Top Data Center News for 30th March - 4th April, 2026
April 06, 2026
Microsoft Azure
| Distance | Site | About |
|---|---|---|
| 0.06 miles | QTS: Fayetteville DC9 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.09 miles | QTS: Fayetteville DC11 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.12 miles | QTS: Fayetteville DC10 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.12 miles | QTS: Fayetteville DC8 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.30 miles | QTS: Fayetteville DC12 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.34 miles | QTS: Fayetteville DC2 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.36 miles | QTS: Fayetteville DC14 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.37 miles | QTS: Fayetteville DC13 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.60 miles | QTS: Fayetteville DC16 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.64 miles | QTS: Fayetteville DC15 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.69 miles | QTS: Fayetteville DC5 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.70 miles | QTS: ATL2 East Campus |
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
|
| 0.76 miles | QTS: Fayetteville DC4 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.79 miles | Hyperscale Data Center Request Dataset |
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
|
| 0.83 miles | QTS: Fayetteville DC3 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.93 miles | QTS: Fayetteville DC7 |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 0.96 miles | QTS Fayetteville |
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
|
| 4.84 miles | Project Rita: Tyrone, GA (Proposed) |
A new data center campus is being planned in Fayette County, Georgia. The site would be home to ‘Project Rita’, a proposed development of two one-story data center buildings totaling 490,000 square feet (45,520 sqm), and an on-site substation. The campus would total 96MW.
|
| 6.17 miles | Fairburn Technology Center |
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
|
| 6.53 miles | T5: ATL IV |
US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia.
|
| 7.00 miles | TA Realty: Red Oak ATL03 |
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
|
| 7.34 miles | Hyperscale Data Center Request Dataset |
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
|
| 8.82 miles | Strategic Real: Palmetto Expansion | |
| 8.84 miles | Strategic Real: Palmetto |
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
|
| 9.89 miles | Vantage: Georgia GA1 |
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
|
| 11.02 miles | Crypto Mining Data Center Request Dataset |
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
|
| 11.43 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 11.46 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 11.47 miles | EdgeConneX: Atlanta ATL11-13 |
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
|
| 11.53 miles | Hyperscale Data Center Request Dataset |
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
|
| 12.31 miles | Carrier-Neutral Data Center Request Dataset | |
| 12.45 miles | Hyperscale Data Center Request Dataset |
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
|
| 12.48 miles | Carrier-Neutral Data Center Request Dataset | |
| 12.69 miles | Lumen College Park 1 | |
| 14.85 miles | Menlo Digital: Atlanta, GA |
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
|
| 15.65 miles | Digital Realty: ATL 15 |
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
|
| 15.76 miles | American Tower: SW Atlanta |
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
|
| 15.84 miles | Southeast Property: Hampton 3 |
This Facility will be part of Southeast Property Holdings LLC's Hampton Campus in Georgia.
|
| 15.92 miles | Southeast Property: Hampton 2 |
This Facility will be part of Southeast Property Holdings LLC's Hampton Campus in Georgia.
|
| 16.00 miles | Southeast Property: Hampton Campus |
Southeast Property Holdings LLC has secured approval to build a data center campus on a 133-acre site in Hampton, Georgia.
|
| 17.50 miles | TA Realty: Ellenwood, ATL |
TA Realty received site plan approval for a data center project in Ellenwood, southeast of Atlanta. The 35-acre development will be located between Dunn and Williamson roads on Tanners Church Road.
|
| 17.52 miles | Vantage: Georgia GA2 |
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
|
| 17.77 miles | Red Wolf DCD: Atlanta, GA |
New York-based real estate consulting firm Swearingen, operating through Red Wolf DCD Properties, LLC, has filed an application for a 1.25 million sq ft (116,130 sqm) data center project.
|
| 18.01 miles | Vantage: Douglasville 2 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 18.05 miles | Vantage: Douglasville 3 |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 18.05 miles | Vantage: Douglasville |
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
|
| 18.36 miles | Project Spalding |
Montana Property Group LLC is planning to build a data center campus, known as Project Spalding, outside Atlanta, Georgia. The campus will total 2.55 million square feet (236,900 sqm) on a site in Spalding County.
|
| 18.36 miles | Project Spalding Expansion | |
| 18.47 miles | PCC-DeKalb: Ellenwood, GA |
A proposal to rezone 95 acres in DeKalb County, Georgia, for a 1 million sq ft data center and electric substation has been deferred.
|
| 19.08 miles | Cogent: Atlanta 2 |
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
|
| 19.23 miles | Flexential: Douglasville 2 |
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
|
| 19.32 miles | Hyperscale Data Center Request Dataset |
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
|
| 19.37 miles | Lumen Atlanta 5 | |
| 19.37 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 19.37 miles | Flexential Douglasville |
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
|
| 19.40 miles | EdgeConneX ATL01 |
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
|
| 19.40 miles | EdgeConneX Atlanta Campus |
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
|
| 19.42 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 19.43 miles | DataBank: Lithia Springs ATL6 |
This facility will be the second data center building at DataBank's Lithia Springs Campus.
|
| 19.45 miles | DC BLOX: ATL1-C |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
|
| 19.47 miles | DataBank: Lithia Springs ATL5 |
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
|
| 19.47 miles | DC BLOX: ATL1-B |
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
|
| 19.48 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 19.50 miles | EdgeConneX ATL02 |
In 2018, EdgeConneX launched its second data center in Atlanta.
|
| 19.54 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
|
| 19.55 miles | DC BLOX: Atlanta West (ATL1) |
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
|
| 19.60 miles | DataBank Atlanta ATL2 |
|
| 19.63 miles | DataBank Atlanta ATL3 |
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
|
| 19.77 miles | 375 Riverside - Digital Realty |
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
|
| 19.77 miles | Centersquare: ATL1 |
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
|
| 19.78 miles | Hyperscale Data Center Request Dataset |
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
|
| 19.79 miles | PwC Lithia Springs |
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
|
| 19.79 miles | DataCanopy: Lithia Springs (Atlanta) | |
| 19.90 miles | Digital Realty: ATL11 |
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
|
| 19.97 miles | DataBank: Atlanta ATL4 |
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
|
Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.
An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.
With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.
An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.
Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.
Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.
Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.
April 06, 2026
Microsoft Azure
April 02, 2026
Microsoft Azure
April 02, 2026
Microsoft Azure
April 01, 2026
Microsoft Azure
March 19, 2026
Microsoft Azure
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas