The Johor data center market is located in the country of Malaysia within Asia-Pacific (APAC). Johor has 84 facilities.

The top providers in Johor are Bridge Data Centres (6 sites) and DayOne with 12 facilities . The most popular facilities are EdgeConneX: Johor and Equinix Johor JH1.

Read More

Market Facts

Johor Data Center Map

Johor Power Growth Over Time

+1258% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Johor

Name Company Size Status Type
EdgeConneX: Johor EdgeConneX Extra Large Construction, Planned Carrier-Neutral
Equinix Johor JH1 Equinix Small Operational Carrier-Neutral
Equinix: JH2 Equinix Small Construction Carrier-Neutral
Stack: JHB01A STACK INFRASTRUCTURE Extra Large Construction, Planned HPC
Stack: JHB01B STACK INFRASTRUCTURE Large Planned HPC
Global Switch: Johor Global Switch Large Planned Carrier-Neutral
Vantage: JHB11 Vantage Data Centers Large Operational Carrier-Neutral
Vantage: JHB12 Vantage Data Centers Large Planned Carrier-Neutral
Vantage: JHB13 Vantage Data Centers Extra Large Planned Carrier-Neutral
Keppel DC: Johor Sedenak 1 Keppel Data Center REIT Small Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Keppel Data Center REIT Extra Large Construction, Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Keppel Data Center REIT Extra Large Construction, Planned Carrier-Neutral
STT Johor Campus ST Telemedia Global Data Centres (STT GDC) Medium Construction Carrier-Neutral
Racks Central: Pasir Gudang RCJM1 Racks Central Large Construction, Planned Carrier-Neutral
Racks Central: RCJM2A Racks Central Large Land Bank, Planned Carrier-Neutral
Racks Central: RCJM2B Racks Central Large Land Bank, Planned Carrier-Neutral
AirTrunk Johor Bahru JHB1 AirTrunk Extra Large Operational, Planned Carrier-Neutral
AirTrunk: Johor JHB2 AirTrunk Extra Large Planned Carrier-Neutral
AirTrunk: Johor JHB3 AirTrunk Extra Large Planned Carrier-Neutral
AirTrunk: Johor JHB4 AirTrunk Extra Large Planned Carrier-Neutral
Tower TwoInterested in this information?Contact us Microsoft Azure Large Operational Hyperscale
Metro PlazaInterested in this information?Contact us Microsoft Azure Land Bank Hyperscale
West HubInterested in this information?Contact us Microsoft Azure Land Bank Hyperscale
West CenterInterested in this information?Contact us Microsoft Azure Land Bank Hyperscale
CSF: Johor CX3 CSF Group Extra Small Operational Carrier-Neutral
Bridge DC: MY06-1 Bridge Data Centres Medium Operational Carrier-Neutral
Bridge DC: MY06-2 Bridge Data Centres Large Operational Carrier-Neutral
Bridge: Plentong Bridge Data Centres Decommissioned Carrier-Neutral
Bridge DC: MY07 Phase 1 Bridge Data Centres Large Operational Carrier-Neutral
Bridge DC: MY06-3 Bridge Data Centres Large Operational Carrier-Neutral
Bridge DC: MY06-4 Bridge Data Centres Small Operational Carrier-Neutral
Bridge DC: MY06 Expansion Bridge Data Centres Prospective Expansion Carrier-Neutral
Bridge DC: MY07 Phase 2 Bridge Data Centres Extra Large Construction Carrier-Neutral
Bridge DC: MY07 Expansion Bridge Data Centres Extra Large Planned Carrier-Neutral
Empyrion: Nusajaya Campus MY1 Empyrion Digital Extra Large Construction, Planned Carrier-Neutral
NTT: Gelang Patah NTT MSC Sdn. Bhd Extra Large Construction, Planned Carrier
K2: Kulai JHR01-03 K2 Data Centres Large Operational Carrier-Neutral
K2: Kulai JHR04 K2 Data Centres Medium Operational Carrier-Neutral
K2: Kulai Expansion K2 Data Centres Extra Large Construction, Planned Carrier-Neutral
Princeton PDG: JH1 Bldg-1 Princeton Digital Group Large Operational Carrier-Neutral
Princeton PDG: JH2 Princeton Digital Group Extra Large Planned Carrier-Neutral
Princeton PDG: JH1 Bldg-2 Princeton Digital Group Large Operational Carrier-Neutral
Princeton PDG: JH1 Bldg-3 Princeton Digital Group Large Operational Carrier-Neutral
Princeton PDG: JH1 Bldg-4 Princeton Digital Group Large Construction Carrier-Neutral
Open DC JB2 Open DC Extra Small Operational Carrier
Open DC JB1 Open DC Extra Small Operational, Prospective Expansion Carrier
Digital Edge: Johor Campus Digital Edge DC Large Construction, Land Bank Carrier-Neutral
Digital Edge: Kota Tinggi, Johor Digital Edge DC Land Bank Carrier-Neutral
EC33 Johor Edge Centres Extra Small Operational Carrier-Neutral
YTL: JDC1 YTL Data Centers Extra Large Operational, Planned Carrier-Neutral
YTL: JDC2 YTL Data Centers Medium Operational Carrier-Neutral
YTL: JDC3 YTL Data Centers Large Operational Carrier-Neutral
YTL: JDC6 YTL Data Centers Large Construction, Operational Carrier-Neutral
Edgnex: Johor DAMAC Digital Land Bank Carrier-Neutral
Equalbase: Johor Equalbase Land Bank Real Estate
GDC SDN: Johor SDK1 Global Data Centre SDN. BHD. (GDC) Medium Planned Real Estate
Epoch Digital: Johor Epoch Digital Extra Large Construction, Planned Carrier-Neutral
ESR-Logos: Johor ESR Group Withdrawn Real Estate
ZData: Johor ZData Technologies Co Ltd Land Bank Carrier-Neutral
Digital Hyperspace: Johor Digital Hyperspace Malaysia SDN BHD Land Bank Private Equity
TM Nxera: Johor Nxera Extra Large Construction, Operational, Planned Carrier-Neutral
Digital Halo: Johor Digital Halo Extra Large Construction, Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
DayOne: Kempas Tech Park DayOne Large Construction Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Large Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Small Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Small Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Construction Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Small Construction Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us DayOne Small Planned Carrier-Neutral
CURRENC: Johor CURRENC Group Inc. Extra Large Construction, Planned Fintech
BrightRay: Johor MY-01 BrightRay DC Large Operational Carrier-Neutral
BrightRay: MY-02 BrightRay DC Large Construction Carrier-Neutral
BrightRay: MY-03 BrightRay DC Small Planned Carrier-Neutral
Telekom Malaysia: IPDC 1 Telekom Malaysia Medium Operational Carrier
Telekom Malaysia: IPDC 2 Telekom Malaysia Small Operational Carrier
MSFusion Johor Campus Megaspeed AI Extra Large Construction, Planned Neocloud

Largest Providers in Johor

Bridge Data Centres
Site
Power
Operational
5
219.5
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
1
Totals
6
View Provider
DayOne
Site
Power
Operational
9
226.5
Construction
3
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
12
View Provider
Princeton Digital Group
Site
Power
Operational
3
150.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider
YTL Data Centers
Site
Power
Operational
4
152.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
5
View Provider

Largest Data Centers in Johor

Location About Total SqFt Power (MW)
YTL: JDC1
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres,...
NN Request Dataset NN Request Dataset
K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
NN Request Dataset
Princeton PDG: JH1 Bldg-1
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The c...
NN Request Dataset
AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
NN Request Dataset NN Request Dataset
Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
NN Request Dataset

Sites Under Construction in Johor

Location Building SqFt Power (MW) Estimated Launch
Racks Central: Pasir Gudang RCJM1 SqFt 40 Megawatts
CURRENC: Johor SqFt 100 Megawatts Q4 2026
Vantage: JHB11 SqFt 0 Megawatts Q1 2026
TM Nxera: Johor SqFt 44 Megawatts Q1 2026
Carrier-Neutral Data CenterInterested in this information?Contact us SqFt 50 Megawatts Q2 2027
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

About This Metro

Johor, a state in southern Malaysia linked to Singapore by causeways, is known for beaches and rainforest.

Related News See all

Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release....

Read more
Read AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus
AirTrunk has secured an [A$4.25 billion green loan](https://airtrunk.com/airtrunk-secures-a4-25b-green-loan-for-syd3-western-sydney-expansion-supporting-australias-digital-economy) to fund continue...

AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus

October 28, 2026 AirTrunk

AirTrunk has secured an A$4.25 billion green loan to fund continued development of its SYD3 campus in Western Sydney. Reuters put the facility at about US$2.98 billion. Thirty-two local and international financial institutions backed the debt, which 14 lead banks underwrote. AirTrunk develops and...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 ST Telemedia Global Data Centres (STT GDC)

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.