Plaza ProInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Clondalkin, Dublin 22, Dublin, Ireland
Operational
Fully operational facility
Operated by:

Microsoft DUB04

Site: MaxInterested in this information?Contact us
Short Code: DUB04
Year Built: 2012
PUE: 1.17
Utility Provider: ESB Networks
Floors: 1
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Microsoft DUB04 is a single-storey data centre joined to the west end of DUB03 on Microsoft's original Grange Castle campus in Clondalkin, west Dublin. DUB05 sits just to the south.

Microsoft announced the $130 million extension in February 2012 and brought it online around the end of 2012. The building covers 112,000 sq ft.

Design

DUB04 brought Microsoft's Gen 4 modular design to Dublin. The single-storey steel-frame structure uses pre-manufactured, recycled metal cladding on a concrete pad foundation. A concrete roof carries the air handling units. Microsoft says the modular approach cut materials, carbon footprint and waste by about half compared with a traditional build. Microsoft fits out the data halls in modular increments as demand grows.

Cooling

Rooftop air handling units cool the data halls with outside air. The 2012 design dropped the DX units, adiabatic cooling and return-air fans used in DUB03. An evaporative mode now supports the air handlers on rare hot days. Microsoft runs the halls at about 75°F, with short excursions to 85°F in hot spells.

Utility

ESB Networks serves the campus from the Kilmahud 110 kV customer substation next to DUB03, switched in during January 2010. EirGrid operates the transmission system. No behind-the-meter generation serves DUB04.

Backup Power

Eleven containerised diesel generators with integrated belly tanks back up DUB04, in a generator yard north of the building.

Campus

Microsoft has since built DUB06 through DUB15 on a second campus to the east and south within Grange Castle Business Park.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

GlobalInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of West HubInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us ThreeInterested in this information?Contact us
Microsoft's third data centre on its original Grange Castle campus in west Dublin, a 169,000 sq ft single-storey building completed in spring 2014.
NN milesInterested in this information?Contact us Central ValleyInterested in this information?Contact us
Microsoft's first data centre outside the US, a 303,000 sq ft two-storey building at Grange Castle in west Dublin, opened July 2009.
NN milesInterested in this information?Contact us EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
NN milesInterested in this information?Contact us Edgeconnex Dublin
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
NN milesInterested in this information?Contact us Edgeconnex: DUB02
NN milesInterested in this information?Contact us Metro CampusInterested in this information?Contact us
One of two two-storey Microsoft data centres, with DUB15, at the west end of the Grange Castle campus in Dublin. Its first of five data halls went live in July 2023.
NN milesInterested in this information?Contact us Edgeconnex: DUB03
NN milesInterested in this information?Contact us EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Plans 38GW Of Data Center Capacity By 2032
Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with le...

Microsoft Plans 38GW Of Data Center Capacity By 2032

September 11, 2026 Microsoft Azure

Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with leased capacity from third-party providers, including neoclouds such as CoreWeave, Nscale, Lambda,...

Read more
Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?