Tower ProInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Co. Dublin, Ireland
Operational
Fully operational facility
Operated by:

Microsoft DUB 14

Site: Edge CampusInterested in this information?Contact us
Short Code: DUB14
Year Built: 2023
PUE: 1.3
Utility Provider: ESB Networks
Floors: 2
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Microsoft DUB14 is one of two two-storey data centres, with DUB15, at the west end of Microsoft's Grange Castle campus in Clondalkin, west Dublin. They sit west of DUB09, DUB10, DUB12 and DUB13.

Microsoft won permission for both buildings in May 2021. DUB14 covers 28,072 m² (302,100 sq ft) and holds five data halls. Microsoft took over the admin block and the first data hall on 24 July 2023, and the other halls followed. A 3,520 m² Gateway administration building at the business park entrance serves the whole campus.

Cooling

Rooftop air handling units cool the data halls with outside air. Evaporative cooling, fed by recycled rainwater, runs only above about 24°C.

Utility

ESB Networks serves DUB14 and DUB15 through the campus substation, extended with three 110 kV/20 kV transformers, and ESB's Corkagh 110 kV station. EirGrid operates the transmission system. No behind-the-meter generation serves DUB14.

Backup Power

Twenty-one standby generators back up the data halls. They were the first on the campus commissioned on hydrotreated vegetable oil (HVO) rather than diesel.

Campus

Microsoft runs twelve data centres at Grange Castle, from DUB03 (2009) to DUB15, plus the stand-alone DUB11.

Map and Nearby Locations

This Facility ( Nangor )
Microsoft Azure Sites
Nearby Facilities

Hub GammaInterested in this information?Contact us Power Growth Over Time

+400% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EdgeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Station PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us North HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Campus GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us East ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Center AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Park ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release. "Effective at...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?