Campus OneInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Clondalkin, Dublin 22, Dublin, Ireland
Operational
Fully operational facility
Operated by:

Microsoft DUB04

Site: Prime CampusInterested in this information?Contact us
Short Code: DUB04
Year Built: 2012
PUE: 1.17
Utility Provider: ESB Networks
Floors: 1
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Microsoft DUB04 is a single-storey data centre joined to the west end of DUB03 on Microsoft's original Grange Castle campus in Clondalkin, west Dublin. DUB05 sits just to the south.

Microsoft announced the $130 million extension in February 2012 and brought it online around the end of 2012. The building covers 112,000 sq ft.

Design

DUB04 brought Microsoft's Gen 4 modular design to Dublin. The single-storey steel-frame structure uses pre-manufactured, recycled metal cladding on a concrete pad foundation. A concrete roof carries the air handling units. Microsoft says the modular approach cut materials, carbon footprint and waste by about half compared with a traditional build. Microsoft fits out the data halls in modular increments as demand grows.

Cooling

Rooftop air handling units cool the data halls with outside air. The 2012 design dropped the DX units, adiabatic cooling and return-air fans used in DUB03. An evaporative mode now supports the air handlers on rare hot days. Microsoft runs the halls at about 75°F, with short excursions to 85°F in hot spells.

Utility

ESB Networks serves the campus from the Kilmahud 110 kV customer substation next to DUB03, switched in during January 2010. EirGrid operates the transmission system. No behind-the-meter generation serves DUB04.

Backup Power

Eleven containerised diesel generators with integrated belly tanks back up DUB04, in a generator yard north of the building.

Campus

Microsoft has since built DUB06 through DUB15 on a second campus to the east and south within Grange Castle Business Park.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

MaxInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of AlphaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Cloud CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
NN milesInterested in this information?Contact us EdgeConnex DUB01
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
NN milesInterested in this information?Contact us Edgeconnex: DUB02
NN milesInterested in this information?Contact us Central HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Edgeconnex: DUB03
NN milesInterested in this information?Contact us EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?