft's Goodyear Airport project plan
Source: Joshua Bowling/The Republic
PHX-10 and PHX-11 layout
Source: Joshua Bowling/The Republic
Yellow area shows the 147 acre lot acquired in 2019
Source: Baxtel
Map shows the 259 acre lot Microsoft acquired in 2018
Source: Baxtel
Outside of Microsoft Woodlands 9 story facility
Source: gmaps
Front side
Source: gmaps
Microsoft's Sweden data center in Gävle
Source: Baxtel
Rending of 1 of the proposed MSFT data centers in Hoffman Estates
Source: Baxtel
Proposed Microsoft Campus Plan
Source: Hoffman Estates
The former AT&T campus is shaped like a old telephone
Source: Baxtel
MSFT Expansion next to Valero data center
Source: Baxtel
Satellite image of MSFT's campus as of 2022
Source: Baxtel
Satellite view of the Grant Ave campus as of 2022
Source: Baxtel
rendering of the Osmium campus
Source: Baxtel
Conover campus site plan
Source: Baxtel
Campus overview
Source: Baxtel
Site plan as of June 2022
Source: Baxtel
Campus plans as of December 2022
Source: Baxtel
MSFT Site plan
Source: Baxtel
Site plan as of early 2024
Source: MSFT
Microsoft Balls Road Manassas Data center campus structure
Source: S Army Corps of Engineers
Approximate project area for Microsoft MNZ03 Data center
Source: Baxtel
Microsoft expansion in Mount Pleasant, WI
Source: Baxtel
Microsoft expansion in Mount Pleasant WI
Source: Baxtel
Microsoft expansion in Mount Pleasant WI
Source: Baxtel
Microsoft's property at Louis Sorenson Road
Source: Google Maps
Microsoft acquired 290 acres in Pataskala
Source: Google Maps
Rendering of Microsoft's Park Royal Data center
Source: Microsoft
Microsoft AMS13 & AMS14 at Hollands Kroon, Netherlands
Source: OD NZKG
Microsoft AMS13 & AMS14 at Hollands Kroon, Netherlands
Source: OD NZKG
Microsoft Høje-Taastrup Data Center under construction in Denmark
Source: Google Maps
Microsoft CPH03 Data Center under construction in Denmark
Source: Google Maps
Microsoft Acquires Land Near Leeds for Data Center Development
Source: Harworth Group
Renderings of the proposed Microsoft campus in Eggborough
Source: Microsoft
Rendering of Microsoft MEL4 data center in Yarraville, Victoria
Source: Dem | The Urban Developer
Microsoft San Jose Campus site at 1657 Alviso Milpitas Road
Source: Google Maps
The Lowe's store currently occupying the proposed Microsoft site
Source: Google Maps
Microsoft bought Quinn Radiators Site in Newport
Source: Quinn Radiators
Microsoft acquired land between North High Street and Canyon Road in Hebron
Source: Google Maps
Microsoft data center site plan of Union City Campus
Source: Development Authority Of Fulton County
Microsoft's site for Project Ruthenium in Des Moines
Source: Baxtel
Plan of Microsoft's Elk Grove Technology Park site
Source: CBRE
Microsoft Balls Road Campus in Manassas, Virginia
Source: US Army Corps of Engineers
Microsoft's Malaga Campus Layout.png
Source: Mark Rattner with KPQ Newsradio 560
Microsoft acquired land around Eldamain and Corneils roads in Plano, IL
Source: Google Maps
Site plan for Microsoft's El Mirage campus
Source: Microsoft
Microsoft's Alviso Way Data Center Site Plan
Source: San Jose planning and Microsoft
Rendering of Microsoft's YTO14 Data Center in Ontario, Canada
Source: Microsoft
Rendering of MSFT's MEL-05 facility
Source: Baxtel
Rendering of Mell-11
Source: Baxtel
Siteplan for the Herbata Campus
Source: Herbata / Kildaire County Council
Microsoft's first Wisconsin data center under construction in 2025
Source: Baxtel
Proposed Sitemap for Microsoft's Skelton Grange Campus outside Leeds
Source: Microsoft

Related News See all

Read ZTE Launches M8000 Micro-Module for AI Racks up to 250kW
ZTE launched the ZXEDC M8000 Intelligent Computing Micro-Module at Data Center World Asia in [Singapore](https://baxtel.com/regions/singapore), an integrated IT pod built for AI data centers. The [...

ZTE Launches M8000 Micro-Module for AI Racks up to 250kW

October 23, 2026 Singapore

ZTE launched the ZXEDC M8000 Intelligent Computing Micro-Module at Data Center World Asia in Singapore, an integrated IT pod built for AI data centers. The company announced the product in a release published Oct. 20 (ZTE). The module combines an enclosed cold aisle, liquid-cooled racks, network...

Read more
Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza
Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investme![krolmap.wid...

Krolmap Plans 225MW Off-Grid Data Center Campus in Belchite, Zaragoza

October 23, 2026 Aragon

Krolmap Engineering & Solutions plans a 225MW data center campus in Belchite, Zaragoza, that would run largely on self-generated power. The Aragonese engineering firm puts the investment at €1.5 billion ($1.68bn) for 25 hectares in the La Legua industrial park, Heraldo de Aragón reported on...

Read more
Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Norway

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans to...

Read more
Read Era4 Reveals 1GW Newport AI Campus With 400,000-GPU Target
Era4 has released details of [The Mill](https://era4.com/the-mill), an AI campus on a former steelworks in Newport, South Wales, designed to reach 1GW of power at full build-out. The campus has r![...

Era4 Reveals 1GW Newport AI Campus With 400,000-GPU Target

October 22, 2026 Wales

Era4 has released details of The Mill, an AI campus on a former steelworks in Newport, South Wales, designed to reach 1GW of power at full build-out. The campus has room for the equivalent of up to 400,000 Nvidia VR200 GPUs, and the first phase is due online in 2027. Data Center Dynamics reported...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more