CampusInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, 20019 Settimo Milanese MI, Italy
Planned
Future facility in planning stage
Operated by:

Microsoft: Progetto MIL03

Short Code: MIL03
Year Planned: 2028
Utility Provider: Terna

Microsoft plans to construct the "Progetto Data Center MIL03" in Settimo Milanese (MI), with Microsoft 4825 Italy S.R.L. as the proponent. The project underwent an Environmental Impact Assessment (VIA), which was successfully completed in May 2025.

Map and Nearby Locations

This Facility ( 131 )
Microsoft Azure Sites
Nearby Facilities

Global ParkInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of MetroInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Data4: Milan 1 DC8.1
DC8.1 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese, under construction since 2024.
NN milesInterested in this information?Contact us Data4: Milan 1 DC8.2
DC8.2 is one of two mirrored two-storey data centers on the Verdi-Tower lot of Data4's Milan 1 campus in Settimo Milanese.
NN milesInterested in this information?Contact us Data4: Milan 1 DC7
DC7 is the seventh data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a two-storey Design L' building with about 4,000 m² of IT space.
NN milesInterested in this information?Contact us Data4: Milan 1 DC9
DC9 is a two-storey data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, built to DC7's footprint with about 4,000 m² of IT space.
NN milesInterested in this information?Contact us Data4: Milan 1 DC6
DC6 is the sixth data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, a Design Y' building with about 2,000 m² of IT space.
NN milesInterested in this information?Contact us Equinix Milan ML5
Equinix ML5 is a three-floor IBX in Settimo Milanese, west of Milan, and the first building on Equinix's campus on the former Italtel site.
NN milesInterested in this information?Contact us Vaultica: MIL03
Vaultica's MIL03 is a new colocation data center on Via Marisa Bellisario in Settimo Milanese, west of Milan. It is built for enterprise, cloud and AI workloads, with modular data halls and a dedicated office building.
NN milesInterested in this information?Contact us Data4: Milan 1 DC10
DC10 is a Design Y' data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, with about 2,000 m² of IT space.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law
More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, [Il Giorno](https://www.ilgiorno.it/milano/cronaca/data-center-protesta...

Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law

November 10, 2026 Milan

More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, Il Giorno reported. The rally was the first national demonstration called by the National Network of Stop Data Center Committees. Organizers want the national government...

Read more
Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release....

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.