Land Bank
Land secured for future development
Operated by:

Microsoft: Alcalá de Henares

The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.

Map and Nearby Locations:

This Facility
Microsoft Azure Sites
Nearby Facilities

Sites within 15 miles of Ridge Two

Distance Site About
1.21 miles Templus: Alcala, Madrid
4.09 miles Adam MAD Alcala
4.18 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
4.23 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
4.24 miles Hyperscale Data Center Request Dataset
4.72 miles Iridium: Carretera Nacional
The ACS Group, through its subsidiary Iridium and in collaboration with Arcano, is actively constructing a new data center on a 6.7-hectare parcel of land in Alcalá de Henares, Madrid.
5.53 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
5.89 miles Pure DC: Madrid
Data center operator Pure is developing a new facility in Madrid, Spain. Phase I of the €400 million ($463m) project includes the development of a substation and a data center.
5.95 miles Hyperscale Data Center Request Dataset
9.38 miles IPCore Madrid
9.59 miles Global Switch Madrid
9.59 miles Carrier-Neutral Data Center Request Dataset
Global Switch acquired land next to its current Madrid data centre to build a new 24,000 square metre facility.
11.08 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
11.53 miles Hyperscale Data Center Request Dataset
11.90 miles Avaio: Madrid Scorpio
Avaio Digital is developing a data center on a 10-acre site in Madrid, Spain.
12.08 miles Digital Realty: MAD2
12.10 miles Digital Realty: MAD1
12.20 miles Grupo Aire OASIX: Madrid
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
12.29 miles Hispaweb Miguel Yuste
12.33 miles Digital Realty: MAD3
12.53 miles Digital Realty: MAD4
12.55 miles Hyperscale Data Center Request Dataset
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
12.62 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
13.26 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
13.45 miles Cogent Madrid
13.84 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
13.91 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
13.93 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
13.97 miles Equinix Madrid MD1
13.97 miles Equinix Madrid MD2
14.05 miles Espanix Datacenter
14.06 miles Produban Mesena 80
14.17 miles AtlasEdge: Madrid MAD001
14.52 miles Equinix MD5
14.53 miles Prime: Madrid
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
14.56 miles Equinix MD3x
14.56 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
14.64 miles Equinix MD6
14.70 miles inAsset NixMad
14.84 miles Ibercom Madrid
15.56 miles nLighten Madrid-Lezama
16.48 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
16.66 miles Equinix MD4x
17.47 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.53 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.54 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
17.59 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
18.44 miles BBVA CPD Tres Cantos
18.88 miles Quetta: Tres Cantos
19.30 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
19.30 miles Hyperscale Data Center Request Dataset
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
19.32 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
19.86 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.

Global Center Data Center Photos (See all)

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

367
Facilities
4
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?