Latest Podcast Street AddressInterested in this information?Contact us, Centurion, South Africa.
Planned
Future facility in planning stage
Operated by:

Microsoft: Centurion, South Africa

Year Planned: 2028

Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Hub ThreeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of MaxInterested in this information?Contact us

Distance Site About
0.35 miles NTT Data: JOH1, Johannesburg
The NTT Johannesburg 1 Data Center (JOH1) is a carrier-neutral, Tier-III standard colocation and interconnection facility that supports enterprise digital infrastructure and hyperscale cloud operations in South Africa
0.42 miles NTT Johannesburg 1
0.62 miles Cosmas Data City – Samrand
The Cavaleros Group, a South African real estate firm, is expanding into the data centre sector with its new division, Cosmas Data Cities (CDC).
0.80 miles xneelo JNB1 Samrand
0.93 miles ADC Samrand JHB2
ADC´s JHB2 Samrand Data Centre is a former Standard Bank data centre
1.31 miles Digital Parks Africa: Samrand
DPA is adding 810 sqm (8,720 sq ft) and 570 racks to its existing Centurion facility, which currently features over 1,620 sqm of dedicated whitespace.
6.52 miles ADC Midrand JHB1
7.08 miles Vantage Johannesburg
The campus sits on 30 acres (12 hectares) and will feature three data centers at full build-out.
7.11 miles Vantage: JNB12
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
7.15 miles Vantage: JNB13
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
11.14 miles Teraco JB4
Located in South Africa, the JB4 facility spans 80,000 sqm (861,110 sq ft) and features 14 data halls which comprise 17,000 sqm (182,985 sq ft) of space.
14.09 miles Teraco Bredell Campus (JB2)
15.59 miles Teraco JB5
Teraco, a South African data centre operator, launched its JB5 facility in 2025.
15.60 miles OADC: Isando
Pan-African operator Open Access Data Centres (OADC) launched its Johannesburg data center in December 2022.
15.69 miles Teraco: JB7
Teraco, a Digital Realty owned South African data center operator, has broken ground on its latest facility known as JB7, located at the Isando Campus in Ekurhuleni, east of Johannesburg.
15.71 miles Teraco JB3
Teraco's JB3 facility spans 45,000 square metres of building structure, including 12,000 square metres of data white space.
15.72 miles Telehouse Johannesburg
15.72 miles Teraco Johannesburg JB1
16.87 miles Vantage: Johannesburg II
The first building of the JNB2 Islando campus consists of a 355,000 square foot (33,000 square meters) two-story data center. This is Vantage Data Centers' second campus in Johannesburg, South Africa.
16.92 miles Equinix Johannesburg JN1
17.03 miles Internet Solutions Johannesburg 158 Jan Smuts

GlobalInterested in this information?Contact us Data Center Photos See all

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?